Line 11 (Shanghai Metro)
Line 11 | |
---|---|
Overview | |
Other name(s) | R3 (planned name); Shenjia line (Chinese: 申嘉线) |
Native name | 上海地铁11号线 |
Status | Operational |
Owner | Shanghai Rail Transit Shenjia Line Development Co., Ltd. (Shanghai segment) Kunshan Rail Transit Investment Development Co., Ltd. (Kunshan segment) |
Locale | Pudong; Xuhui, Changning, Putuo, and Jiading districts, Shanghai, China Kunshan, Jiangsu, China |
Termini | |
Stations | 39 (plus reserve station Yanyu Road) |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Services | Mainline: Disney Resort ↔ North Jiading Branchline: Disney Resort ↔ Huaqiao |
Operator(s) | Shanghai No. 2 Metro Operation Co. Ltd. |
Depot(s) | Shanghai Circuit Depot; North Jiading parking lot; Chuanyang River parking lot |
Rolling stock | 82 Type A 6-car trains |
Daily ridership | 1.012 million (2019 peak)[1] |
History | |
Commenced | December 30, 2005 |
Opened | December 31, 2009 |
Last extension | April 26, 2016 |
Technical | |
Line length | 82.4 km (51.20 mi) |
Number of tracks | 2 |
Character | Underground, open cut + elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts DC) |
Operating speed | 100 km/h (62 mph) Average speed: 40.3 km/h (25 mph) (mainline) 38.8 km/h (24 mph) (branchline) |
Signalling | Thales’ SelTracTM CBTC |
Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013 Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. With a single-line mileage of 82.386 kilometers, is the longest single-line subway line in China and the world. The line is colored brown on system maps.
History
The line 11 was originally planned to be from Jiading to Nanhui New City, with a total length of 120 kilometers, the south part of the line has been transferred to line 16.
The 1st phase of line 11, which runs from North Jiading to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]
The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]
The 3rd phase connects Luoshan Road and the Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]
From January 26, 2020 until March 24,[8] the Kunshan section of line 11 (Anting to Huaqiao) was suspended due to the COVID-19 pandemic.[9]
On August 25, 2020, an infill station Chenxiang Highway was opened.[10]
From February 14, 2022, the Kunshan section of line 11 was again suspended due to the COVID-19 pandemic.[11]
Shanghai Metro Line 11 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
Jiangsu Road — North Jiading | 30 Dec 2005 | 31 Dec 2009 | 33.0 km (20.51 mi) | 16 | Phase 1 (main section) | ¥18.95 billion |
Jiading Xincheng — Anting | 30 Dec 2005 | 29 Mar 2010 | 12.8 km (7.95 mi) | 3 | Phase 1 (branch section) | |
East Changji Road | 26 Apr 2011 | Infill station | 1 | |||
Luoshan Road — Jiangsu Road | 19 Dec 2008 | 31 Aug 2013 | 19.2 km (11.93 mi) | 12 | Phase 2 | ¥12.965 billion |
Anting — Huaqiao | 27 Oct 2010 | 16 Oct 2013 | 7.0 km (4.35 mi) | 3 | Huaqiao extension | ¥1.849 billion |
Kangxin Highway — Luoshan Road | 28 May 2013 | 19 Dec 2015 | 4.10 km (2.55 mi) | 2 | Disney extension (1st section) | ¥4.371 billion |
Disney Resort — Kangxin Highway | 28 May 2013 | 26 Apr 2016 | 5.08 km (3.16 mi) | 1 | Disney extension (2nd section) | |
Chenxiang Highway | 25 Aug 2020 | Infill station | 1 | |||
Controversy
