Line 6 (Wuhan Metro)
Appearance
Line 6 | |
---|---|
6 | |
Overview | |
Status | Operational |
Owner | Wuhan |
Locale | Wuhan, Hubei |
Termini | |
Stations | 27 |
Service | |
Type | Rapid transit |
System | Wuhan Metro |
Services | 1 |
Operator(s) | Wuhan Metro Group Co., Ltd. |
Rolling stock | CRRC Zhuzhou Locomotive Chinese Type A |
History | |
Opened | 28 December 2016 |
Technical | |
Line length | 36 km (22.37 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
![](http://upload.wikimedia.org/wikipedia/commons/thumb/5/5c/Route_Map_of_Wuhan_Metro_Line_6.svg/220px-Route_Map_of_Wuhan_Metro_Line_6.svg.png)
Line 6 of the Wuhan Metro was opened on 28 December 2016 along with an extension of Line 2. It is the fifth line of the Wuhan Metro to be opened since its creation.[1] The northern end of the line begins in Dongxihu District.
History
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Jinyinhu Park — Dongfeng Motor Corporation | 28 December 2016 | 35.512 km (22.07 mi) | 27 | Phase 1 |
Stations
Rolling Stock
Type | Time of manufacturing | Lines operated | Cars | Assembly | Notes |
---|---|---|---|---|---|
Type A | Line 6 | 40 train sets | Manufactured by CRRC Zhuzhou Locomotive. First 16 6-car train sets delivered in 2016.[2] |
References