Jump to content

Paya Lebar MRT station

Coordinates: 1°19′04″N 103°53′33″E / 1.317767°N 103.892381°E / 1.317767; 103.892381
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ZKang123 (talk | contribs) at 12:52, 12 August 2020 (External links). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 EW8  CC9 
Paya Lebar
巴耶利峇
பாய லேபார்
Mass Rapid Transit (MRT) station
Exit A of Paya Lebar station
General information
Location30 Paya Lebar Road
Singapore 409006 (EWL)
15 Paya Lebar Road
Singapore 409049 (CCL)
Coordinates1°19′04″N 103°53′33″E / 1.317767°N 103.892381°E / 1.317767; 103.892381
Operated bySMRT Trains Ltd (SMRT Corporation) (East West and Circle lines)
Line(s)
Platforms6 (3 island platforms)
Tracks2 (East West line)
3 (Circle line) - 2 in regular operation
ConnectionsBus, Taxi
Construction
Structure typeElevated (East West line)
Underground (Circle line)
Platform levels2
ParkingYes (Paya Lebar Square, Singpost Centre, Paya Lebar Quarter)
Bicycle facilitiesYes
AccessibleYes
Other information
Fare zone2
History
Opened4 November 1989; 35 years ago (1989-11-04) (East West Line)
17 April 2010; 14 years ago (2010-04-17) (Circle Line)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT lines
Template:SMRT lines
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Paya Lebar
Paya Lebar station in Singapore

Paya Lebar MRT station is a Mass Rapid Transit (MRT) interchange station on the East West line and Circle line in Geylang, Singapore. This station is located at Paya Lebar Road near the junction of Sims Avenue at the heart of Paya Lebar Central commercial hub and the nearby Geylang Serai district.

It is the first MRT station in Singapore that serves as an interchange of both an elevated line (East West line) and an underground line (Circle line).

Despite its name, the station is not physically located in Paya Lebar. It was derived from the nearby Paya Lebar Road.

History

East West line platforms
Circle line platforms

The station originally opened on 4 November 1989, serving the East West line.[1]

On 16 March 2003, the section of Paya Lebar Road from Geylang East Central to Sims Avenue was closed to facilitate the construction of Circle MRT line. Motorists were diverted via the temporary road of Eunos Road 8. The affected section was reinstated on 23 August 2009, after the connection from the East West line to the Circle line was completed.

On 4 April 2007, a man died after being hit by a train along the East West line sector at about 10.20 am. Police said the victim, a 52-year old Chinese, was pronounced dead by paramedics at 10.45 am. East-bound services were disrupted from Aljunied to Eunos for 41 minutes but resumed by 11.02 am.

On 17 April 2010, the Circle line platforms opened,[2] shortening the travelling time from the station to Bishan where commuters can transfer to the North South line, to 13 minutes.

As with most of the above-ground stations along the East West line, the station was built without platform screen doors. Installation of half-height platform screen doors which prevent commuters from falling onto the train tracks started on 28 October that year and commenced operations on 11 January 2011 with Bedok.[3] The Circle line side of this station has been equipped with full-height platform screen doors since the operations started on 17 April 2010. It is the first underground MRT station to have a middle track, and is only usable until 14 January 2012, where short-trip service between HarbourFront & Paya Lebar were extended to Marina Bay. The middle track is only usable when trains are withdrawn after evening peak. Now, the middle track (Circle line) is not in operation with signs to let passengers know that it is not for boarding at that platform.

The station was installed with high-volume low-speed fans, which have been in operation since 14 July that year together with Kembangan.[4]

Privacy screens were installed at some parts from Paya Lebar Road all the way to Geylang East Central, to minimise the noise impact from residents since October 2016 and completed in May 2017.[5]

References

  1. ^ "Add soul to the steel". The Straits Times. 4 November 1989. Retrieved 20 October 2017 – via NewspaperSG.
  2. ^ "Transport minister announces next phase of Circle Line will open on 17 Apr". Channel NewsAsia. 26 January 2010.
  3. ^ Wong, Siew Ying (26 January 2008). "Above-ground MRT stations to have platform screen doors by 2012". Channel NewsAsia. Archived from the original on 30 July 2012. Retrieved 1 February 2012.
  4. ^ "Enhancing Connectivity and Comfort for Commuters". Land Transport Authority. 13 October 2011. Archived from the original on 25 December 2012. Retrieved 6 July 2012.
  5. ^ Railway Noise Barriers on Track