Vulcano-class logistic support ship
History | |
---|---|
Italy | |
Name | Vulcano |
Ordered | 7 May 2015[1] |
Builder | Fincantieri |
Cost | Italy: €374.6 million (2019) for the first unit |
Laid down | 9 February 2016[2] |
Launched | 22 June 2018 |
Acquired | 2 Italian Navy (+1 on option) and 4 French Navy |
Commissioned | 12 March 2021 |
Identification | A5335 |
General characteristics | |
Type | Logistic support ship |
Displacement | 27,200 t (26,800 long tons) full load |
Length | |
Beam | 27.2 m (89 ft 3 in) |
Draft | 16.3 m (53 ft 6 in) |
Depth | 8.4 m (27 ft 7 in) |
Propulsion |
|
Speed |
|
Range | 7,000 nmi (13,000 km; 8,100 mi) at 16 knots (30 km/h; 18 mph) |
Endurance | 30 days |
Complement | 188 (+5) + 42 transported + 13 hospitalised |
Crew | 167 |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | 2 helicopters AW-101 |
Aviation facilities |
|
Notes |
|
Vulcano is an auxiliary ship that entered service with the Italian Navy on 12 March 2021.[7] She is designed to support fleet operations with fuel and dry stores. Along with another future sister ship, she is expected to replace the replenishment oilers (AORs)Stromboli-class replenishment oiler. Vulcano was financed under the 2014 Naval Law,[8] for €346 million, then increased to €374.6 million, when the length was extended by 12 metres (39 ft). A second vessel was ordered in January 2022 for projected delivery in 2025. The Navy also has an option for a third ship of the class.[9]
The French Navy through OCCAR ordered four modified ships of the class to replace its Durance-class tankers to be delivered in 2023, 2025, 2027 and 2029. The program is known as the Bâtiment ravitailleur de forces (BRF).[10][11] France officially joined the program in October 2018.[12][13] The French BRF ships will be 1 metre (3 ft 3 in) longer at 194 m (636 ft 6 in) and 31,000 tons full load displacement compared to 27,200 tons, reflecting the French fleet's greater need for aviation fuel.[14]
Design and construction
Vulcano was built by Fincantieri as hull number 6259. The stern section was built at the Riva Trigoso Naval Shipyard and the bow section is being built at the Castellammare di Stabia (Naples) Naval Shipyard. On the night of 22/23 July 2018, a fire broke out on the ship's stern superstructure.[15]
Vulcano is designed as a support ship able to supply a large naval squadron at sea.[16] She was commissioned in March 2021. A second ship of the class, Jacques Chevallier, is under construction for the French Navy and steel was cut on a second ship of the class for the French Navy in February 2022[17] and on a second ship for the Italian Navy in July 2022.[18]
The ships have the capability to:
- refuel ships
- produce fresh water
- carry cargo
- Hospital NATO Role 2 LM[19]
- conduct repairs at sea with integrated maintenance workshops
She has a cargo capacity of up to 15,500 t, of which, "at least":
- 7.655 t (7.534 long tons) (+9,000 m3) of NATO F76 diesel fuel[20]
- 3.240 t (3.189 long tons) (+4,000 m3) of NATO F44/JP5 aviation fuel
- 830 t (820 long tons) of fresh water
- 220 t (220 long tons) of ammunitions
- 40 t (39 long tons) of meals (30,000 food rations)
- 3 m3 of gasoline in barrels
- 15 t (15 long tons) of lubricant in barrels
- 20 t (20 long tons) of solid goods
- up to 8 x ISO1C standard containers, 28 t (28 long tons) each one
Ships of the class
Italics indicate the estimated date
Pennant no. | Name | Builder | Laid down | Launched | Commissioned | Homeport | ||
---|---|---|---|---|---|---|---|---|
Italian Navy | ||||||||
A 5335 | Vulcano | Fincantieri (Muggiano) | 13 October 2016 | 22 June 2018 | 12 March 2021 | La Spezia | ||
TBC | 2025 | Taranto | ||||||
French Navy Bâtiment ravitailleur de forces[13] | ||||||||
Jacques Chevallier | Chantiers de l'Atlantique (Saint-Nazaire) | 24 December 2021[21] | 29 April 2022[22][23] | 2023[10] | ||||
Jacques Stosskopf[24] | 2022 | 2025 | ||||||
Émile Bertin[24] | 2024 | 2027 | ||||||
Gustave Zédé[24] | 2026 | 2029 |
References
- ^ "Fincantieri and Finmeccanica will renew the Italian Navy's fleet" (Press release). Leonardo Company. 7 May 2015. Retrieved 18 June 2021.
