DEx12 expressway
Appearance
Pitești–Craiova Motorway | |
---|---|
Autostrada Pitești–Craiova | |
![]() | |
Route information | |
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România | |
Length | 121 km (75 mi) (planned length) |
Major junctions | |
From | Pitești (Junction with A1) |
To | Craiova (Junction with A6) |
Location | |
Country | Romania |
Highway system | |
The Pitești-Craiova Motorway (Romanian: Autostrada Pitești–Craiova) is a planned motorway in the south-western part of Romania labelled as A12.[1] It will connect the cities of Pitești, Slatina and Craiova. It is planned to be 121 km long, with an estimated total cost of 1.66 billion euro, and reportedly shall be completed until 2021.[2]
Its construction was tendered as a concession contract in March 2013,[3] that shall be awarded until December 2013.[2][needs update] It shall also be decided whether it will be built as a motorway or an expressway.[4]
According to Transport Minister Răzvan Cuc, this road will be an express road and not a motorway[5].
See also
References
- ^ http://media.hotnews.ro/media_server1/document-2014-10-1-18214311-0-sinteza-oficiala-masterplanului-general-transport.pdf
- ^ a b "Şova: Tronsoanele de autostradă Comarnic-Braşov, Craiova-Piteşti şi centura de sud a Capitalei, gata până la alegerile din 2016". Mediafax. 12 May 2013.
- ^ "Contract de concesiune de lucrari publice privind proiectarea, constructia, finantarea, operarea si întretinerea Drumului Expres / Autostrada Craiova - Pitesti*, km 0+000 - km 121+185". CNADNR. 11 March 2013. Archived from the original on 24 December 2013.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "Craiova - Pitești, drum expres sau autostradă?". Gazeta de Sud. 31 March 2013.
- ^ romaniajournal.ro Pitesti-Craiova will be express road, not highway – Transport Minister says http://www.romaniajournal.ro/pitesti-craiova-will-be-express-road-not-highway-transport-minister-says/
External links