Due to the long length of line 11 and high passenger volumes, it is common for line 11 passengers to be forced to stand on the train for their entire trip. In response to this, around early 2014, some passengers that travelled long distances between urban area and the suburban areas of Jiading or Sanlin that cannot bear standing for a long time started bringing their own small folding seats into the carriages. In the following years, the official Weibo of Shanghai Metro reminded passengers involved phenomenon to be safe and civilized as Shanghai Metro maintains that these foldable seats can be a safety hazard on trains and reduces capacity. Beginning in 2019, line 11 started having announcements in carriages to remind passengers to not bring and use their own seats on the train.[12][13]
Stations
Service routes
Shanghai Metro Line 11 service routes | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
Routes | Station name | Connections | Distance | Location | Open- ing |
Plat- form[14] | ||||
M | P | English | Chinese | km | min | |||||
Mainline | ||||||||||
◕ | ◕ | Disney Resort | 迪士尼 | 0.00 | 0.00 | 0 | Pudong | 26 April 2016[15] |
Underground Island[16] | |
◕ | ◕ | Kangxin Highway | 康新公路 | 5.08 | 5.08 | 5 | 19 Dec 2015[17] |
Elevated Side | ||
◕ | ◕ | Xiuyan Road | 秀沿路 | 2.32 | 7.40 | 8 | ||||
◐ | ◐ | Luoshan Road | 罗山路 | 16 | 1.78 | 9.18 | 11 | 31 Aug 2013[18] |
Elevated Island | |
◐ | ◐ | Yuqiao | 御桥 | 18 | 2.51 | 11.69 | 14 | Underground Island | ||
| | | | Yanyu Road | 严御路 | 1.73 | 13.42 | 17 | Reserve | Underground Island | ||
◐ | ◐ | Pusan Road | 浦三路 | 1.46 | 14.88 | 19 | 31 Aug 2013[18] |
Underground Side | ||
◐ | ◐ | East Sanlin | 三林东 | 1.58 | 16.46 | 21 | Underground Island | |||
● | ● | Sanlin | 三林 | 1.21 | 17.67 | 23 | Underground Double Island | |||
● | ● | Oriental Sports Center | 东方体育中心 | 6 8 | 3.13 | 20.8 | 28 | Underground Double Island (shared with 6 ) | ||
● | ● | Longyao Road | 龙耀路 | 2.14 | 22.94 | 31 | Xuhui | Underground Island | ||
● | ● | Yunjin Road | 云锦路 | 0.76 | 23.70 | 33 | ||||
● | ● | Longhua | 龙华 | 12 | 1.01 | 24.71 | 35 | |||
● | ● | Shanghai Swimming Center | 上海游泳馆 | 1.39 | 26.10 | 38 | ||||
● | ● | Xujiahui | 徐家汇 | 1 9 | 1.85 | 27.95 | 41 | |||
● | ● | Jiaotong University | 交通大学 | 10 | 0.88 | 28.83 | 43 | Changning | ||
● | ● | Jiangsu Road | 江苏路 | 2 | 2.08 | 30.91 | 46 | 31 Dec 2009[19] | ||
● | ● | Longde Road | 隆德路 | 13 | 1.35 | 32.26 | 49 | Putuo | ||
● | ● | Caoyang Road | 曹杨路 | 3 4 14 [i] | 0.98 | 33.24 | 51 | Underground Double Island[ii] | ||
● | ● | Fengqiao Road | 枫桥路 | 0.81 | 34.05 | 53 | Underground Island | |||
● | ● | Zhenru | 真如 | 14 | 1.05 | 35.10 | 55 | Underground Side & Island | ||
● | ● | Shanghai West Railway Station | 上海西站 | 15 SXH | 1.35 | 36.45 | 57 | Underground Island | ||
● | ● | Liziyuan | 李子园 | 1.45 | 37.90 | 60 | ||||
● | ● | Qilianshan Road | 祁连山路 | 1.35 | 39.25 | 62 | ||||
● | ● | Wuwei Road | 武威路 | 1.32 | 40.57 | 65 | ||||
● | ● | Taopu Xincun | 桃浦新村 | 1.59 | 42.16 | 67 | ||||
● | ● | Nanxiang | 南翔 | 3.13 | 45.29 | 71 | Jiading | Elevated Side & Island | ||
◑ | ◑ | Chenxiang Highway | 陈翔公路 | 2.36 | 47.65 | 74 | 25 Aug 2020[20] |
Elevated Side | ||
◑ | ◑ | Malu | 马陆 | 3.40 | 51.05 | 78 | 31 Dec 2009[19] | |||
◑ | ◑ | Jiading Xincheng | 嘉定新城 | 2.90 | 53.95 | 82 | Elevated Side & Island | |||
Mainline | ||||||||||
◔ | | | Baiyin Road | 白银路 | 1.89 | 55.84 | 84 | Jiading | 31 Dec 2009[19] |
Elevated Side | |
