Jump to content

Biggleswade railway station: Difference between revisions

Coordinates: 52°05′06″N 0°15′40″W / 52.085°N 0.261°W / 52.085; -0.261
From Wikipedia, the free encyclopedia
Content deleted Content added
Updated figures
m Added ref
Line 27: Line 27:
Biggleswade has two large platforms and 4 main rail lines, a pair of "up and down" slow lines used by stopping services and a pair of "up and down" fast lines used by high speed services passing through. A fifth line extends off the "up" slow line which links into the remaining sidings used by Plasmor.
Biggleswade has two large platforms and 4 main rail lines, a pair of "up and down" slow lines used by stopping services and a pair of "up and down" fast lines used by high speed services passing through. A fifth line extends off the "up" slow line which links into the remaining sidings used by Plasmor.


The stations platforms are currently being lengthened so that they can cope with 12 car trains, which will serve the station following the completion of the [[Thameslink Programme]].
The stations platforms are currently being lengthened so that they can cope with 12 car trains, which will serve the station following the completion of the [[Thameslink Programme]].<ref>http://www.firstcapitalconnect.co.uk/about-us/major-programmes-and-developments/more-seats-for-you/the-future/</ref>


==Facilities==
==Facilities==

Revision as of 01:31, 30 March 2012

Biggleswade
General information
LocationCentral Bedfordshire
Managed byFirst Capital Connect
Platforms4
Other information
Station codeBIW

Biggleswade Railway Station serves the town of Biggleswade in Bedfordshire, England. The station is 41 miles (66 km) north of London Kings Cross on the East Coast Main Line. Biggleswade is managed and served by First Capital Connect.

Biggleswade station was originally built in 1850 for the Great Northern railway. This made Biggleswade the first town in Bedfordshire to have a mainline railway station.[citation needed] The original station consisted of two lines but was rebuilt in 1901 to allow the present 4 line arrangement to be built.

Biggleswade has two large platforms and 4 main rail lines, a pair of "up and down" slow lines used by stopping services and a pair of "up and down" fast lines used by high speed services passing through. A fifth line extends off the "up" slow line which links into the remaining sidings used by Plasmor.

The stations platforms are currently being lengthened so that they can cope with 12 car trains, which will serve the station following the completion of the Thameslink Programme.[1]

Facilities

Following a recent £60,000 refurbishment by First Capital Connect[2] the station now has two waiting rooms and two sets of toilets on Platforms 1/2, and also a small cafe at the bottom of the stairs. Platforms 3/4 currently only have a small shelter. The station has another small cafe in the old station buildings, as well as a ticket office.

There are two modern Touch Screen ticket machines located in front of the booking office, and both sheltered and secure cycle storage is provided next to the station buildings. There are currently 4 helpoints located at various points in the station, including one in the main car park.

Biggleswade station does not currently have automatic ticket gates, and is unlikely to do so in the future, as with the current footbridge it is not possible.

Services

Biggleswade station is served by a half-hourly service southbound to London Kings Cross and northbound to Peterborough. There is an hourly service in each direction on Sundays. There are also extra services during the peak that run fast to Biggleswade direct to/from Kings Cross.[3]

First Capital Connect Timetables for Biggleswade can be seen and downloaded here.

History

Biggleswade station was once a busy goods yard with several sidings used for loading trains of market produce to be taken to London markets. The decline of this led to a reduction in the use of the station, and it is now used solely for passenger traffic. Plasmor bricks own the site where the former goods depot was sited, and these lines into the sidings are still active with train workings of breeze block bricks brought down from Heck to Biggleswade, where they are then unloaded onto lorries for distribution. The goods depot was demolished but the old weighbridge & office remain on site, although out of use.

Biggleswade also had a signal box but this was closed when semophore signals were replaced. The station was also used as a red star parcel office but this was closed in the mid 1980s when parcel traffic was forced to use Stevenage station.

Ticket Office Opening Times & Station Staffing Hours

Below are the current opening and staffing times for Biggleswade, as of 2010.[4]

Ticket Office Hours
Day Opens Closes
Monday to Friday 06:20 14:15
Saturday 08:00 14:15
Sunday 08:15 14:15
Station Staffing Hours
Day From Until
Monday to Friday 06:05 14:35
Saturday 07:45 14:35
Sunday 08:00 14:35

Route

Preceding station National Rail National Rail Following station
First Capital Connect
Great Northern Peterborough Line

References

52°05′06″N 0°15′40″W / 52.085°N 0.261°W / 52.085; -0.261