Jump to content

Hope Downs mine: Difference between revisions

Coordinates: 23°08′42″S 119°34′19″E / 23.144968°S 119.572064°E / -23.144968; 119.572064
From Wikipedia, the free encyclopedia
Content deleted Content added
ce
Rescuing 9 sources and tagging 1 as dead. #IABot (v1.3beta4)
Line 25: Line 25:
}}
}}


The '''Hope Downs 4 mine''' is an [[iron ore]] mine located in the [[Pilbara]] region of [[Western Australia]], 100 kilometres northwest of [[Newman, Western Australia|Newman]].<ref>[http://minedexext.doir.wa.gov.au/minedex/external/common/appMain.jsp MINEDEX website: Hope Downs search result] accessed: 6 November 2010</ref>
The '''Hope Downs 4 mine''' is an [[iron ore]] mine located in the [[Pilbara]] region of [[Western Australia]], 100 kilometres northwest of [[Newman, Western Australia|Newman]].<ref>[http://minedexext.doir.wa.gov.au/minedex/external/common/appMain.jsp MINEDEX website: Hope Downs search result] {{webarchive|url=https://web.archive.org/web/20080911130252/http://minedexext.doir.wa.gov.au/minedex/external/common/appMain.jsp |date=2008-09-11 }} accessed: 6 November 2010</ref>


The mine is partly owned and operated by [[Rio Tinto Group|Rio Tinto Iron Ore]] and is one of twelve iron ore mines the company operates in the Pilbara.<ref name="Pilbara" >[http://www.riotintoironore.com/ENG/operations/301_pilbara.asp Pilbara] Rio Tinto Iron Ore website, accessed: 6 November 2010</ref><ref name="Mining" >[http://www.riotintoironore.com/ENG/operations/497_mining.asp Mining] Rio Tinto Iron Ore website, accessed: 6 November 2010</ref> In the calendar year 2009, the combined Pilbara operations produced 202 million tonnes of iron ore, a 15 percent increase from 2008.<ref>[http://www.riotintoironore.com/documents/AJM_23_Mar_2010_FINAL.pdf Preparing for the future] Rio Tinto presentation, published: 23 March 2010, accessed: 7 November 2010</ref> The Pilbara operations accounted for almost 13 percent of the world's 2009 iron ore production of 1.59 billion tonnes.<ref>[http://www.miningweekly.com/article/iron-ore-production-falls-62-in-2009---unctad-report-2010-07-30 Global iron-ore production falls 6,2% in 2009 - Unctad report] miningweekly.com, published: 30 July 2010, accessed: 7 November 2010</ref><ref>[http://www.unctad.org/templates/webflyer.asp?docid=13721&intItemID=1634&lang=1 Production of iron ore fell in 2009, but shipments continued to increase, report says] [[United Nations Conference on Trade and Development|UNCTAD]] website, published: 30 July 2010, accessed: 7 November 2010</ref>
The mine is partly owned and operated by [[Rio Tinto Group|Rio Tinto Iron Ore]] and is one of twelve iron ore mines the company operates in the Pilbara.<ref name="Pilbara">[http://www.riotintoironore.com/ENG/operations/301_pilbara.asp Pilbara] {{webarchive|url=https://web.archive.org/web/20131021131325/http://www.riotintoironore.com/ENG/operations/301_pilbara.asp |date=2013-10-21 }} Rio Tinto Iron Ore website, accessed: 6 November 2010</ref><ref name="Mining">[http://www.riotintoironore.com/ENG/operations/497_mining.asp Mining] {{webarchive|url=https://web.archive.org/web/20100612111105/http://www.riotintoironore.com/ENG/operations/497_mining.asp |date=2010-06-12 }} Rio Tinto Iron Ore website, accessed: 6 November 2010</ref> In the calendar year 2009, the combined Pilbara operations produced 202 million tonnes of iron ore, a 15 percent increase from 2008.<ref>[http://www.riotintoironore.com/documents/AJM_23_Mar_2010_FINAL.pdf Preparing for the future] {{webarchive|url=https://web.archive.org/web/20110715190134/http://www.riotintoironore.com/documents/AJM_23_Mar_2010_FINAL.pdf |date=2011-07-15 }} Rio Tinto presentation, published: 23 March 2010, accessed: 7 November 2010</ref> The Pilbara operations accounted for almost 13 percent of the world's 2009 iron ore production of 1.59 billion tonnes.<ref>[http://www.miningweekly.com/article/iron-ore-production-falls-62-in-2009---unctad-report-2010-07-30 Global iron-ore production falls 6,2% in 2009 - Unctad report] miningweekly.com, published: 30 July 2010, accessed: 7 November 2010</ref><ref>[http://www.unctad.org/templates/webflyer.asp?docid=13721&intItemID=1634&lang=1 Production of iron ore fell in 2009, but shipments continued to increase, report says]{{dead link|date=April 2017 |bot=InternetArchiveBot |fix-attempted=yes }} [[United Nations Conference on Trade and Development|UNCTAD]] website, published: 30 July 2010, accessed: 7 November 2010</ref>


