Jump to content

Line 5 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 152.32.243.115 (talk) at 14:42, 26 January 2021 (→‎Phase I). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 5
5
The EXPO Garden Center Station platform
Overview
Native name重庆轨道交通5号线
StatusOperational
Line number5
LocaleChongqing, China
Termini
Stations10
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017; 6 years ago (2017-12-28)
Technical
Line length16.42 km (10.20 mi)[1] (North section)
18.34 km (11.40 mi)[2] (South section)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Yuegangbeilu
Shizishan depot
Yuegang Avenue
Chunxuan Avenue
Central Park West
Lujiagou
Ganyue Avenue
Yuhegou
The EXPO Garden Center
3
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
Dalongshan
Dashiba
Zhongshutuo
Hongyancun
Xietaizi
Shiqiaopu
Shixinlu
Bashan
Fengxilu
Chongqing W
Railway Station
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Jin'aoshan
Huayan Center
Zhongliangshan depot
Jiangtiao line
Tiaodeng
Shilinsi
DC 1.5 kV
AC 25 kV
Jiulongyuan
Shuangfu
Xiangtang
Shuangfu Depot
Jiangjin High-speed Railway
Shengquansi
Jijiang
Dingshan
=
Virtual interchange: transport
card only, re-entry required.

Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.[3]

History

The line began construction on December 3, 2013.[4]

Opening timeline

Segment Commencement Length Station(s) Name
The EXPO Garden Center – Dalongshan 28 December 2017 16.42 km (10.20 mi)[1] 9 Phase 1 (North Section)
Dalongshan – Dashiba 24 December 2018 1
Shiqiaopu – Tiaodeng 20 January 2021 18.34 km (11.40 mi)[2] 12 Phase 1 (South Section)

Stations

Phase I

Station
Station name Connections Distance
km
Location
English Chinese
5/01 Template:CRT stations 园博中心 3[a] 0.00 Yubei
5/02 Template:CRT stations 丹鹤 1.35 1.35
5/03 Template:CRT stations 湖霞街 1.46 2.81
5/04 Template:CRT stations 重光 1.67 4.48
5/05 Template:CRT stations 和睦路 2.25 6.73
5/06 Template:CRT stations 人和 1.39 8.12
5/07 Template:CRT stations 幸福广场 1.96 10.08
5/08 Template:CRT stations 冉家坝 6 Loop 2.50 12.58
5/09 Template:CRT stations 大龙山 6 1.01 13.59
5/10 Template:CRT stations 大石坝 2.51 16.1 Jiangbei
5/11 Template:CRT stations 忠恕沱
5/12 Template:CRT stations 红岩村 9 Yuzhong
5/13 Template:CRT stations 歇台子 1 Jiulongpo
5/14 Template:CRT stations 石桥铺 1
5/15 Template:CRT stations 石新路
5/16 Template:CRT stations 巴山
5/17 Template:CRT stations 凤西路 Shapingba
5/18 Chongqing West 重庆西站 Loop
5/19 Template:CRT stations 华岩寺 Jiulongpo
5/20 Template:CRT stations 华成路
5/21 Template:CRT stations 半山
5/22 Template:CRT stations 中梁山
5/23 Template:CRT stations 金建路
5/24 Template:CRT stations 华岩中心 Dadukou
5/25 Template:CRT stations 跳磴 18

Jiangtiao line

Jiangtiao line (江跳线)[5] or Jiangtiao section (江跳段) is an extension of Line 5. The section from Tiaodeng to Shengquansi (28.22 km) will open in 2022.[6] The section from Shengquansi to Dingshan is under planning.

Station
Station name Connections Distance
km
Location
English Chinese
5/25 Template:CRT stations 跳磴 18
5/26 Template:CRT stations 石林寺
5/27 Template:CRT stations 九龙园
5/28 Template:CRT stations 双福
5/29 Template:CRT stations 享堂
5/30 Jiangjinbei Railway Station 江津北站 Jiangjinbei Railway Station Jiangjinbei Railway Station
5/31 Template:CRT stations 圣泉寺
5/32 Template:CRT stations 几江
5/33 Template:CRT stations 鼎山

Phase II

  • Under construction
Station
Station name Connections Distance
km
Location
English Chinese
Template:CRT stations 悦港北路 Yubei
Template:CRT stations 悦港大道
Template:CRT stations 椿萱大道
Template:CRT stations 中央公园西 10
Template:CRT stations 鲁家沟
Template:CRT stations 甘悦大道
Template:CRT stations 玉河沟

Notes

  1. ^ Out of system transfer via The EXPO Garden

References

  1. ^ a b "轨道5号线大石坝站投用". December 24, 2018.
  2. ^ a b "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". August 21, 2020. Archived from the original on August 30, 2020.
  3. ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.
  4. ^ "招标公告 - 重庆城市交通开发投资(集团)有限公司". www.cqjtkt.cn. Retrieved January 20, 2021.
  5. ^ "重庆轨道交通延长线江跳线开建 将采用新型快速车辆". October 27, 2020.
  6. ^ "江跳段力争2022年春节前建成通车". December 18, 2020.