Line 8 (Changchun Rail Transit)
Appearance
Line 8 | |
---|---|
8 | |
Overview | |
Other name(s) | Beihu Line (北湖线) |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | |
Stations | 13 |
Service | |
Type | Rapid transit |
System | Changchun Subway |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Opened | 30 September 2018 |
Technical | |
Line length | 13.4 km (8.33 mi) |
Number of tracks | 2 |
Character | Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 8 of the Changchun Subway (Chinese: 长春地铁8号线; pinyin: Chángchūn Dìtiě Bā Hào Xiàn) a rapid transit line running from south to north in northern Changchun. It will be operational on 30 September 2018. This line is 13.4 km long with 13 stations.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
North Ring Road — Guangtong Road | 30 September 2018 | 13.4 km (8.33 mi) | 13 | Phase 1 |
Service routes
stations
station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Template:CCS stations | 北环城路 | 1 | 0.00 | 0.00 | Kuancheng | ||
Template:CCS stations | 一二三中学 | 1.23 | 1.23 | ||||
Template:CCS stations | 小南 | 1.11 | 2.34 | ||||
Template:CCS stations | 小城子街 | 0.66 | 3.00 | ||||
Template:CCS stations | 北湖大桥 | 2.37 | 5.37 | ||||
Template:CCS stations | 北湖公园 | 0.95 | 6.32 | ||||
Template:CCS stations | 和安街 | 0.77 | 7.09 | ||||
Template:CCS stations | 光机路 | 1.46 | 8.55 | ||||
Template:CCS stations | 大学成路 | 1.00 | 9.55 | ||||
Template:CCS stations | 地理所 | 1.33 | 10.88 | ||||
Template:CCS stations | 奥林匹克公园 | 1.07 | 11.95 | ||||
Template:CCS stations | 广通路 | 1.25 | 13.20 | ||||
References
- ^ "9月30日前长春地铁2号线、轻轨北湖线全部通车". Sina. Jilin News Network. Retrieved 16 May 2018.