Line 10 (Chongqing Rail Transit)
Line 10 | |
---|---|
10 | |
Overview | |
Native name | 重庆轨道交通10号线 |
Status | Operational |
Line number | 10 |
Locale | Chongqing, China |
Termini | |
Stations | 19 |
Service | |
Type | Rapid transit |
System | Chongqing Rail Transit |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
History | |
Opened | 28 December 2017 |
Technical | |
Line length | 34 km (21 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | 1500 V DC Overhead line |
Operating speed | 120 km/h (75 mph) (Peak) |
Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wangjiazhuang — Liyuchi | 28 December 2017 | 33.7 km (20.94 mi) | 18 | Phase 1 |
S. Square of Chongqing N. Railway Station | 28 December 2018 | infill station | 1 |
Stations (north to south)
Service routes |
Station № |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|---|
E | L | English | Chinese | |||||
● | ● | 10/27 | Template:CRT stations | 王家庄 | Int'l Expo | — | — | Yubei |
| | ● | 10/26 | Template:CRT stations | 悦来 | Int'l Expo | 2.04 | 2.04 | |
| | ● | 10/25 | Template:CRT stations | 中央公园西 | 5 | 2.71 | 4.75 | |
| | ● | 10/24 | Template:CRT stations | 中央公园 | 1.09 | 5.84 | ||
| | ● | 10/23 | Template:CRT stations | 中央公园东 | 9 | 0.82 | 6.66 | |
| | ● | 10/22 | Template:CRT stations | 鹿山 | 1.64 | 8.30 | ||
| | ● | 10/21 | Template:CRT stations | 渝北广场 | 2.05 | 10.35 | ||
● | ● | 10/20 | Template:CRT stations | 江北机场T2航站楼 | 3 CKG | 0.74 | 11.09 | |
● | ● | 10/19 | Template:CRT stations | 江北机场T3航站楼 | CKG | 2.22 | 13.31 | |
| | ● | 10/18 | Template:CRT stations | 长河 | 5.31 | 18.62 | ||
| | ● | 10/17 | Template:CRT stations | 环山公园 | 1.85 | 20.47 | ||
| | ● | 10/16 | Template:CRT stations | 上湾路 | 9 | 1.67 | 22.14 | |
| | ● | 10/15 | Template:CRT stations | 三亚湾 | 2.74 | 24.88 | ||
| | ● | 10/14 | Template:CRT stations | 民心佳园 | 2.08 | 26.96 | ||
● | ● | 10/13 | Template:CRT stations | 重庆北站北广场 | 4 YW CUW | 2.61 | 29.57 | |
● | ● | 10/12 | Template:CRT stations | 重庆北站南广场 | 3 Loop YW CUW | 0.60 | 30.17 | |
| | ● | 10/11 | Template:CRT stations | 龙头寺公园 | 0.87 | 31.04 | ||
● | ● | 10/10 | Template:CRT stations | 红土地 | 6 | 1.63 | 32.67 | Jiangbei |
● | ● | 10/09 | Template:CRT stations | 鲤鱼池 | 9 | 1.09 | 33.76 | |
Phase II (Under construction)
- Under construction
Station № |
Station name | Connections | Distance km |
Location | |||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
10/08 | Template:CRT stations | 曾家岩 | 2 | Yuzhong | |||||
10/07 | Template:CRT stations | 大礼堂 | |||||||
10/06 | Template:CRT stations | 七星岗 | 1 | ||||||
10/05 | Template:CRT stations | 南滨路 | Nan'an | ||||||
10/04 | Template:CRT stations | 南坪 | 3 | ||||||
10/03 | Template:CRT stations | 万寿路 | |||||||
10/02 | Template:CRT stations | 南湖 | Loop | ||||||
10/01 | Template:CRT stations | 兰花路 | |||||||
References
- ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.