Line 2 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:16, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 2
2
The train arriving Liziba Station
Overview
Termini
Stations25
Service
TypeStraddle-beam monorail rapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corp., Ltd
Rolling stockHitachi Monorail
Daily ridership234,200 (2014 Daily Avg.)[1]
350,000 (2016 Peak)[2]
History
Opened18 June 2005; 18 years ago (2005-06-18)
Technical
Line length31.3 km (19.4 mi)
Route map

Jiaochangkou
Linjiangmen
Huanghuayuan
Daxigou
Zengjiayan
Niujiaotuo
Liziba
Fotuguan
Daping
Yuanjiagang
Xiejiawan
Yangjiaping
Zoo
Bus interchange
Dayancun depot
Dayancun
Mawangchang
Ping'an
Dadukou
Xinshancun
Bus interchange
Tiantangbao
Jianqiao
Jinjiawan
Liujiaba
Baijusi
Baijusi depot
Dajiang
Yudong
Bus interchange 3
The former logo of Line 2, which bears resemblance to Happy Mac

Line 2 of CRT runs southeastward from Template:CRT stations to Template:CRTs. Line 2 began operation as the first metro line in the West of China on 18 June 2005. It was subsequently expanded 1 June 2006 from Template:CRTs to Xinshancun, and on 30 December 2014 to Yudong. The line was China's first heavy monorail line, built using Hitachi Monorail technology.

Line 2, which currently runs 29.9 km (18.6 mi) and services 25 stations, begins as a subway under downtown Jiefangbei, then runs west along the southern bank of the Jialing River on an elevated line, and then turns south into the city's southwestern inner suburbs, looping back east to terminate at Yudong in Ba'nan.

Opening timeline

Segment Commencement Length Station(s) Name
Daping — Chongqing Zoo 6 November 2004 4.95 km (3.08 mi) 5 Phase 1 (initial section)
Jiaochangkou — Daping 11 December 2004 7.66 km (4.76 mi) 3 Phase 1 (final section)
Linjiangmen, Niujiaotuo, Liziba 28 December 2004 Infill stations 3
Fotuguan 9 April 2005 Infill station 1
Zengjiayan 15 June 2005 Infill station 1
Chongqing Zoo — Xinshancun 1 July 2006 5.54 km (3.44 mi) 5 Phase 2
Xinshancun — Yudong 30 December 2014 13.15 km (8.17 mi) 7 Line 2 & 3 connector project

Service routes

Current Stations

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
2/01 Template:CRT stations 较场口 1 0.00 0.00 Yuzhong
2/02 Template:CRT stations 临江门 0.70 0.70
2/03 Template:CRT stations 黄花园 1.20 1.90
2/04 Template:CRT stations 大溪沟 0.70 2.60
2/05 Template:CRT stations 曾家岩 10 0.80 3.40
2/06 Template:CRT stations 牛角沱 3 1.05 4.45
2/07 Template:CRT stations 李子坝 1.00 5.45
2/08 Template:CRT stations 佛图关 0.70 6.15
2/09 Template:CRT stations 大坪 1 1.60 7.75
2/10 Template:CRT stations 袁家岗 1.60 9.35 Jiulongpo
2/11 Template:CRT stations 谢家湾 Loop[a] 1.20 10.55
2/12 Template:CRT stations 杨家坪 1.30 11.85
2/13 Template:CRT stations 动物园 1.00 12.85
2/14 Template:CRT stations 大堰村 1.05 13.90
2/15 Template:CRT stations 马王场 1.15 15.05
2/16 Template:CRT stations 平安 1.05 16.10 Dadukou
2/17 Template:CRT stations 大渡口 1.10 17.20
2/18 Template:CRT stations 新山村 1.20 18.40
2/19 Template:CRT stations 天堂堡 0.75 19.15
2/20 Template:CRT stations 建桥 1.90 21.05
2/21 Template:CRT stations 金家湾 1.30 22.35
2/22 Template:CRT stations 刘家坝 1.35 23.70
2/23 Template:CRT stations 白居寺 1.70 25.40
2/24 Template:CRT stations 大江 3.70 29.10 Banan
2/25 Template:CRT stations 鱼洞 3 1.20 30.30

Notes

  1. ^ Out of system transfer.

References

  1. ^ "重庆轨道3号线成世界上最繁忙的单轨线". 国际在线. Archived from the original on 2014-12-05. Retrieved 2014-11-21.
  2. ^ "重庆轨道客运量9月30日创新高 达到257.4万乘次".