Purple Line (Namma Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InfernalH (talk | contribs) at 12:13, 11 August 2015 (→‎History). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Purple Line
A Purple Line train
Overview
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
  • Whitefield
  • Kengeri
Stations6
17 (Phase I)
36 (Phase II)
Service
TypeMetro
SystemNamma Metro
Depot(s)Baiyappanahalli
History
Opened20th October 2011
Technical
Line length6.7 km
18.10 km (Phase I)
34.30 km (Phase II)
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed32 km/h (20 mph)
Route map

Whitefield (Kadugodi)
Parking Whitefield (Bangalore) railway station Bus interchange Kadugodi
Mainline rail interchange Kadugodi Depot
Hopefarm Channasandra Parking
Kadugodi Tree Park Parking
Pattandur Agrahara Parking
Sri Sathya Sai Hospital Parking
Nallurhalli
ParkingBus interchange Whitefield TTMC
Kundalahalli Parking
Seetharamapalya Parking
Hoodi Parking
Garudacharapalya Parking
Singayyanapalya Parking
Krishnarajapuram (KR Puram) Parking Krishnarajapuram railway station
Blue Line
Under Construction
Benniganahalli
Bus interchange Tin Factory
Baiyappanahalli
Parking Baiyappanahalli railway station
Swami Vivekananda Road
Parking
IndiranagarParking
Halasuru
Trinity
Mahatma Gandhi Road
Pink Line
Under Construction
Cubbon Park
Dr. B.R. Ambedkar Stn., Vidhana Soudha
Sir M. Visveswaraya Stn., Central College
Nadaprabhu Kempegowda Stn., Majestic Kempegowda Bus Station Bangalore City railway station
Krantivira Sangolli Rayanna Railway Station
Bangalore City railway station
Magadi Road
Parking
Sri Balagangadharanatha Swamiji Stn., HosahalliParking
Orange Line
Proposed
VijayanagarParking
Attiguppe
Parking Bus interchange Vijayanagara TTMC
Deepanjali Nagar
Mysuru Road Parking
Orange Line
Proposed
Pantharapalya–Nayandahalli Parking
Rajarajeshwari NagarParking
Jnanabharathi
Parking Mainline rail interchange Jnanabharathi Railway Station
Pattanagere
Kengeri Bus Terminal
Parking Bus interchange Kengeri TTMC
Kengeri Parking
Mainline rail interchange Challaghatta Depot (U/C)
Challaghatta

The Purple Line of the Namma Metro is part of the metro rail system for the city of Bangalore, India, some of which is currently being constructed. Once finished, it will consist of 36 stations from Whitefield to Kengeri. The line will measure 40.10 kilometres (24.92 mi) and will be mostly elevated, with some stations underground. Currently only a 6.7 km stretch between Baiyyappanahalli and M. G. Road is operational. The line will connect the eastern and western areas of Bangalore. The Phase I extension, from Mysore Road to Baiyappanahalli is expected to be over and commence operations by November 2015.

History

The following dates represent the dates the section opened to the public, not the private inauguration.

colspan="6" style="background:#Template:Namma Metro color;" | History
Name Extension date Termini Length Stations
Reach-1 20 October 2011 Baiyappanahalli M.G. Road 6.70 kilometers (4.16 mi) 6
Reach-2 September 2015[2] Magadi Road Mysore Road 6.52 kilometers (4.05 mi) 6
UG-1 Minsk Square Magadi Road 4.88 kilometers (3.03 mi) 4
Phase II Extensions Whitefield Baiyappanahalli 15.50 kilometers (9.63 mi) 14
Mysore Road Kengeri 4.88 kilometers (3.03 mi) 5
Total Whitefield Kengeri 40.10 kilometers (24.92 mi) 36

