Line 6 (Mumbai Metro)
This article needs additional citations for verification. (April 2017) |
Metro 6 | |
---|---|
Overview | |
Owner | Mumbai Metropolitan Region Development Authority (MMRDA) |
Locale | Western Suburbs, Mumbai, Maharashtra, India |
Termini |
|
Stations | 13 |
Service | |
Type | Metro |
System | Mumbai Metro |
History | |
Commenced | 2017 |
Planned opening | 2022 |
Technical | |
Line length | 14.47 km (8.99 mi) |
Character | Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Metro 6 of the Mumbai Metro, also referred to as the Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg corridor, is part of the metro system for the city of Mumbai, India. This line is fully elevated.
Plans
The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor is to have 13 stations and cost Rs. 6,672 crore. It is to be an elevated corridor.
It is to connect Swami Samarth Nagar-Lokhandwala in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, JVLR, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W) and Vikhroli-Eastern Express Highway. Metro 6 is to provide interchange with Metro 2 at Infinity Mall in Andheri, with Metro 3 at SEEPZ, with Metro 4 and the Mumbai Suburban Railway at Jogeshwari and Kanjurmarg, and with Metro 7 at JVLR. Construction is to begin by December 2018.[1] [2] It is to be ready by 2021-22.[3]
History
The line was approved by Chief Minister Fadnavis on 19 October 2016. The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities were to determine the location of trees along the alignment with an accuracy of up to 10 cm, utilizing a differential GPS (DGPS), while a digital aerial triangulation system is to help determine the types of trees, their heights and diameters.[4]
Stations
The line will consist of 13 stations starting from Swamy Samarth Nagar in Lokhandwala Complex, Andheri (West) to Vikhroli (East). It will have interchanges with Lines 2, 7, 3 and 4.[5]
# | Station | Interstation Distance | Grade | Connections |
---|---|---|---|---|
1 | Swamy Samarth Nagar | 0 km (0 mi) | Elevated | None |
2 | Adarsh Nagar | 0.7288 km (0.4529 mi) | Elevated | Line 2 (Planned) |
3 | Jogeshwari (West) | 0.9891 km (0.6146 mi) | Elevated | None |
4 | Jogeshwari-Vikhroli Link Road | 1.598 km (0.993 mi) | Elevated | Line 7 (Planned) |
5 | Shyam Nagar | 0.9619 km (0.5977 mi) | Elevated | None |
6 | Mahakali Caves | 1.5478 km (0.9618 mi) | Elevated | None |
7 | SEEPZ Village | 1.1228 km (0.6977 mi) | Elevated | Line 3 (Planned) |
8 | Saki Vihar Road | 1.1363 km (0.7061 mi) | Elevated | None |
9 | Rambaug | 1.0122 km (0.6290 mi) | Elevated | None |
10 | Powai Lake | 0.8493 km (0.5277 mi) | Elevated | None |
11 | IIT Powai | 1.0644 km (0.6614 mi) | Elevated | None |
12 | Kanjurmarg (West) | 1.658 km (1.030 mi) | Elevated | Line 4 (Planned) |
13 | Vikhroli (EEH) | 1.056 km (0.656 mi) | Elevated | None |
References
- ^ "Work on Mumbai's Metro-6 corridor to kick off by December". hindustantimes.com. Retrieved 13 August 2018.
- ^ "Mumbai: MMRDA plans to begin work on five more Metro lines by December". The Indian Express. 7 April 2017. Retrieved 7 April 2017.
- ^ "Mumbai's east-west connectivity to get a boost with another Metro corridor". hindustantimes.com. 2 March 2017. Retrieved 2 March 2017.
- ^ "MMRDA to begin tree count for Metro 6". mid-day. Retrieved 6 April 2017.
- ^ "DPR for Line 6". MMRDA.