{{cite press release}}
: CS1 maint: url-status (link) - ^ "Riva Trigoso: Works start on the Logistic Support Ship" (Press release). Fincantieri. 2 December 2016.
{{cite press release}}
: CS1 maint: url-status (link) - ^ a b "MAN 175D Wins First Orders".
- ^ "Leonardo, global leader for the naval sector" (Press release). Leonardo Company. 13 October 2016. Retrieved 18 June 2021.
{{cite press release}}
: CS1 maint: url-status (link) - ^ "Columbus" (PDF). GEM Elettronica. Retrieved 18 June 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "HASR-100" (PDF). GEM Elettronica. Retrieved 18 June 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ Archus, Dorian (12 March 2021). "Italian Navy commissions Vulcano Logistic Support Ship". Naval Post. Retrieved 12 March 2021.
- ^ "Le navi del programma 2014" (in Italian). Marina Militare. Archived from the original on 29 November 2016. Retrieved 13 November 2016.
- ^ "Fincantieri to Build Second LSS for the Italian Navy". SeaWaves Magazine. 5 January 2022. Retrieved 7 January 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ a b Groizeleau, Vincent (14 April 2021). "Marine nationale : le BRF Jacques Chevallier sera livré en 2023". Mer et Marine. Retrieved 18 June 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ Cabirol, Michel (15 June 2018). "Pétrolier ravitailleur : la France monte à bord du programme italien Vulcano". Le Tribune (in French). Retrieved 18 June 2021.
{{cite news}}
: CS1 maint: url-status (link) - ^ Peruzzi, Luca (26 October 2018). "Euronaval 2018: France joins LSS programme to meet FLOTLOG requirement". IHS Jane's 360. Paris. Archived from the original on 26 October 2018. Retrieved 29 October 2018.
- ^ a b "OCCAR: order of a new fleet of logistic support ships for the French Navy". European Defence Review. 31 January 2019. Retrieved 10 November 2019.
{{cite web}}
: CS1 maint: url-status (link) - ^ Vavasseur, Xavier (18 May 2020). "Construction Begins for French Navy's Next Gen Replenishment Tanker Chevallier-class 'BRF'". Naval News. Retrieved 18 June 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ Peruzzi, Luca (25 July 2018). "Fire breaks out on unfinished Italian support ship". Jane's Information Group. Archived from the original on 26 July 2018. Retrieved 25 July 2018.
A fire broke out, for reasons unknown, aboard the logistic support ship (LSS) Vulcano on the night of 22/23 July.
- ^ Parapetto, Marco (30 June 2016). "Stato Maggiore Marina" (PDF). Naples Shipping Week (in Italian). Retrieved 18 June 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ Vavasseur, Xavier (7 February 2022). "Fincantieri Cuts Steel For French Navy Second Logistic Support Ship". Naval News. Retrieved 29 April 2022.
- ^ "Fincantieri Cuts Steel of Second LSS for Italian Navy". 21 July 2022.
- ^ "Keel Laying Ceremony in Castellammare di Stabia for LSS". OCCAR. Archived from the original on 20 November 2016. Retrieved 19 November 2016.
- ^ "LSS: Logistic Support Ship" (in Italian). Marina Militare. Archived from the original on 18 August 2018. Retrieved 18 August 2018.
- ^ Vavasseur, Xavier (24 December 2021). "Low Key Keel Laying For French Navy's New Class Of Logistic Support Ship". Naval News. Retrieved 24 December 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ Daheron, Nicolas (29 April 2022). "Saint-Nazaire. Chantiers de l'Atlantique : le navire militaire Jacques-Chevallier mis à flot". Ouest France (in French). Retrieved 29 April 2022.
- ^ Vavasseur, Xavier (27 April 2022). "French Navy's First BRF Supply Ship to be Launched on Friday". Naval News. Retrieved 29 April 2022.
- ^ a b c Lagneau, Laurent (18 May 2020). "Le futur Bâtiment ravitailleur de forces prendra le nom de l'ingénieur du génie maritime " Jacques Chevallier "". Opex360 (in French). Retrieved 18 June 2021.
{{cite web}}
: CS1 maint: url-status (link)
External links
- Ships Marina Militare website