The detailed project report (DPR) for Phase I, comprising the Purple and Green Lines, of Namma Metro project was prepared by the Delhi Metro Rail Corporation (DMRC) and submitted to the BMRCL in May 2003. The final approval on a scheme that incorporated the expertise of DMRC and RITES Limited did not come until April 2006.[3] The DPR prepared by DMRC envisaged a 33 km (21 mi) elevated and underground rail network with 32 stations for Phase I of the project. The proposed gauge was standard gauge unlike the broad gauge on the Delhi Metro network. The rationale for the metro includes reduced journey times, cutting fuel use, accident reduction and lower pollution.[citation needed]

Construction work for Phase I of the Namma Metro project was scheduled to start in 2005 but was delayed by a February 2006 change of government in Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. Finally, on 25 April 2006 the Indian Cabinet approved the project, which was then budgeted at more than 54 billion (US$650 million).[4] The cost escalated to 116.09 billion (US$1.4 billion) as various problems delayed the completion.[5] BMRCL received 7 billion (US$84 million) from Housing and Urban Development Corporation (HUDCO), 250 million (US$3.0 million) from the Asian Development Bank (ADB), 23% from the Central Government, 33% from the State Government and the rest as a 49.05 billion (US$590 million) loan from the Japan International Cooperation Agency (JICA).[6][7] Navayuga Engineering was awarded the contract to construct Reach 1 of the Purple Line in 2006.[8] The foundation stone for the Phase I construction was laid by Prime Minister Manmohan Singh on 24 June 2006,[9] and civil construction on Reach I of the line, between M.G. Road and Baiyyappanahalli, commenced on 15 April 2007.[10] The underground work commenced in May 2011. Each corridor consists of two tunnels which are the first underground tunnels built for trains in South India. The tunnels, dug using tunnel boring machines (TBM), are located approximately 60 feet below ground level, have a diameter of 5.5metres and are 5metres apart. Four TBMs, nicknamed Helen (TBM 1), Margarita (TBM 2), Kaveri (TBM 3) and Krishna, were used for tunnelling work on the Purple Line.[11][12][13][14][15] [16]

Reach 1 was originally scheduled to begin operations in March 2010.[17] Reach 2, the remaining elevated section of Purple Line was scheduled to be completed by December 2012.[18] After the deadline was missed, the Bangalore Metro Rail Corporation Ltd (BMRCL) shifted the deadline to 31 December 2010. It was again changed to 4 April 2011 and then the date of inauguration was set at 15 September 2011. The next deadline set was 26 September 2011 which was also missed. The metro was finally opened to the public on 20 October 2011 at 4 pm IST by Union Urban Development Minister Kamal Nath.[17] There was an overwhelming response to the metro at the commencement of operations. As per BMRCL sources within first 3 days of operations 169,019 people used this mass transit system.[19] At the end of 4th day about 200,000 passengers had already commuted in Namma Metro. Namma Metro's first 12-day cumulative revenue was 10 million (US$120,000).[20] During the first month, since the opening of Reach I, about 1,325,000 people travelled by the metro.[21] On average, 41,390 people took the train every day, while the average daily revenue was 667,262. The BMRC earned a revenue of 21 million (US$250,000) in its first month of operation.[22] In the first six months of operation, average ridership went down to 24,968. The BMRC earned a total of 66 million (US$790,000) during the same period.[23] Namma Metro posted a profit of 4.1 million (US$49,000) after almost one year of operating Reach I. BMRCL estimates that nearly 8 million passengers travelled on the system, in its first year of operations.[24]

Stations

Initially, there were no toilets at Namma Metro stations, despite demand from commuters. BMRCL countered the demand by arguing that constructing toilets was not part of the metro construction plan, and that building toilets in the city was the responsibility of the Bruhat Bengaluru Mahanagara Palike (BBMP). They also justified the decision by saying that commuters spent "hardly five minutes" at stations, so restrooms were not required, and also that none of the Bangalore Metropolitan Transport Corporation (BMTC) bus stops in the city had toilets for passengers. However, BMRCL eventually heeded public demand, and the metro's first toilets were opened at Baiyappanahalli and Indiranagar stations on 21 June 2013.[25]

