Jump to content

Pemalang-Batang Toll Road

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by BD2412 (talk | contribs) at 01:45, 6 January 2018 (dab done). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pemalang-Batang Toll Road
Pematang Toll Road
Trans-Java Toll road en.svg
Route information
Part of AH2
Maintained by PT Pemalang Batang Tol Road
Length39 km (24 mi)
Major junctions
FromPemalang
Major intersectionsBatang-Semarang Toll Road
Pejagan-Pemalang Toll Road
ToBatang
Location
CountryIndonesia
Major citiesPekalongan, Pemalang
Highway system

Pemalang-Batang Toll Road or abbreviated to Pematang Toll Road, is a 39.2 kilometer highway that connects Pemalang area with Batang, Central Java, Indonesia . This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java . This toll road is planned to be used travelers during Eid ULl Fitre holiday in 2017, although not yet covered with asphalt. Land acquisition was initially targeted for completion in December 2016, but due to some constraints, the land acquisition target withdrew to January 2017.[1]

Sections

This toll road has two sections[2],

  • Section I: (Pemalang - Pekalongan), length 20,05
  • Section II: (Pekalongan - Batang), length 16,7 km.

Toll gates

Name km Destination
Pemalang 306 Pantura
Pekalongan 326 Pekalongan
Batang
Batang 343 Batang
Kendel
Semarang
Batang-Semarang Toll Road

References

  1. ^ "Proyek Jalan Tol Pemalang-Batang Bisa Dilintasi Lebaran 2017". Tempo. Retrieved 23 December 2017.
  2. ^ "Merak-Semarang Tersambung Tol Lebaran 2017, Begini Kondisi Lahannya". Detik. Retrieved 23 December 2017.