Jump to content

Line 4 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by David Xuang (talk | contribs) at 02:00, 8 December 2020 (corr. use of dash). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 4
4
Toutang Station platform
Overview
Native name重庆轨道交通4号线
StatusOperational
Line number4
LocaleChongqing, China
Termini
Stations8
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2018; 5 years ago (2018-12-28)
Technical
Line length17.9 km (11.1 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

Panguilu
Hongfan depot
Shima Interchange
Yudaishan
Panxi
Dashiba
Daqingcun
Huahuiyuan
Longxi
Jiazhoulu
Min'an Ave.
Chongqing N. Station
N. Square
Toutang
Baoshuigang
Cuntan
Heishizi
Gangcheng
Taipingchong
Tangjiatuo depot
Tangjiatuo
Tieshanping
Luqi
Guoyuan Logistics Hub
Yuzui
Yanping
Shiheqing
Fusheng
Fusheng railway station
Sanbanxi
Longyi Ave.
Longxing
Gaoshita
Pufu
Tongzilin
Shichuan
Huangling
Shichuan depot

Line 4 of Chongqing Rail Transit is a rapid transit line in Chongqing, China.[1] In June 2018, debugging of the first segment of Phase I commenced.[2] The line began operating on December 28, 2018. Since June 2020, some rapid trains through operate from Line 4 into the Loop line.[3]

Opening timeline

Segment Commencement Length Station(s) Name
N. Square of Chongqing N. Railway Station – Tangjiatuo 28 December 2018 15.6 km[4] 7 Phase I
Min'an Ave. – N. Square of Chongqing N. Railway Station 11 January 2019 2.3 km 1 Phase I (one-station extension)

Stations

Phase I
Service
routes
Station
Station name Connections Distance
km
Location
E L English Chinese
align="center" style="background:#Template:CRT color; color:white" |↑ align="center" style="background:#Template:CRT color; color:white" | through-service to/from Template:CRTs via Loop line
4/01 Template:CRT stations 民安大道 Loop Yubei
4/02 Chongqing North Station (North Square)[a] 重庆北站北广场 10
4/03 Template:CRT stations 头塘 9 Jiangbei
4/04 Template:CRT stations 保税港 9
4/05 Template:CRT stations 寸滩
4/06 Template:CRT stations 黑石子
4/07 Template:CRT stations 港城
4/08 Template:CRT stations 太平冲
4/09 Template:CRT stations 唐家沱

Gangcheng station has not been opened yet.

Under construction

Phase II
Station
No.
Station name Connections Distance
km
Location
English Chinese
Template:CRT stations 铁山坪 Jiangbei
Template:CRT stations 干坝子
Template:CRT stations 鱼嘴
Template:CRT stations 鱼庙路
Template:CRT stations 高石坎
Template:CRT stations 复盛 Yubei
Template:CRT stations 王家城
Template:CRT stations 生基堡
Template:CRT stations 龙兴
Template:CRT stations 高石塔
Template:CRT stations 普福
Template:CRT stations 桐梓林
Template:CRT stations 石船南
Template:CRT stations 石船

Notes

  1. ^ The former translation is North Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station

References

  1. ^ "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016.
  2. ^ "轨道4号线不载客试运行,有望年内投用". June 21, 2018.
  3. ^ "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  4. ^ "重庆轨道交通环线东北半环、4号线一期开通试运营". December 29, 2018.