Yellow tactile tiles are used at all stations to guide the visually impaired. The tiles start at the ramp and lead to the staircases and lifts.[26]

align="center" colspan="5" style="background:#Template:Namma Metro color;"| Purple Line
# Station Name Opening Connections Layout
1 Whitefield None
2 Ujwala Vidyalaya None
3 Kadugodi None
4 ITPL None
5 Satyasai Medical Institute None
6 Vaidehi Hospital None
7 Kundalahalli None
8 Visvesvaraya Industrial Estate None
9 Doddanakundi None
10 Garudacharpalya None
11 Mahadevapura None
12 Narayanapura None
13 KR Puram None
14 Jyothipuram None
15 Baiyappanahalli 20 October 2011 None Elevated
16 Swami Vivekananda Road 20 October 2011 None Elevated
17 Indiranagar 20 October 2011 None Elevated
18 Halasuru 20 October 2011 None Elevated
19 Trinity 20 October 2011 None Elevated
20 Mahatma Gandhi Road 20 October 2011 Gottigere - Nagavara line Elevated
21 Cubbon Park None Elevated
22 Vidhana Soudha None Underground
23 Sir M. Visveshwaraya None Underground
24 Kempegowda   Green Line At Grade
25 City Railway Station None Underground
26 Magadi Road None Elevated
27 Hosahalli None Elevated
28 Vijayanagar None Elevated
29 Attiguppe None Elevated
30 Deepanjalinagar None Elevated
31 Mysore Road None Elevated
32 Nayandahalli None
33 Rajarajeshwari Nagar None
34 Bangalore University None
35 R.V. College of Engineering None
36 Kengeri None
Interior of the Metro coach
Interior of the Metro coach on inauguration day
MG Road Station at night

Parking

Currently parking facilities are available only in Baiyappanahalli and Swami Vivekananda Road stations. BMRCL awarded the contract to Central Parking Services (CPS) for an annual license fee of 2.5 million (US$30,000).[27]

Vehicle Fee
First 4 hours Every subsequent hour Whole Day
Car 5 (6.0¢ US) 2 (2.4¢ US) 10 (12¢ US)
Motorcycle 2 (2.4¢ US) 1 (1.2¢ US) 5 (6.0¢ US)
Bicycle Free
Day timing: 5am – 11pm

Parking fees can be paid in cash or using flash cards. People who pay using flash cards receive a 20% discount. Electric and hybrid cars get to park for free at Namma Metro stations.[28] An average of 4,764 cars and 5,721 two-wheelers use parking facilities at Baiyappanahalli and SV Road stations daily.[24]

Route description

The alignment starts near Ring road junction on Mysore road with Mysore Road Terminal station on the North side of the road. The centre line of the station is taken as Zero. The facility beyond the station is provided on elevated section, which will also be used, for future extension to further west. From this station the alignment runs eastward along Mysore Road up to the 'T' junction with Chord Road. At this junction the alignment turns to Chord Road with a left-hand curve. The Deepanjali Nagar station (Km.1.117) is located just after this curve. After the station the alignment crosses the Bangalore - Mysore railway line over the existing ROB. Thereafter the alignment runs all along this road up to the crossing of Chord road with Magadi Road at Tollgate junction. Deepanjali nagar station and three more stations namely Vijay Nagar (km 2.345), Hoshalli (km 3.444) and Tollgate (km 4.445) are located on this road.[29]

