White Creek Wind Farm

Coordinates: 45°43′36″N 120°50′02″W / 45.72667°N 120.83389°W / 45.72667; -120.83389
From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Citation bot (talk | contribs) at 00:01, 21 August 2022 (Alter: title. | Use this bot. Report bugs. | Suggested by AManWithNoPlan | #UCB_CommandLine 1525/11280). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

The White Creek Wind Farm is an electricity generating wind farm facility in Klickitat County, Washington, United States. It is owned by Last Mile Electric Cooperative and began operations in 2007. The facility has a generating capacity of 205 megawatts.[1][2]

See also[edit]

References[edit]

  1. ^ "AWEA - Projects". www.awea.org. Archived from the original on December 31, 2008.
  2. ^ "Home". www.nreca.org. Archived from the original on December 17, 2009.

External links[edit]

45°43′36″N 120°50′02″W / 45.72667°N 120.83389°W / 45.72667; -120.83389