Line 6 (Mumbai Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Someshkt8 (talk | contribs) at 05:55, 18 March 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Mumbai Metro Line 6 (Pink Line)
Overview
StatusLine 6 (under construction)
OwnerMMRDA
Line number6
LocaleWestern Suburbs, Mumbai
Termini
  • Lokhandwala
  • Kanjurmarg
Stations13
WebsiteLine 6
Service
TypeRapid Transit
SystemMumbai Metro
History
Commenced2017; 7 years ago (2017)
Planned opening2022; 2 years ago (2022)
Technical
Line length14.47 km (8.99 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

Line 6 of the Mumbai Metro, or the Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Line, is part of the metro system for the city of Mumbai, India. This line is fully elevated.

Plans

The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor is to have 13 stations and cost Rs. 6,672 crore. It is to be an elevated corridor.

It is to connect Swami Samarth Nagar-Lokhandwala in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs. The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, Jogeshwari-Vikhorli Link Road, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W) and Vikhroli - Eastern Express Highway. Metro 6 is to provide interchange with Metro 2 at Adarsh Nagar, with Metro 3 at SEEPZ, with Metro 4 at Kanjurmarg (West), with Metro 7 at Jogeshwari Vikhroli Link Road and the Mumbai Suburban Railway at Jogeshwari on Western Railways and Kanjurmarg on Central Railway. Construction is to begin by December 2018.[1] [2] It is to be ready by 2021–22.[3]

History

The line was approved by Chief Minister Fadnavis on 19 October 2016. The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities were to determine the location of trees along the alignment with an accuracy of up to 10 cm, utilizing a differential GPS (DGPS), while a digital aerial triangulation system is to help determine the types of trees, their heights and diameters.[4]

Current status

Sr. No. Name of Work Description Status for year 2019-20[5]
21 May 2019 Date Not Given July 2019 Date Not Given Sep 2019 Date Not Given Oct 2019 Date Not Given Nov 2019 Dec 2019 Jan 2020
1 Soil Investigation Works soil investigation work for pier foundation completed 39.4% 45.1% 58% 70.66% 73.84% 80.79% 82.18% 83.28%
2 Utility Works Works completed 25.2% 30.0% 36.6% 49.53% 53.01% 56.17% 56.45% 57.90%
3 Piling Works piling work for foundations completed 7.8%% 9.9% 14.10% 18.32% 23.64% 30.25% 33.37% 38.42%
4 Pile Cap Works Pile Cap work completed 0.5% 0.9% 2.05% 4.16% 6.71% 11.63% 14.75% 20.55%
5 Pier Works Pier work completed 0.52 2.14% 3.35% 5.67% 7.03% 11.60%
6 Station Work Work is in progress at all the 13 stations Swami Samarth Nagar, Adarsh Nagar,Jogeshwari (West), Jogeshwari-Vikhroli Link Road, Shyam Nagar,Mahakali Caves, SEEPZ Village, Saki Vihar Road, Rambaug, Powai Lake, IIT Powai, Kanjurmarg (West), Vikhroli (EEH)

Stations

The line will consist of 13 stations starting from Swami Samarth Nagar in Lokhandwala Complex, Andheri (West) to Vikhroli (East). It will have interchanges with Lines 2, 7, 3 and 4.[6]

# Station Interstation Distance Grade Connections
1 Swami Samarth Nagar 0 km (0 mi) Elevated None
2 Adarsh Nagar 0.7288 km (0.4529 mi) Elevated Line 2 (Planned)
3 Jogeshwari (West) 0.9891 km (0.6146 mi) Elevated Jogeshwari railway station

Western Line (Mumbai Suburban Railway)

4 Jogeshwari-Vikhroli Link Road 1.598 km (0.993 mi) Elevated Line 7 (Planned)
5 Shyam Nagar 0.9619 km (0.5977 mi) Elevated None
6 Mahakali Caves 1.5478 km (0.9618 mi) Elevated None
7 SEEPZ Village 1.1228 km (0.6977 mi) Elevated Line 3 (Planned)
8 Saki Vihar Road 1.1363 km (0.7061 mi) Elevated None
9 Rambaug 1.0122 km (0.6290 mi) Elevated None
10 Powai Lake 0.8493 km (0.5277 mi) Elevated None
11 IIT Powai 1.0644 km (0.6614 mi) Elevated None
12 Kanjurmarg (West) 1.658 km (1.030 mi) Elevated Line 4 (Under Construction)

Kanjurmarg railway station Central Line (Mumbai Suburban Railway)

13 Vikhroli (EEH) 1.056 km (0.656 mi) Elevated None

References

  1. ^ "Work on Mumbai's Metro-6 corridor to kick off by December". hindustantimes.com. Retrieved 13 August 2018.
  2. ^ "Mumbai: MMRDA plans to begin work on five more Metro lines by December". The Indian Express. 7 April 2017. Retrieved 7 April 2017.
  3. ^ "Mumbai's east-west connectivity to get a boost with another Metro corridor". hindustantimes.com. 2 March 2017. Retrieved 2 March 2017.
  4. ^ "MMRDA to begin tree count for Metro 6". mid-day. Retrieved 6 April 2017.
  5. ^ https://mmrda.maharashtra.gov.in/its#
  6. ^ "DPR for Line 6". MMRDA.