From Tollgate junction, alignment turns into Magadi Road. The Magadi road station is located at km 5.600 on this stretch. The alignment is taken off the road near BWSSB tanks (km 6.300) to provide the switchover ramp in the Leprosy hospital area. The alignment is fully underground by the time it reaches the Junction of Magadi road with Tank Bund road. The alignment continues as underground below the Subhash Nagar colony, Railway quarters. The Bangalore city metro station is provided west of the Bangalore City railway station at km 6.755. The alignment passes below the Bangalore city railway station yard and reaches KSRTC bus stand where a combined station on both E - W and N- S corridors is provided. This station is named Majestic (Km.7.503) for both the corridors. From Majestic Bus stand the alignment goes under the K G Road till Mysore Bank crossing, after that it turns to left on to the Post Office road. The Central College Station (km 8.697) is located just after the curve below the road. It goes further after crossing K R Circle on the Ambedker Road. The Vidhan Soudha under-ground station (km 9.318) is located on this road. After this station the alignment turns into the Cubbon Park with a right hand curve, still underground. [29]

The alignment is fully elevated before reaching Queen's circle. From Queen’s Circle, the alignment runs on the left edge of the M G Road adjacent to the elevated walkway and continues till Brigade road. The M G Road station (km 11.380) is provided opposite Plaza cinema. After Brigade road the alignment continues till Trinity Circle. The Trinity circle station (elevated) is provided at km 12.522. From Trinity circle the alignment moves on the Swami Vivekanand Road. Ulsoor station is located at km 13.725 on this road. From Swamy Vivekanand road the alignment turns into CMH road with a sharp right hand curve of 120 m radius. On C M H Road it runs on the middle of the road till B M Circle where it turns left. CMH road station is provided at km 14.610. Another station Indira Nagar is proposed at km 15.537 on 100ft. road. From 100 ft road the alignment turns right on to Old Madras road where it crosses the BEML railway siding. Old Madras road station is proposed at km 16.419 . The Baiyappanahalli metro station is at km 17.374 on the surface. The terminal station is located adjacent to Indian railway's Baiyappanahalli station so as to have convenient passenger integration facilities. [29]

Baiyappanahalli depot

As the Purple and Green Lines are interlinked, rakes can move from one corridor to another for Intermediate Overhaul (IOH) and Periodical Overhaul (POH). This facilitated the construction of one mother workshop for the two corridors at Baiyappanahalli. An inspection shed, which has the stabling facilities at Baiyappanahalli and one inspection shed having stabling facilities at Yeshwantapur on the Green Line were constructed.[30]


On the available land, sixteen 6-car length-stabling lines were possible at Baiyappanahalli depot. Three rakes are housed in the inspection shed. The length of 6 car train is approx 128.3 m. Stabling lines are designed for 155m lengths to cater for provision of the friction buffer stops and the signaling interlocking needs. A test track of 948 m length has been provided for testing of 6-car train upto a speed of 80kmph. [30]

