Jump to content

Line 3 (Dalian Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Frietjes (talk | contribs) at 20:13, 24 July 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 3
 3 
Dalian Station
Overview
Other name(s)R3
Dalian–Jinzhou intercity railway (Chinese: 大连金州城际轨道交通; pinyin: Dàlián Jīnzhōu Chéngjì Guǐdào Jiāotōng)
StatusOperational
OwnerDalian
LocaleDalian, Liaoning, China
Termini
Stations18
Service
TypeRapid transit
SystemDalian Metro
Services2
Operator(s)Dalian Metro Group Co., Ltd.
History
Opened8 November 2002; 21 years ago (2002-11-08)
Technical
Line length63.45 km (39.43 mi)[1]
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 of the Dalian Metro (R3; Chinese: 大连地铁3号线; pinyin: Dàlián Dìtiě Sān Hào Xiàn) is a rapid transit line running from southwest to northwest Dalian. It was opened on the 8 November 2002. This line is 63.45 km (39.43 mi)[1] long with 12 stations.

Line 3 is almost completely at grade or above ground; 13.89 kilometres (8.63 mi) is elevated, 1.123 kilometres (0.698 mi) is underground and 31.39 kilometres (19.50 mi) is at grade. Six stations are elevated, and the remainder are at grade. Transfers to trams and trains are possible at the Dalian Railway Station.

The northern area of the city, where the Economic and Technology Development Zone is located, is not well-served by buses. The metro line beginning at the downtown commercial center (near the Dalian railway station) runs through five administrative districts of the city and serves as an express transport between the northern (developing) region and the downtown area. The line extends northward to Golden Pebble Beach (Jinshitan Scenic Area), a national scenic park 50 km (31 mi) from the city center.[2] The Jiuli branch route was opened on 28 December 2008. The branch route connects central Dalian with Jinzhou District (金州区) with fourteen stations from south to north. The branch begins at Dalian Development Area station and stretches northwest ending at Jiuli station.

All stations have side platforms. Tracks in the platform area have no ballast (gravel); however, tracks outside the station are on ballast. All stations are covered by a combination of transparent corrugated sheets and a concrete roof.

In October 2017, most station names were re-translated from Pinyin into conventional English.

Opening timeline

Segment Commencement Length Station(s) Name
Dalian Railway Station — Golden Pebble Beach 8 November 2002 49.15 km (30.54 mi) 12 Phase 1 & 2
Dalian Development Area — Jiuli 28 December 2008 14.3 km (8.89 mi) 6 Jiuli branch extension

Service routes

Stations

Sign at Xianglujiao station showing the names of all stations on Line 3
Service
routes
Station name Connections Distance
km
Location
English Chinese
Template:DLM stations 大连站 Dalian railway station DLT 0.00 0.00 Xigang
Template:DLM stations 香炉礁 2.50 2.50
Template:DLM stations 金家街 4.40 6.90 Ganjingzi
Template:DLM stations 泉水 4.28 11.18
Template:DLM stations 后盐 3.38 14.56
Template:DLM stations 大连湾 6.56 21.12
Template:DLM stations 金马路 3.58 24.70 Jinzhou
Template:DLM stations 开发区 2.80 27.50
Template:DLM stations 保税区 2.63 30.13
Template:DLM stations 双D港 6.08 36.21
Template:DLM stations 小窑湾 2.79 39.00
Template:DLM stations 金石滩 9.70 48.70
Template:DLM stations 通世泰 2.23 50.93 Jinzhou
Template:DLM stations 鸿玮澜山 2.10 53.03
Template:DLM stations 东山路 1.70 54.73
Template:DLM stations 和平路 2.10 56.83
Template:DLM stations 十九局 2.56 59.39
Template:DLM stations 九里 2.37 61.76

References

  1. ^ a b "你关心的大连地铁建设情况来了". Dalian Metro. 2019-10-20.
  2. ^ 大连:50个地铁车站兼职过街通道. CCMetro.com (in Chinese). 22 April 2010. Archived from the original on 20 June 2015.