The [[Hamersley Range]], where the mine is located, contains 80 percent of all identified iron ore reserves in [[Australia]] and is one of the world's major iron ore provinces.<ref>[http://www.australianminesatlas.gov.au/education/fact_sheets/iron.jsp Iron fact sheet - Australian Resources and Deposits] [[Geoscience Australia]] website, accessed: 7 November 2010</ref>
The [[Hamersley Range]], where the mine is located, contains 80 percent of all identified iron ore reserves in [[Australia]] and is one of the world's major iron ore provinces.<ref>[http://www.australianminesatlas.gov.au/education/fact_sheets/iron.jsp Iron fact sheet - Australian Resources and Deposits] {{webarchive|url=https://web.archive.org/web/20110218001043/http://www.australianminesatlas.gov.au/education/fact_sheets/iron.jsp |date=2011-02-18 }} [[Geoscience Australia]] website, accessed: 7 November 2010</ref>


The project leases are estimated to have 1,450 million tonnes of mineable ore and the mines to have an expected life of more than 30 years.<ref>{{cite web|url=http://www.hancockprospecting.com.au/hope.html|title=Hope Downs Iron Ore Project|work=Hancock Prospecting|accessdate=10 January 2010}}</ref>
The project leases are estimated to have 1,450 million tonnes of mineable ore and the mines to have an expected life of more than 30 years.<ref>{{cite web|url=http://www.hancockprospecting.com.au/hope.html|title=Hope Downs Iron Ore Project|work=Hancock Prospecting|accessdate=10 January 2010}}</ref>
Line 39: Line 39:
In the first half of 2009, Rio Tinto upgraded the mine from an annual production of 22 million tonnes to 30 million tonnes.<ref name="Digest" >[http://www.dmp.wa.gov.au/documents/Statsdigest09web.pdf Western Australian Mineral and Petroleum Statistic Digest 2008-09] [[Department of Mines and Petroleum]] website, accessed: 8 November 2010</ref>
In the first half of 2009, Rio Tinto upgraded the mine from an annual production of 22 million tonnes to 30 million tonnes.<ref name="Digest" >[http://www.dmp.wa.gov.au/documents/Statsdigest09web.pdf Western Australian Mineral and Petroleum Statistic Digest 2008-09] [[Department of Mines and Petroleum]] website, accessed: 8 November 2010</ref>


