Sengkang MRT/LRT Station

From Wikipedia, the free encyclopedia
  (Redirected from Sengkang MRT Station)
Jump to: navigation, search
"Sengkang MRT Station", "Sengkang LRT Station" and "Sengkang Station" redirect here.
 NE16  STC 
Sengkang
盛港
செங்காங்
Sengkang
Rapid transit / Light rail
Ne16sengkang.jpg
North East Line platform of Sengkang MRT station.
Location 5 Sengkang Square
Singapore 545062
Coordinates 1°23′30″N 103°53′42″E / 1.391653°N 103.895133°E / 1.391653; 103.895133
Operated by SBS Transit (ComfortDelGro)
Line(s)
Platforms Island
Tracks 4 (2 MRT, 2 LRT)
Connections Bus, Taxi
Construction
Structure type Underground (North East Line)
Elevated (Sengkang LRT Line)
Platform levels 3
Disabled access Yes
Other information
Station code  NE16  STC 
History
Opened 18 January 2003 (East loop)
29 January 2005 (West loop)
(Sengkang LRT Line)
20 June 2003 (North East Line)
Electrified Yes
Services
|-
Preceding station   Mass Rapid Transit   Following station
towards HarbourFront
North East Line
Terminus
Light Rail Transit
towards Sengkang
Sengkang LRT
East Loop
towards Sengkang
towards Sengkang
Sengkang LRT
West Loop
towards Sengkang
Location
Passenger Service Centre located at the station.

Sengkang MRT/LRT Station (NE16/STC) is an interchange station that is part of the North East Line of the Mass Rapid Transit and the Sengkang LRT Line of the Light Rail Transit in Sengkang, Singapore.[1] It is the least deep underground MRT station in Singapore, at approximately 7 metres below ground level.

The station is integrated with Compass One together with the fully air-conditioned Sengkang Bus Interchange and Compass Heights condominium.

The artwork in this station is T.R.A.N.S.I.T.I.O.N.S. by Koh Bee Liang.[2]

Station layout[edit]

L3
LRT
Platform
Platform 2 Sengkang LRT: Route B: West Loop Inner towards  NE16  STC  Sengkang via  SW1  Cheng Lim
Sengkang LRT: Route C: East Loop Inner towards  NE16  STC  Sengkang via  SE1  Compassvale
Island platform, doors will open on the right
Platform 1 Sengkang LRT: Route A: West Loop Outer towards  NE16  STC  Sengkang via  SW8  Renjong
Sengkang LRT: Route D: East Loop Outer towards  NE16  STC  Sengkang via  SE5  Ranggung
L2 LRT Main Lobby Faregates, Ticketing Machines, Compass One, Compass Heights, Overhead Bridges
L1 MRT Main Lobby Faregates, Ticketing Machines, Passenger Service Centre, Sengkang Bus Interchange, Compass One, Compass Heights, Bus Stop
B1
MRT
Platform
Platform A North East Line MRT Singapore Destination 6.png towards  NE1  CC29  HarbourFront via  NE15  Buangkok
Island platform, doors will open on the right
Platform B North East Line MRT Singapore Destination 7.png towards  NE17  PTC  Punggol

Transport connections[edit]

Rail[edit]

Destination First Train Last Train
Mon – Fri Sat Sunday &
Public Holiday
Daily
North East Line
to NE1 HarbourFront 5.45am 5.44am 6.05am 11.30pm
to NE17 Punggol 5.37am 5.36am 5.56am 12.25am
Sengkang LRT
Platform 1
to SE1 Compassvale
5.29am 5.29am 5.49am 12.34am
Platform 2
to SE5 Ranggung
5.25am 5.25am 5.45am 12.22am
Platform 1
to SW8 Renjong
5.33am 5.33am 5.53am 12.38am
Platform 2
to SW1 Cheng Lim
5.30am 5.30am 5.50am 12.13am

References[edit]

  1. ^ "Sengkang LRT Station". SBS Transit. Retrieved 12 November 2011. 
  2. ^ "Art in Transit". SBS Transit. Retrieved 12 November 2011. 

External links[edit]