Bangi–Putrajaya Expressway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by KylieTastic (talk | contribs) at 12:59, 14 October 2017 (Reverted 1 edit by 95.145.49.75 (talk) to last revision by Amir Hamzah 2008. (TW)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Expressway -- shield}}
Expressway --
Serdang–Kinrara–Putrajaya Expressway (SKIP)
Route information
Maintained by Putrajaya Perdana Expressways Sdn Bhd (PPE)
Length17 km (11 mi)
Existed2014–present
HistoryConstruction will begin in 2015.
Major junctions
North endBandar Kinrara
Major intersections Kinrara–Damansara Expressway
FT 217 Bukit Jalil Highway
FT 29 Putrajaya–Cyberjaya Expressway
Sungai Besi Expressway Besraya Expressway
South endPutrajaya
Location
CountryMalaysia
Primary
destinations
Serdang
Seri Kembangan
Highway system

The Serdang–Kinrara–Putrajaya Expressway (SKIP) is a new expressway under planning in Klang Valley, Malaysia. The 17-kilometre (11 mi) expressway connects Serdang, Kinrara and Putrajaya. There are two sections of the expressway, the Kinrara-Putrajaya Section and Serdang Section.

The kilometre marker for the expressway is a continuation from the Kinrara–Damansara Expressway.

History

The proposed SKIP is an intra-urban expressway completing the "missing links" to the planned and existing expressway and highway networks within the Greater Kuala Lumpur. Integrating with the proposed Kinrara–Damansara Expressway (KIDEX) at Kinrara, the SKIP-KIDEX expressway will complement the intra-urban expressway network to service the travel desire route between the North and North-Eastern sector such as Damansara and Ampang and the South-Eastern sector such as Serdang, Kinrara, Putrajaya/Cyberjaya and Kuala Lumpur International Airport (KLIA) areas.

The project for the Serdang–Kinrara–Putrajaya Expressway was awarded by the Putrajaya Perdana Berhad (PPB), a company of construction, property development and expressway concessionaires in 2012. Putrajaya Perdana Expressways Sdn Bhd (PPE) (a member of Putrajaya Perdana Berhad), the developer of the expressway, was expected to begin construction of the project in early 2015. The project is expected to take three years to complete.

Features

  • There are five toll plazas.
  • Act as a bypass for Puchong.