Talk:Lea Bridge railway station
This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||
|
Source
[edit]This doesn't count as a reliable source, does it? Simply south ...... sitting on fans for just 8 years 11:05, 19 August 2014 (UTC)
Reopening
[edit]Any idea when it will reopen? Jackiespeel (talk) 14:42, 20 June 2014 (UTC)
- It is now projected for December next year. Simply south ...... sitting on fans for just 8 years 11:05, 19 August 2014 (UTC)
- Any advance on dates - and would [1] be a suitable link? Jackiespeel (talk) 19:31, 14 March 2016 (UTC)
- No; WP:BLOGS are not reliable sources. --Redrose64 (talk) 21:28, 14 March 2016 (UTC)
- Flagging up a 'indeterminate near future event' - will leave it to the experts to find relevant links. Jackiespeel (talk) 12:36, 15 March 2016 (UTC)
- FWIW it has a large sign on it saying "Opening Spring 2016", but I wouldn't take any claim made by NWR at face value. ‑ Iridescent 13:53, 15 March 2016 (UTC)
- 'Not Worth Repeating'?
- FWIW it has a large sign on it saying "Opening Spring 2016", but I wouldn't take any claim made by NWR at face value. ‑ Iridescent 13:53, 15 March 2016 (UTC)
- Flagging up a 'indeterminate near future event' - will leave it to the experts to find relevant links. Jackiespeel (talk) 12:36, 15 March 2016 (UTC)
- No; WP:BLOGS are not reliable sources. --Redrose64 (talk) 21:28, 14 March 2016 (UTC)
- Any advance on dates - and would [1] be a suitable link? Jackiespeel (talk) 19:31, 14 March 2016 (UTC)
- Abellio Greater Anglia (the line managing the station) says it will be 15 May 2016 on its station information page. The banner outside saying "Opening Spring 2016" also references a link to walthamforest.gov.uk/leabridgestation which on the one hand would be a reliable source as well but on the other hand is not very specific (yet).--Selfthinker (talk) 15:53, 7 April 2016 (UTC)
Though [2] would probably be a better place for such discussions. Jackiespeel (talk) 17:37, 15 March 2016 (UTC)
Reopening
[edit]This section needs reworking slightly - 'a new service to and from Stratford' (involving where else?) - and some of the verbs need to be put in the past tense.
Probably best done after the event (when times etc can be included). Jackiespeel (talk) 13:00, 28 April 2016 (UTC)
Do the several uses of 'were to be' need to be changed - and what about 'The station has been'? (As the even has moved from 'future possible' to 'now is') Jackiespeel (talk) 16:32, 16 May 2016 (UTC)
- Start-Class rail transport articles
- Low-importance rail transport articles
- Start-Class Stations articles
- WikiProject Stations articles
- Start-Class UK Railways articles
- Low-importance UK Railways articles
- Start-Class London Transport articles
- Low-importance London Transport articles
- WikiProject London Transport articles
- All WikiProject Trains pages