◔ | | | West Jiading | 嘉定西 | 3.29 | 59.13 | 88 | Elevated Island | |||
◔ | | | North Jiading | 嘉定北 | 1.94 | 61.07 | 91 | Elevated Side | |||
Branchline | ||||||||||
◔ | Shanghai Circuit | 上海赛车场 | 3.15 | 64.22 | 86 | Jiading | 29 March 2010[21] |
Open-cut Side | ||
◔ | East Changji Road | 昌吉东路 | 5.27 | 69.49 | 91 | 26 April 2011[22] | At-grade Side | |||
◔ | Shanghai Automobile City | 上海汽车城 | 2.25 | 71.74 | 94 | 29 March 2010[21] |
Elevated Side | |||
◔ | Anting | 安亭 | 1.84 | 73.58 | 97 | Elevated Island | ||||
◔ | Zhaofeng Road | 兆丰路 | 1.12 | 74.70 | 100 | Kunshan, JS | 16 Oct 2013[23] | |||
◔ | Guangming Road | 光明路 | 3.29 | 77.99 | 104 | Elevated Side | ||||
◔ | Huaqiao | 花桥 | S1 (Suzhou Rail Transit u/c) | 1.27 | 79.26 | 107 | ||||
Passengers going to Huaqiao at Disney Resort Station, Kangxin Highway Station and Xiuyan Road Station during rush hour have to transfer at Jiading Xincheng Station.
| ||||||||||
Important stations
Future expansions
In 2023, Huaqiao will be a transfer station to line S1 of Suzhou Rail Transit, linking the line with Kunshan in Suzhou.
Yanyu Road station
Although Yanyu Road station is part of the second phase of Line 11, it did not open with the other stations on August 31, 2013.[24] Instead, it has been left as a reserved station under construction that will open in the future pending development in the area.[25][26]
Baojia line
The planned Baojia line is planned to take over the branch line Jiading Xincheng - Huaqiao.
Station name change
- On May 7, 2011, Jiyang Road was renamed Oriental Sports Center (before line 11 began serving the station).
Headways
Shanghai Metro Line 11 headway[27] | |||||||
---|---|---|---|---|---|---|---|
Time | North Jiading - Jiading Xincheng & Huaqiao - Jiading Xincheng |
Jiading Xincheng - Nanxiang |
Nanxiang - Luoshan Road |
Luoshan Road - Disney Resort | |||
Monday - Friday (Working Days) | |||||||
AM peak | 7:30-9:00 | Southbound: 6 - 10 min Northbound: 7 min and 30 sec - 10 min |
Southbound: 3 min Northbound: 3 min and 45 sec |
Southbound: 2 min Northbound: 2 min and 30 sec |
Southbound: 6 min Northbound: 7 min and 30 sec | ||
Off-peak | 9:00–17:00 | About 12 min | About 6 min | ||||
PM peak | 17:00–19:00 | Southbound: 7 min Northbound: 6 min |
Southbound: 3 min and 30 sec Northbound: 2 min and 30 sec |
Southbound: 7 min Northbound: 6 min | |||
Other hours |
|
About 12-18 min | About 5 – 7 min | ||||
Saturday and Sunday (Weekends) | |||||||
Peak | 8:00–20:00 | 10 min | About 5 min | ||||
Other hours |
|
About 10-12 min | About 6-8 min | ||||
Technology
Rolling Stock
Shanghai Metro Line 11 rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Set | Manufacturer | Time of manufac- turing |
Type | No of car |
Assembly[i] | Series | Number | Notes |
66 | CRRC Zhuzhou Locomotive Co., Ltd. | 2008-2011 | A[ii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A01 | 1101-1166 | [28] Some of the trains are Disney-themed trains, and the inside and outside of the trains are packaged with Disney cartoon elements. Original set name: AC16. |
6 | CNR Changchun Railway Vehicles Co., Ltd. | 2015-2016 | A[ii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A02 | 1167-1172 | |
10 | CRRC Zhuzhou Locomotive Co., Ltd. | 2015-2016 | A[ii] | 6 | Tc+Mp+M+M+Mp+Tc | 11A03 | 1173-1182 | |
-
11A01 train
References
- ^ 【 1329.4万人次】3月8日上海地铁客流创历史新高 (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09.
