Line 11 (Shanghai Metro)
Line 11 | |
---|---|
Overview | |
Other name(s) | R3 (planned name) |
Status | Template:SHM stations under construction, other stations operational |
Locale | Shanghai (Pudong; Xuhui, Changning, Putuo, and Jiading districts) Kunshan, Jiangsu |
Termini | |
Stations | 39 |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai No. 2 Metro Operation Co., Ltd. |
Daily ridership | 1.012 million (2019 peak)[1] |
History | |
Opened | December 31, 2009 |
Technical | |
Line length | 82.4 km (51.20 mi) |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts DC) |
Operating speed | 100 km/h (62 mph) |
Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013 Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. Services run at 5-minute intervals from either Template:SHM stations or Template:SHM stations to Template:SHM stations (though a limited number of peak-hour services originating at Huaqiao terminate early at Template:SHM stations). With 82.4 km, this line is the longest in Shanghai Metro. The line is colored brown on system maps.
Service routes
Stations
Service routes |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
● | ● | Template:SHM stations | 迪士尼 | 0.00 | 0.00 | Pudong | |
● | ● | Template:SHM stations | 康新公路 | 5.08 | 5.08 | ||
● | ● | Template:SHM stations | 秀沿路 | 2.32 | 7.40 | ||
● | ● | Template:SHM stations | 罗山路 | 16 | 1.78 | 9.18 | |
● | ● | Template:SHM stations | 御桥 | 18 | 2.51 | 11.69 | |
| | | | Template:SHM stations | 严御路 | 1.73 | 13.42 | ||
● | ● | Template:SHM stations | 浦三路 | 1.46 | 14.88 | ||
● | ● | Template:SHM stations | 三林东 | 1.58 | 16.46 | ||
● | ● | Template:SHM stations | 三林 | 1.21 | 17.67 | ||
● | ● | Template:SHM stations | 东方体育中心 | 6 8 | 3.13 | 20.8 | |
● | ● | Template:SHM stations | 龙耀路 | 2.14 | 22.94 | Xuhui | |
● | ● | Template:SHM stations | 云锦路 | 0.76 | 23.70 | ||
● | ● | Template:SHM stations | 龙华 | 12 | 1.01 | 24.71 | |
● | ● | Template:SHM stations | 上海游泳馆 | 1.39 | 26.10 | ||
● | ● | Template:SHM stations | 徐家汇 | 1 9 | 1.85 | 27.95 | |
● | ● | Template:SHM stations | 交通大学 | 10 | 0.88 | 28.83 | Changning |
● | ● | Template:SHM stations | 江苏路 | 2 | 2.08 | 30.91 | |
● | ● | Template:SHM stations | 隆德路 | 13 | 1.35 | 32.26 | Putuo |
● | ● | Template:SHM stations | 曹杨路 | 3 4 | 0.98 | 33.24 | |
● | ● | Template:SHM stations | 枫桥路 | 0.81 | 34.05 | ||
● | ● | Template:SHM stations | 真如 | 1.05 | 35.10 | ||
● | ● | Template:SHM stations | 上海西站 | 15 SXH | 1.35 | 36.45 | |
● | ● | Template:SHM stations | 李子园 | 1.45 | 37.90 | ||
● | ● | Template:SHM stations | 祁连山路 | 1.35 | 39.25 | ||
● | ● | Template:SHM stations | 武威路 | 1.32 | 40.57 | ||
● | ● | Template:SHM stations | 桃浦新村 | 1.59 | 42.16 | ||
● | ● | Template:SHM stations | 南翔 | 3.13 | 45.29 | Jiading | |
● | ● | Template:SHM stations | 陈翔公路 | 2.36 | 47.65 | ||
● | ● | Template:SHM stations | 马陆 | 3.40 | 51.05 | ||
● | ● | Template:SHM stations | 嘉定新城 | 2.90 | 53.95 | ||
● | | | Template:SHM stations | 白银路 | 1.89 | 55.84 | ||
● | | | Template:SHM stations | 嘉定西 | 3.29 | 59.13 | ||
● | | | Template:SHM stations | 嘉定北 | 1.94 | 61.07 | ||
● | Template:SHM stations | 上海赛车场 | 3.15 | 64.22 | Jiading | ||
● | Template:SHM stations | 昌吉东路 | 5.27 | 69.49 | |||
● | Template:SHM stations | 上海汽车城 | 2.25 | 71.74 | |||
● | Template:SHM stations | 安亭 | 1.84 | 73.58 | |||
● | Template:SHM stations | 兆丰路 | 1.12 | 74.70 | Kunshan, JS | ||
● | Template:SHM stations | 光明路 | 3.29 | 77.99 | |||
● | Template:SHM stations | 花桥 | S1 | 1.27 | 79.26 | ||
History
The 1st phase of Line 11, which runs from Template:SHM stations to Template:SHM stations, opened on 31 December 2009.[2][3] A branch line from Template:SHM stations opened on 29 March 2010.[4]
The 2nd phase runs from Jiangsu Road to Template:SHM stations. It opened on 31 August 2013.[5]
The 3rd phase connects Luoshan Road and the Template:SHM stations. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]
From January 26, 2020 until March 24,[8] the Kunshan section of Line 11 (Anting to Huaqiao) was suspended due to the COVID-19 pandemic.[9]
On August 25, 2020, an infill station Template:SHM stations was opened.[10]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Jiangsu Road — North Jiading | 31 December 2009 | 33.0 km (20.51 mi) | 16 | Phase 1 (main section) |
Jiading Xincheng — Anting | 29 March 2010 | 12.8 km (7.95 mi) | 3 | Phase 1 (branch section) |
East Changji Road | 26 April 2011 | Infill station | 1 | |
Luoshan Road — Jiangsu Road | 31 August 2013 | 19.2 km (11.93 mi) | 12 | Phase 2 |
Anting — Huaqiao | 16 October 2013 | 7.0 km (4.35 mi) | 3 | Huaqiao extension |
Kangxin Highway — Luoshan Road | 19 December 2015 | 4.10 km (2.55 mi) | 2 | Disney extension (1st section) |
Disney Resort — Kangxin Highway | 26 April 2016 | 5.08 km (3.16 mi) | 1 | Disney extension (2nd section) |
Chenxiang Highway | 25 August 2020 | Infill station | 1 |
Rolling Stock
Type | Time of manufacturing | Series | Sets | Assembly | Notes |
---|---|---|---|---|---|
Type A | 2008–2013 | 11A01 | 66 | Tc+Mp+M+M+Mp+Tc | Manufactured by CRRC Zhuzhou Locomotive |
Type A | 2015–2016 | 11A02 | 6 | Tc+Mp+M+M+Mp+Tc | Manufactured by CRRC Changchun Railway Vehicles |
Type A | 2015–2016 | 11A03 | 10 | Tc+Mp+M+M+Mp+Tc | Manufactured by CRRC Zhuzhou Locomotive |
-
11A01 train
References
- ^ 【 1329.4万人次】3月8日上海地铁客流创历史新高 (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09.
- ^ "Archived copy". Archived from the original on 2009-01-22. Retrieved 2008-11-11.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "沪轨交9号线二期、11号线北段一期31日开通试运营".
- ^ 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
- ^ "Metro extension to open next year".
- ^ 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
- ^ "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.
- ^ "24日起上海轨交11号线恢复跨省运营". CCTV. 2020-03-23. Retrieved 2020-03-24.
- ^ Yihong, Dong (2020-01-27). "为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网". Xinmin.cn. Retrieved 2020-01-26.
- ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23.