References

  1. ^ http://www.thehindu.com/news/cities/bangalore/byappanahallimg-road-metro-stretch-more-popular/article5876934.ece
  2. ^ http://articles.economictimes.indiatimes.com/2015-08-03/news/65165666_1_bangalore-metro-rail-corporation-trial-run-metro-corridor
  3. ^ http://bmrc.co.in/pdf/phase2/phase2forweb.pdf
  4. ^ "Cabinet approves Bangalore metro". Online Edition of The Economic Times. 28 April 2006.
  5. ^ "It's official: Namma Metro Phase-1 not before 2014". Deccan Chronicle. 21 December 2011. Retrieved 3 January 2012.
  6. ^ "Namma Metro Phase II requires Rs. 25,000 crore – southindia – Hyderabad – ibnlive". Ibnlive.in.com. Retrieved 21 October 2011.
  7. ^ "Metro rail projects: Four new metromen and their challenges – Economic Times". The Economic Times. 18 December 2011. Retrieved 3 January 2012.
  8. ^ "Award of contract" (PDF). Official webpage of B.M.R.C. Retrieved 2 October 2011.[dead link]
  9. ^ "PM lays foundation stone for Metro project". PM office website.
  10. ^ "Bangalore Metro Rail Work to begin on Feb 3, 2007". The Times of India. 21 January 2007. Retrieved 16 October 2007.
  11. ^ Rohith B R, Bangalore, 14 Oct 2012, DHNS: (14 October 2012). "Automation helps precise work on metro tunnels". Deccan Herald. Retrieved 4 March 2013.{{cite web}}: CS1 maint: extra punctuation (link) CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  12. ^ RohithB R, Bangalore, 13 Oct 2012, DHNS : (13 October 2012). "Metro makes steady inroads". Deccan Herald. Retrieved 4 March 2013.{{cite web}}: CS1 maint: extra punctuation (link) CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  13. ^ Special Correspondent (28 September 2012). "A smoother passage for Margarita". The Hindu. Chennai, India. Retrieved 4 March 2013. {{cite news}}: |author= has generic name (help)
  14. ^ Bangalore, 23 Sep 2012, DHNS : (23 September 2012). "Tunnelling along north-south corridor to begin soon". Deccan Herald. Retrieved 4 March 2013.{{cite web}}: CS1 maint: extra punctuation (link) CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  15. ^ Update : 06:47 pm IST (18 December 2012). "Metro rushes to meet deadline". Deccan Chronicle. Retrieved 4 March 2013.{{cite web}}: CS1 maint: numeric names: authors list (link)
  16. ^ Bangalore, 21 Feb 2013, DHNS (21 February 2013). "After Helen, Margarita, it's Krishna and Kaveri". Deccan Herald. Retrieved 4 March 2013.{{cite web}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  17. ^ a b "Metro comes to Bangalore finally". The Times of India. 20 October 2011.
  18. ^ "metro-phase-i-to-be-fully-ready-by-march-2015" (Press release). The Hindu. 29 August 2011. Retrieved 19 October 2013.
  19. ^ "Revenue Services Report" (PDF).
  20. ^ Madhumathi D.S. "Business Line : Industry & Economy / Logistics : Namma Metro rides on 'gawk' power". Business Line. Retrieved 3 January 2012.
  21. ^ "13.25 lakh rode the Metro – The Times of India". The Times of India. 25 November 2011.
  22. ^ "Namma Metro gains momentum – southindia – Bangalore – ibnlive". Ibnlive.in.com. Retrieved 3 January 2012.
  23. ^ "Joyrides in Bangalore Metro are over – Bangalore – DNA". Daily News and Analysis. Retrieved 25 July 2012.
  24. ^ a b "Bangalore Metro posts Rs 41 lakh profit in first year – Bangalore – DNA". Daily News and Analysis. 18 October 2012. Retrieved 18 October 2012.
  25. ^ "At Metro, wanna pee? Pay Rs 3 - Bangalore - DNA". Dnaindia.com. Retrieved 28 September 2013.
  26. ^ G. Ananthakrishnan (14 January 2013). "Linking modes of commute". The Hindu. Chennai, India. Retrieved 4 March 2013.
  27. ^ "Park car, pay more at metro". The Hindu. Chennai, India. 30 March 2012.
  28. ^ Parking at Metro gets a bit cheaper – Bangalore – DNA
  29. ^ a b c Delhi Metro Rail Corporation Ltd, assisted by RITES Ltd (May 2003). "Chapter 4: Geometric Design Norms and Description of Alignment - Detailed Project Report (Final), Bangalore Metro (Phase I)". esgindia.org. Retrieved 3 June 2015. Public Domain This article incorporates text from this source, which is in the public domain.
  30. ^ a b Delhi Metro Rail Corporation Ltd, assisted by RITES Ltd (May 2003). "Chapter 11: Maintenance Depots - Detailed Project Report (Final), Bangalore Metro (Phase I)". esgindia.org. Retrieved 30 May 2015. Public Domain This article incorporates text from this source, which is in the public domain.

Template:Namma Metro navbox