Jump to content

Line 2 (Changchun Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:46, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 2
 2 
Dongfang Square Station
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
Stations18
Service
TypeRapid transit
SystemChangchun Subway
Services1
Operator(s)Changchun Rail Transit Corporation
History
Opened30 August 2018; 6 years ago (2018-08-30)
Technical
Line length20.5 km (12.74 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 2 of the Changchun Subway (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun. It started operation on 30 August 2018. This line is 20.5 km long with 18 stations.[1]

Opening timeline

Segment Commencement Length Station(s) Name
Shuangfeng — Dongfang Square 30 August 2018 20.5 km (12.74 mi)[1] 18 Phase 1

Service routes

Stations

Station name Connections Distance
km
Location
English Chinese
Template:CCS stations 汽车公园 Luyuan
Template:CCS stations 捷达大路
Template:CCS stations 西湖 0.00 0.00
Template:CCS stations 双丰 2.18 2.18
Template:CCS stations 长春西站  CJ ~ JH  Trams in Changchun Trams 55 Changchun West railway station CRT 1.52 3.70
Template:CCS stations 兴隆堡 2.09 5.79
Template:CCS stations 西环城路 1.41 7.20
Template:CCS stations 和平大街 1.14 8.34
Template:CCS stations 万福街 Trams in Changchun Trams 54 0.82 9.16
Template:CCS stations 景阳广场 0.86 10.02
Template:CCS stations 解放桥  3 [a] 1.07 11.09 Luyuan / Chaoyang
Template:CCS stations 建设广场 0.80 11.89 Chaoyang
Template:CCS stations 文化广场 0.75 12.64
Template:CCS stations 解放大路  1  1.36 14.00 Chaoyang / Nanguan
Template:CCS stations 平阳街 0.78 14.78 Nanguan
Template:CCS stations 南关 1.12 15.90
Template:CCS stations 吉林大路  4  1.31 17.21 Erdao
Template:CCS stations 东盛大街 0.99 18.20
Template:CCS stations 东环城路 1.46 19.66
Template:CCS stations 长青 1.27 20.93 Erdao / Nanguan
Template:CCS stations 东方广场 1.38 22.31 Erdao
  1. ^ Out-of-system transfer before May 30, 2020.

Future Development

Western extension

A western extension to Qiche Park is under construction. The extension is 4.362 km in length.[2] It is scheduled to open in September 2021.[3]

Eastern extension

An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4]

References

  1. ^ a b c "长春地铁进入换乘时代 2号线8月30日通车". 2018-08-30.
  2. ^ "轻轨到地铁 看长春轨道交通发展". 2019-06-30.
  3. ^ "地铁2号线向西延伸两站预计2021年实现试运营". 2018-03-31.
  4. ^ "长春地铁2号线东延工程项目正式开工". 2019-11-27.