- ^ "International Railway Journal - Rail and Rapid Transit Industry News Worldwide". Archived from the original on 2009-01-22. Retrieved 2008-11-11.
- ^ "沪轨交9号线二期、11号线北段一期31日开通试运营".
- ^ 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.
- ^ "Metro extension to open next year".
- ^ 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.
- ^ "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.
- ^ "24日起上海轨交11号线恢复跨省运营". CCTV. 2020-03-23. Retrieved 2020-03-24.
- ^ Yihong, Dong (2020-01-27). "为阻断疫情传播,上海轨交11号线花桥站至安亭站区段停运_新民社会_新民网". Xinmin.cn. Retrieved 2020-01-26.
- ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23.
- ^ Hui, Liu (2022-02-14). "上海轨交11号线昆山段3站暂停运营". eastday.com. Retrieved 2022-04-28.
- ^ Shanghai line 11 warns the "bench family" for the first time: Do not use your own small bench in the carriage. Xinmin Evening News. 2019-02-20
- ^ Xiong Yingqi. Passengers of Shanghai Metro Line 11 board the train with a bench and become a unique warning. Beijing Youth Daily. 2019-02-21.
- ^ 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
- ^ 上海地铁迪士尼站下周二开站 末班车最晚22:30. 新民网. 2016-04-21. Retrieved 2016-04-21.
- ^ 11号线迪士尼段正式命名 地铁"迪士尼"站亮相. 东方网. 2014-12-10.
- ^ 上海地铁运管中心 (2015-12-17). 12月19日起 11、12、13号线新延伸段建成试运营. Shanghai Metro Official Site. Retrieved 2015-12-17.
- ^ a b 上海地铁运管中心 (2013-08-29). 11号线二期8月31日起通车试运营. Retrieved 2013-08-29.
- ^ a b c 上海轨交9号线2期11号线北段1期12月31日开通. Tencent (QQ) News. 2009-12-28.
- ^ "上海轨道交通11号线陈翔公路站将于8月25日开通". 2020-08-23.
- ^ a b 3月29日11号线支线嘉定新城—安亭通车试运营 11号线"Y型"线路运营同步覆盖早晚高峰. Shanghai Metro Official Site. 2010-03-26.
- ^ 11号线昌吉东路站开通 方便周边乘客. Shanghai Metro Official Site. 2011-04-28.
- ^ 上海地铁11号线今开通花桥段 安亭到花桥仅10分钟. 东方网. Retrieved 2013-10-17.
- ^ Shanghai Metro (2013-08-29). 11号线二期8月31日起通车试运营 (in Chinese). Retrieved 2013-08-29.
- ^ 途经5个区可换乘11条轨交 11号线北段二期今年内完工. Eastday (in Chinese (China)). 2012-08-05.
- ^ 上海市轨道交通11号线北段工程补充环境影响评价公示 (in Chinese)
- ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
- ^ 上海市轨道交通十一号线北段车辆. 中车株洲电力机车有限公司 (in Chinese). 2013-11-24. Retrieved 2020-03-20.