Eurus Wind Farm
Appearance
Eurus Wind Farm | |
---|---|
Country | Mexico |
Location | Juchitán de Zaragoza, Oaxaca, Mexico |
Coordinates | 16°32′25″N 94°57′14″W / 16.5403°N 94.9539°W |
Status | Operational |
Construction cost | US$550 million |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 167 |
Nameplate capacity | 250.5 MW |
The Eurus Wind Farm is a wind farm located in Juchitán de Zaragoza, Oaxaca, Mexico. The largest wind farm in Latin America, the partnership between Cemex and Acciona Energia cost US$550 million to build. Its 167 wind turbines combine to generate 250.5 megawatts (MW), sufficient power to supply about half a million people. By contrast with traditional means of power, it may reduce annual carbon dioxide emissions by 600,000 metric tons.[1][2][3]
See also
References
- ^ Acciona Completes Assembly of LatAm’s Largest Wind Farm Latin American Herald Tribune.
- ^ CEMEX announces completion of EURUS wind farm construction, 23 November 2009
- ^ First Phase of 250-MW Eurus Wind Farm, 30 January 2009