Jump to content

Bãi Cháy Bridge

Coordinates: 20°57′37″N 107°03′57″E / 20.96028°N 107.06583°E / 20.96028; 107.06583
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by JJMC89 bot III (talk | contribs) at 00:08, 27 June 2020 (Moving Category:Shimizu to Category:Shimizu Corporation per Wikipedia:Categories for discussion/Speedy). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bai Chay Bridge

Cầu Bãi Cháy
Bai Chay Bridge's main span
Coordinates20°57′37″N 107°03′57″E / 20.9603°N 107.0658°E / 20.9603; 107.0658
Carries4 lanes (cable-stayed section) and 6 lanes (other sections), 2 lanes each way and 2 pedestrian lanes
CrossesHạ Long Bay
LocaleQuảng Ninh Province, Vietnam
Maintained byMinistry of Transport of Vietnam
Characteristics
DesignCable-stayed bridge
Total length1,106 meters (3,629 ft)
Width25 meters (82 ft)
Height150 meters (490 ft)
Longest span435 meters (1,427 ft)
Clearance below50 meters (160 ft)
History
Constructed byShimizu
Sumitomo Mitsui Construction
Construction startMay 18, 2003
OpenedDecember 2, 2006
Location
Map

The Bãi Cháy Bridge (Vietnamese: Cầu Bãi Cháy) is a cable-stayed bridge on Highway 18, connecting Hồng Gai with Bãi Cháy over the Cửa Lục Straits, separating Cửa Lục Bay with Hạ Long Bay, the territory of Quảng Ninh Province, Vietnam. Bãi Cháy Bridge was the first central-line cable-stayed bridge in Vietnam. At the time of its inauguration, it set a record as the longest central-line span of cable-stayed bridge.

Design

The bridge has two outer span of reinforced pre-stressed concrete box beams which are the widest of the world for this type of bridge. The towers are located on a huge pneumatic caisson foundation system, a modern construction technology first applied in Vietnam on this project. The bridge was constructed using a balanced cantilever technology, wherein the bridge beams reaching out over the water and the aligned ends connect at a head height of 50 metres (160 ft) above the water level. This technique assured that vessels could still operate normally during the construction process.

The work was completed and opened to traffic on December 2, 2006. Bãi Cháy Bridge was built to address the needs of the people of Quảng Ninh, tourists inside and outside Vietnam, and also to end decades of operation of the Bãi Cháy ferry.

Technical details

  • Spans: 5 spans, main span of 435 meters (1,427 ft)
  • Navigable width: 150 meters (490 ft)
  • Load: Class A standard Japanese
  • Cost: about VND 1046 billions, 40-month construction period, to November 30, 2006 termination
  • Owner: Ministry of Transport, representing the owner: Project Management Unit 18-PMU18
  • Design consultant - Monitor: Institute of bridges and structures in Japan
  • Construction Contractor: Shimizu-Sumitomo Mitsui Construction

See also

References

20°57′37″N 107°03′57″E / 20.96028°N 107.06583°E / 20.96028; 107.06583