Jump to content

Line 11 (Shanghai Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 路过者7号 (talk | contribs) at 08:12, 26 May 2021 (History). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 11
Overview
Other name(s)R3 (planned name)
StatusTemplate:SHM stations under construction, other stations operational
LocaleShanghai (Pudong; Xuhui, Changning, Putuo, and Jiading districts)
Kunshan, Jiangsu
Termini
Stations39
Service
TypeRapid transit
SystemShanghai Metro
Operator(s)Shanghai No. 2 Metro Operation Co., Ltd.
Daily ridership1.012 million (2019 peak)[1]
History
OpenedDecember 31, 2009; 14 years ago (2009-12-31)
Technical
Line length82.4 km (51.20 mi)
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts DC)
Operating speed100 km/h (62 mph)

Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013 Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. Services run at 5-minute intervals from either Template:SHM stations or Template:SHM stations to Template:SHM stations (though a limited number of peak-hour services originating at Huaqiao terminate early at Template:SHM stations). With 82.4 km, this line is the longest in Shanghai Metro. The line is colored brown on system maps.

To scale map of Shanghai Metro Line 11

Service routes

Stations

Service
routes
Station name Connections Distance
km
Location
English Chinese
Template:SHM stations 迪士尼 0.00 0.00 Pudong
Template:SHM stations 康新公路 5.08 5.08
Template:SHM stations 秀沿路 2.32 7.40
Template:SHM stations 罗山路  16  1.78 9.18
Template:SHM stations 御桥  18  2.51 11.69
Template:SHM stations 严御路 1.73 13.42
Template:SHM stations 浦三路 1.46 14.88
Template:SHM stations 三林东 1.58 16.46
Template:SHM stations 三林 1.21 17.67
Template:SHM stations 东方体育中心  6   8  3.13 20.8
Template:SHM stations 龙耀路 2.14 22.94 Xuhui
Template:SHM stations 云锦路 0.76 23.70
Template:SHM stations 龙华  12  1.01 24.71
Template:SHM stations 上海游泳馆 1.39 26.10
Template:SHM stations 徐家汇  1   9  1.85 27.95
Template:SHM stations 交通大学  10  0.88 28.83 Changning
Template:SHM stations 江苏路  2  2.08 30.91
Template:SHM stations 隆德路  13  1.35 32.26 Putuo
Template:SHM stations 曹杨路  3   4  0.98 33.24
Template:SHM stations 枫桥路 0.81 34.05
Template:SHM stations 真如 1.05 35.10
Template:SHM stations 上海西站  15  China Railway Shanghai West railway station SXH 1.35 36.45
Template:SHM stations 李子园 1.45 37.90
Template:SHM stations 祁连山路 1.35 39.25
Template:SHM stations 武威路 1.32 40.57
Template:SHM stations 桃浦新村 1.59 42.16
Template:SHM stations 南翔 3.13 45.29 Jiading
Template:SHM stations 陈翔公路 2.36 47.65
Template:SHM stations 马陆 3.40 51.05
Template:SHM stations 嘉定新城 2.90 53.95
Template:SHM stations 白银路 1.89 55.84
Template:SHM stations 嘉定西 3.29 59.13
Template:SHM stations 嘉定北 1.94 61.07
Template:SHM stations 上海赛车场 3.15 64.22 Jiading
Template:SHM stations 昌吉东路 5.27 69.49
Template:SHM stations 上海汽车城 2.25 71.74
Template:SHM stations 安亭 1.84 73.58
Template:SHM stations 兆丰路 1.12 74.70 Kunshan, JS
Template:SHM stations 光明路 3.29 77.99
Template:SHM stations 花桥  S1  1.27 79.26

History

The 1st phase of Line 11, which runs from Template:SHM stations to Template:SHM stations, opened on 31 December 2009.[2][3] A branch line from Template:SHM stations opened on 29 March 2010.[4]

The 2nd phase runs from Jiangsu Road to Template:SHM stations. It opened on 31 August 2013.[5]

The 3rd phase connects Luoshan Road and the Template:SHM stations. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]

From January 26, 2020 until March 24,[8] the Kunshan section of Line 11 (Anting to Huaqiao) was suspended due to the COVID-19 pandemic.[9]

On August 25, 2020, an infill station Template:SHM stations was opened.[10]

Segment Commencement Length Station(s) Name
Jiangsu Road — North Jiading 31 December 2009 33.0 km (20.51 mi) 16 Phase 1 (main section)
Jiading Xincheng — Anting 29 March 2010 12.8 km (7.95 mi) 3 Phase 1 (branch section)
East Changji Road 26 April 2011 Infill station 1
Luoshan Road — Jiangsu Road 31 August 2013 19.2 km (11.93 mi) 12 Phase 2
Anting — Huaqiao 16 October 2013 7.0 km (4.35 mi) 3 Huaqiao extension
Kangxin Highway — Luoshan Road 19 December 2015 4.10 km (2.55 mi) 2 Disney extension (1st section)
Disney Resort — Kangxin Highway 26 April 2016 5.08 km (3.16 mi) 1 Disney extension (2nd section)
Chenxiang Highway 25 August 2020 Infill station 1

Rolling Stock

Type Time of manufacturing Series Sets Assembly Notes
Type A 2008–2013 11A01 66 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Zhuzhou Locomotive
Type A 2015–2016 11A02 6 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles
Type A 2015–2016 11A03 10 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Zhuzhou Locomotive

References

  1. ^ 【 1329.4万人次】3月8日上海地铁客流创历史新高 (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09.
  2. ^ "Archived copy". Archived from the original on 2009-01-22. Retrieved 2008-11-11.{{cite web}}: CS1 maint: archived copy as title (link)
  3. ^ "沪轨交9号线二期、11号线北段一期31日开通试运营".
  4. ^ 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
  5. ^ "Metro extension to open next year".
  6. ^ 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
  7. ^ "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.
  8. ^ "24日起上海轨交11号线恢复跨省运营". CCTV. 2020-03-23. Retrieved 2020-03-24.
  9. ^ Yihong, Dong (2020-01-27). "为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网". Xinmin.cn. Retrieved 2020-01-26.
  10. ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23.