Alappuzha Bypass

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Arunvrparavur (talk | contribs) at 05:16, 7 August 2020 (Status info updated). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Alappuzha Bypass
ആലപ്പുഴ ബൈപ്പാസ്
Alappuzha Bypass Aerial View 1.jpg
Beachside aerial view of Alappuzha elevated bypass highway.
Route information
Maintained by NHAI
Length6.8 km (4.2 mi)
StatusUnder construction
History2015 - Present
Major junctions
South end NH-66 in Kalarcode
North end NH-66 in Kommady
Location
CountryIndia
Major citiesAlappuzha
Highway system

Alappuzha Bypass (Malayalam: ആലപ്പുഴ ബൈപ്പാസ്) is a part of NH 66 that bypasses CBD of Alappuzha city in Kerala, India. The 6.8 km long bypass is the first of its kind elevated beach highway in the country starting at Kalarcode in the south to Kommady in the north and runs along the scenic beachside of Alappuzha city. It is a joint venture between the central and state governments.[1]

History

The necessities and proposals for a bypass at Alappuzha dates back to early 1980s. NH 66 is one of the longest national highways in India stretching from Panvel to Kanyakumari and criss-crosses through Alappuzha city centre. The highway gets more and more narrower as it enters the urban area together with the criss-cross transformation creates no less than a bustle inside the city centre. Since then it was a long time plea to reroute the national highway around the downtown.[citation needed]

Timeline

Year Events
1980 Early proposals for constructing NH Bypass road at Alappuzha.
1980 The revenue department had acquired land for the bypass.
2008 Alappuzha bypass was included as a part of the project of National Highways Authority of India (NHAI).
2010 Centre had announced that the bypass project would be completed as a special project.
2015 Union transport and highways minister Nitin Gadkari inaugurated the long-pending construction works of the Alappuzha bypass from Kommadi to Kalarkode.
2017 Delay in fund allocation and public protest put off the proposed completion by September 2017.
2018 Indian Railways declined approval for constructing the two ROBs at Malikamukku and Kuthirapanthy.
2020 Railways granted permission to place girders at Malikamukku in January 2020.
2020 Following to Malikamukku, Railway nods to place girders at Kuthirapanthy in June 2020.

Project specifications

colspan="2"Template:Rail-header2
Project Title Alappuzha Bypass
Type Elevated Beach Highway
Total Distance 6.8 kilometres (4.2 mi)
Construction Mode Engineering Procurement Construction (EPC)
Contractor Cherian Varkey Construction Company, Kochi
South End Kalarcode
North End Kommady
ROBs 2 (Malikamukku & Kuthirapanthy)
Underpass
Major Bridges
No of Pilings
Piers
Culverts
Project Cost 348.43 crore (US$42 million)

Latest developments on bypass project