Hardy Farm tram stop
Template:Infobox Manchester Metrolink station
Hardy Farm tram stop was a proposed future tram stop on the phase 3b plans to Manchester Airport, which would have been on the north side of Sale Water Park. It was due to open in 2016 but was dropped from the plans.
References
- "Future extensions". Archived from the original on 8 April 2010.
- "Airport" (PDF). Archived from the original (PDF) on 5 March 2012.
53°25′49″N 2°16′42″W / 53.4303°N 2.2784°W