Line 18 (Chongqing Rail Transit)
Appearance
This article relies largely or entirely on a single source. (March 2019) |
Line 18 | |
---|---|
Overview | |
Native name | 重庆轨道交通18号线 |
Status | Under construction |
Line number | 18 |
Locale | Chongqing, China |
Termini | |
Stations | 19 |
Service | |
Type | Rapid transit |
System | Chongqing Rail Transit |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
History | |
Planned opening | 2023 |
Technical | |
Line length | 29.45 km (18.30 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | 1500 V DC Overhead line |
Line 18 (formerly known as Line 5A) of CRT is a rapid transit line in Chongqing, China, which is expected to be opened in around 2023.[1]
Planned Stations
Phase I
Station No. |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English (probable) | Chinese | ||||||||
Template:CRT stations | 富华路 | 9 | Yuzhong | ||||||
Template:CRT stations | 歇台子 | 1 5 | Jiulongpo | ||||||
Template:CRT stations | 奥体中心 | Loop | |||||||
Template:CRT stations | 石坪桥 | ||||||||
Template:CRT stations | 杨家坪 | 2 | |||||||
Template:CRT stations | 滩子口 | ||||||||
Template:CRT stations | 重庆南站 | ||||||||
Template:CRT stations | 黄桷坪 | ||||||||
Template:CRT stations | 五龙庙 | ||||||||
Template:CRT stations | 桥南村 | Ba'nan | |||||||
Template:CRT stations | 外河坪 | ||||||||
Template:CRT stations | 袁家湾 | ||||||||
Template:CRT stations | 简家槽 | ||||||||
Template:CRT stations | 茄子溪 | Dadukou | |||||||
Template:CRT stations | 白居寺 | 2 | |||||||
Template:CRT stations | 伏牛溪 | ||||||||
Template:CRT stations | 金鳌山 | ||||||||
Template:CRT stations | 跳磴 | 5 S5 | |||||||
Template:CRT stations | 跳磴南 | ||||||||
Phase II
- Currently under planning
Station No. |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
Template:CRT stations | 小什字 | 1 6 | Yuzhong | ||||||
Template:CRT stations | 凯旋路 | ||||||||
Template:CRT stations | 十八梯 | ||||||||
Template:CRT stations | 七星岗 | 1 10 | |||||||
Template:CRT stations | 重庆站 | ||||||||
Template:CRT stations | 黄沙溪 | ||||||||
Template:CRT stations | 菜袁路 | ||||||||
Template:CRT stations | 马家堡 | ||||||||
References
- ^ "轨道交通5A线、4号线二期、5号线北延伸段 3条轨道交通线路开工 总投资515亿元". January 25, 2019.