Basketball Arena (London)

Coordinates: 51°32′55″N 0°00′50″W / 51.5486°N 0.0139°W / 51.5486; -0.0139
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Addbot (talk | contribs) at 13:45, 22 February 2013 (Bot: Migrating 21 interwiki links, now provided by Wikidata on d:q810351 (Report Errors)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Basketball Arena
The Marshmallow[1]
The Basketball Arena in April 2012
Map
LocationOlympic Park
Stratford
London
United Kingdom
Coordinates51°32′55″N 0°00′50″W / 51.5486°N 0.0139°W / 51.5486; -0.0139
OperatorOlympic Delivery Authority
Capacity12,000
Field sizeLength 115 m, width 100 m, height 35 m.
Construction
Broke groundOctober 2009
BuiltJune 2011
ArchitectWilkinson Eyre Architects & KSS Design Group
Project managerSKM
Structural engineerSKM
Services engineerSKM
Main contractorsBarr Construction
Tenants
2012 Summer Olympics
2012 Summer Paralympics

The Basketball Arena for the 2012 Summer Olympics and the 2012 Summer Paralympics is located in the Olympic Park in Stratford, London. The arena is recyclable, and will be demolished and recycled in 2013.

History

London's Olympic bid proposed that there would be four arenas in the Olympic Park, but the revised masterplan published in 2006 reduced this to three, with the volleyball matches being moved to Earls Court Exhibition Centre.[2] The fencing arena was also cancelled, and the fencing took place at ExCeL.

The Basketball Arena interior

The Basketball Arena has 12,000 seats for Olympic basketball and the semi-finals and finals of the Olympic handball, and 10,000 for Paralympic wheelchair basketball and wheelchair rugby. The arena was also used as a holding area for athletes during the Opening and Closing Ceremonies of the games. Concept designs by Wilkinson Eyre Architects & KSS Design Group (sports consultants) were agreed in June 2008 and a planning application was submitted in November 2008. It is a temporary venue, and the largest built for any Games.[3] The possibility of subsequently deconstructing the arena and transporting it to Rio de Janeiro for the 2016 Summer Olympics was discussed, though the plan has been shelved due to doubts from some Brazilian officials about its feasibility.[4]

In early October 2008 it was speculated that Wembley Arena could be used as a replacement venue for the preliminary rounds of the 2012 Olympic basketball tournament instead of the Basketball Arena, thus saving up to £90 million, but in March 2009 it was confirmed that a new arena would be built in Stratford as originally proposed.

In late October 2009 it was announced that preparatory work had begun on the site and Paisley-based Barr Construction would begin building the main arena in spring 2010.[3] The basketball arena took 15 months to build and was completed in June 2011.[5]

In late 2012, it was announced that the arena will be demolished in the coming years. This is because the arena was only temporary for the Olympics. It is predicted that it will not be deconstructed until at least 2013. The materials of the arena are recyclable, meaning that the remaining debris can be recycled efficiently. The arena was officially put up for sale on 20 January 2013.[6]

The Brief

A simple to erect structure, but also a world-class sporting venue. Sustainability was another important concern. The arena was made out of sturdy individual components that could be easily dismantled and sub-divided for reuse elsewhere, with over two‐thirds of the materials and components to be recyclable. [7]

Construction

Instead of using a concrete sub-structure,a lightweight steel frame was used, with cladding. This meant the building (frame and cladding) was constructed in six weeks. The venue, a 30m‐high rectangular volume (the equivalent of a seven‐storey building) was made out of a steel portal frame and wrapped in 20,000 sqm of lightweight phthalate‐free and recyclable PVC plastic. This translucent bespoke cladding was then stretched across the steel framing modules that pushed the fabric out and created the three‐dimensional undulating pattern along the sides. An interwoven blackout layer was used in the roof fabric, this reduced most of the daylight during game sessions and maintained a fully controllable artificial lighting for use by the media and game spectators. The external fabric walls were translucent, allowing daylight to pass through during the day and artificial lighting to be visible during the evening.[7]

The architects worked with United Visual Artists (specialists in concert lighting and installations) to create lighting and colour‐changing effects for the evening games. The result was a dynamic illumination which, at night, transforms the white surface into a variety of saturated colours and strong silhouettes of the steel frame, creating the biggest light installation on the Olympic park.[7]

References

  1. ^ "Basketball Arena". thesun.co.uk. 16 July 2012. Retrieved 12 August 2012.
  2. ^ "London unveils Olympic masterplan". BBC News. 2006-06-07. Retrieved 2011-10-27.
  3. ^ a b "Construction starts on 2012 Basketball Arena | October 2009". Builder & Engineer. Retrieved 2012-07-29.
  4. ^ "Rio descarta usar ginásio de Londres nos Jogos de 2016". Gazeta do Povo (in Portuguese). 26 June 2012. Retrieved 6 July 2012.
  5. ^ "Work completed on basketball arena for London 2012". BusinessWeek. 2011-06-09. Retrieved 2011-10-27.
  6. ^ Mackay, Duncan (20 January 2013). "For sale: One Olympic Basketball Arena, hardly used". Inside the Games. Retrieved 3 February 2013.
  7. ^ a b c "London 2012 Basketball Arena / Wilkinson Eyre Architects". huffingtonpost.com. 24 July 2012. Retrieved 9 October 2012.