Ore from the mine is then transported to the coast through the [[Hamersley & Robe River railway]], where it is loaded onto ships.<ref name="Rail" >[http://www.riotintoironore.com/ENG/operations/497_rail.asp Rail] Rio Tinto Iron Ore website, accessed: 6 November 2010</ref> The 30 kilometre spur line connecting the mine with Rio Tinto's existing railway system was named "Lang Hancock Railway" in honor of [[Lang Hancock]], founder of Hancock Prospecting and discoverer of the iron ore deposit.<ref>[http://www.theage.com.au/news/business/hope-downs-deal-sees-wheel-turn-full-circle/2005/07/04/1120329382009.html Hope Downs deal sees wheel turn full circle] ''[[The Age]]'', published: 5 July 2005, accessed: 7 November 2010</ref>
Ore from the mine is then transported to the coast through the [[Hamersley & Robe River railway]], where it is loaded onto ships.<ref name="Rail">[http://www.riotintoironore.com/ENG/operations/497_rail.asp Rail] {{webarchive|url=https://web.archive.org/web/20130701061825/http://www.riotintoironore.com/ENG/operations/497_rail.asp |date=2013-07-01 }} Rio Tinto Iron Ore website, accessed: 6 November 2010</ref> The 30 kilometre spur line connecting the mine with Rio Tinto's existing railway system was named "Lang Hancock Railway" in honor of [[Lang Hancock]], founder of Hancock Prospecting and discoverer of the iron ore deposit.<ref>[http://www.theage.com.au/news/business/hope-downs-deal-sees-wheel-turn-full-circle/2005/07/04/1120329382009.html Hope Downs deal sees wheel turn full circle] ''[[The Age]]'', published: 5 July 2005, accessed: 7 November 2010</ref>


The mine's workforce is on a [[fly-in fly-out]] roster.<ref name="Mine" /> In the calendar year 2009, the mine employed 787 people, an increase in comparison to 2008, when it only employed 453.<ref name="Digest" />
The mine's workforce is on a [[fly-in fly-out]] roster.<ref name="Mine" /> In the calendar year 2009, the mine employed 787 people, an increase in comparison to 2008, when it only employed 453.<ref name="Digest" />
Line 49: Line 49:


==External links==
==External links==
* [http://www.riotintoironore.com/index.asp Rio Tinto Iron Ore website]
* [https://web.archive.org/web/20110406102819/http://www.riotintoironore.com/index.asp Rio Tinto Iron Ore website]
* [http://minedexext.doir.wa.gov.au/minedex/external/common/appMain.jsp MINEDEX website] Database of the [[Department of Mines and Petroleum]]
* [https://web.archive.org/web/20080911130252/http://minedexext.doir.wa.gov.au/minedex/external/common/appMain.jsp MINEDEX website] Database of the [[Department of Mines and Petroleum]]


{{Iron ore railways in the Pilbara}}
{{Iron ore railways in the Pilbara}}

Revision as of 22:08, 4 April 2017

Hope Downs 4 mine
Location
Hope Downs 4 mine is located in Australia
Hope Downs 4 mine
Hope Downs 4 mine
Location in Australia
LocationPilbara
StateWestern Australia
CountryAustralia
Coordinates23°08′42″S 119°34′19″E / 23.144968°S 119.572064°E / -23.144968; 119.572064
Production
ProductsIron ore
Production30 million tonnes/annum
History
Opened2007
Owner
CompanyRio Tinto Iron Ore (50%)
Hancock Prospecting (50%)
WebsiteRio Tinto Iron Ore website
Hancock Prospecting website

The Hope Downs 4 mine is an iron ore mine located in the Pilbara region of Western Australia, 100 kilometres northwest of Newman.[1]

The mine is partly owned and operated by Rio Tinto Iron Ore and is one of twelve iron ore mines the company operates in the Pilbara.[2][3] In the calendar year 2009, the combined Pilbara operations produced 202 million tonnes of iron ore, a 15 percent increase from 2008.[4] The Pilbara operations accounted for almost 13 percent of the world's 2009 iron ore production of 1.59 billion tonnes.[5][6]

The Hamersley Range, where the mine is located, contains 80 percent of all identified iron ore reserves in Australia and is one of the world's major iron ore provinces.[7]

The project leases are estimated to have 1,450 million tonnes of mineable ore and the mines to have an expected life of more than 30 years.[8]

Overview

Iron ore mines in the Pilbara region.

