Line 4 (Fuzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by LilHelpa (talk | contribs) at 21:45, 3 March 2018 (typo; mnr copy edit). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 4
Overview
StatusPlanned
OwnerCity of Fuzhou
LocaleFuzhou, China
Termini
  • Huaxi North Road
  • Luozhou
Stations22 (Phase 1)
Service
TypeRapid transit
SystemFuzhou Metro
Services1
Operator(s)Fuzhou Metro Co., Ltd.
History
Opened2023 (scheduled)
Technical
Line length26.9 km (16.71 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationThird rail, 1,500 V DC
Route map
Template:FZM RDT/4

Line 4 of the Fuzhou Metro (Chinese: 福州地铁4号线; pinyin: Fúzhōu Dìtiě Sì Hào Xiàn) runs from Cangshan District to Cangshan District. It starts at Huaxi North Road and ends at Luozhou. The total length is 26.9 km. Line 4's color is orange. This line was scheduled to begin the construction in 2017 and end in 2021.

Stations

Phase 1 Station:[1]

  • Luozhou (Transfer Line 5)
  • Chengmen (Transfer Line 1)
  • Qianjiangcun (There is a Jinjizhui Depot)
  • Linpu
  • Exhibition Center (Transfer Line 6)
  • Jiangbiancun
  • Aofeng Road
  • Yuanyang Road
  • Qianyu (Transfer Line 2)
  • Fuxin East road
  • Huagong Road
  • Chibian
  • Yuefeng Town North
  • Tatou
  • Shengli Hospital
  • Dongjiekou
  • Baima North Road
  • West No.2 ring Road
  • Gongye Road (The North gate of Fuzhou University)
  • Yangqiao West Road
  • Hongtang Road (Transfer Line 5, There is a Hongtang Parking.)
  • Huaxi North Road

References

  1. ^ "福建招标与采购网-福州市轨道交通4号线一期工程(勘察、设计)". www.fjbid.gov.cn (in Simplified Chinese). Fujian Provincial Development and Reform Commission. Retrieved 8 February 2017.