Jump to content

Bayshore MRT station

Coordinates: 1°18′53″N 103°56′37″E / 1.314712°N 103.943717°E / 1.314712; 103.943717
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Robertsky (talk | contribs) at 01:36, 5 August 2020 (update map). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.


 TE29 
Bayshore
碧湾
பேஷோர்
Mass Rapid Transit (MRT) station
Construction site of the station
General information
Coordinates1°18′53″N 103°56′37″E / 1.314712°N 103.943717°E / 1.314712; 103.943717
Owned byLand Transport Authority
Operated bySMRT Trains (SMRT Corporation)
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeUnderground
Depth22m
Platform levels2
AccessibleYes
History
Opening2023; 1 year ago (2023)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT lines
Future service
Terminus
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Bayshore
Bayshore station in Singapore

Bayshore MRT station is a future underground Mass Rapid Transit station on the Thomson-East Coast Line in Bedok, Singapore, along Bayshore Road.[1]

The station is located in the vicinity of the Bayshore Park, The Bayshore, and Costa Del Sol condominiums, as well as many other private houses and condominiums around Bayshore and Upper East Coast. The station will serve as a terminus of the Thomson-East Coast Line stage four from 2023 to 2024, where it would then be replaced by Sungei Bedok when stage five of the line opens.

History

Site entrance to construction site

On 15 August 2014, LTA announced that Bayshore station would be part of the proposed Thomson East-Coast line (TEL). The station will be constructed as part of Phase 4, consisting of 8 stations between Founders' Memorial and Bayshore, and is expected to be completed in 2023.[2][3]

The Contract T310 for the design and construction of Bayshore Station and associated tunnels was awarded to Woh Hup (Private) Ltd – Shanghai Tunnel Engineering Co (Singapore) Pte Ltd Joint Venture at a sum of S$296 million on January 2016. Construction will start in 2016, with completion in 2023.[4]

References

  1. ^ "Stages of Thomson-East Coast Line". www.lta.gov.sg. Land Transport Authority. 15 August 2014. Archived from the original on 17 August 2014. Retrieved 15 August 2014.
  2. ^ "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links in the East | Press Room | Land Transport Authority". www.lta.gov.sg. 2014-08-19. Archived from the original on 2014-08-19. Retrieved 2020-02-13.
  3. ^ "LTA | Upcoming Projects | Rail Expansion | Thomson-East Coast Line". 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.
  4. ^ "LTA | News Room | News Releases | LTA Awards Contract to Build World's First Four-In-One Depot". www.lta.gov.sg. 2020-02-13. Archived from the original on 2020-02-13. Retrieved 2020-02-13.