Rio Tinto iron ore operations in the Pilbara began in 1966.[2] Exploration work through Hancock Prospecting at the Hope Downs 4 deposit began in 1992. Hancock unsuccessfully tried to develop the project with a number of partners, briefly rumored to be planning to join up with the Fortescue Metals Group in 2005, who was then developing its Cloud Break mine in the region.[9] The development of the project suffered further delays when attempts to gain access to BHP Billiton's rail network failed, burdening the project with a further A$1 billion in cost to construct rail and port infrastructure.[10] Eventually, in July 2005, Rio Tinto became a partner in the project instead, making thereby the construction of major infrastructure unnecessary, and, after spending A$1.3 billion, the mine moved into production in November 2007.[11] The mine has an annual production capacity of 30 million tonnes of iron ore, sourced from open-pit operations. The ore is processed on site before being loaded onto rail.[12]

In the first half of 2009, Rio Tinto upgraded the mine from an annual production of 22 million tonnes to 30 million tonnes.[13]

Ore from the mine is then transported to the coast through the Hamersley & Robe River railway, where it is loaded onto ships.[14] The 30 kilometre spur line connecting the mine with Rio Tinto's existing railway system was named "Lang Hancock Railway" in honor of Lang Hancock, founder of Hancock Prospecting and discoverer of the iron ore deposit.[15]

The mine's workforce is on a fly-in fly-out roster.[12] In the calendar year 2009, the mine employed 787 people, an increase in comparison to 2008, when it only employed 453.[13]

Rio Tinto declared its intention to expand the mine, spending a further A$1.78 billion on the Hope Downs 4 project, scheduled to produce 15 million tonnes of iron ore annually by 2013.[16][17]

References

  1. ^ MINEDEX website: Hope Downs search result Archived 2008-09-11 at the Wayback Machine accessed: 6 November 2010
  2. ^ a b Pilbara Archived 2013-10-21 at the Wayback Machine Rio Tinto Iron Ore website, accessed: 6 November 2010
  3. ^ Mining Archived 2010-06-12 at the Wayback Machine Rio Tinto Iron Ore website, accessed: 6 November 2010
  4. ^ Preparing for the future Archived 2011-07-15 at the Wayback Machine Rio Tinto presentation, published: 23 March 2010, accessed: 7 November 2010
  5. ^ Global iron-ore production falls 6,2% in 2009 - Unctad report miningweekly.com, published: 30 July 2010, accessed: 7 November 2010
  6. ^ Production of iron ore fell in 2009, but shipments continued to increase, report says[permanent dead link] UNCTAD website, published: 30 July 2010, accessed: 7 November 2010
  7. ^ Iron fact sheet - Australian Resources and Deposits Archived 2011-02-18 at the Wayback Machine Geoscience Australia website, accessed: 7 November 2010
  8. ^ "Hope Downs Iron Ore Project". Hancock Prospecting. Retrieved 10 January 2010.
  9. ^ Hope Downs is still a one-mine track The Age, published: 13 April 2005, accessed: 7 November 2010
  10. ^ The Australian Mines Handbook - 2003-04 edition, editor: Ross Louthean, publisher: Louthean Media Pty Ltd, page: 240
  11. ^ Hope Downs JV Hancock Prospecting website, accessed: 7 November 2010
  12. ^ a b Hope Downs mine Rio Tinto Iron Ore website, accessed: 6 November 2010
  13. ^ a b Western Australian Mineral and Petroleum Statistic Digest 2008-09 Department of Mines and Petroleum website, accessed: 8 November 2010
  14. ^ Rail Archived 2013-07-01 at the Wayback Machine Rio Tinto Iron Ore website, accessed: 6 November 2010
  15. ^ Hope Downs deal sees wheel turn full circle The Age, published: 5 July 2005, accessed: 7 November 2010
  16. ^ Rio Tinto to invest $1.78b in Hope Downs The Sydney Morning Herald, published: 30 August 2010, accessed: 7 November 2010
  17. ^ Rio Tinto proceeds with Hope Downs iron project ABC Rural, published: 31 August 2010, accessed: 7 November 2010