Belgrade–Bar railway

Route map:
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GünniX (talk | contribs) at 16:00, 2 December 2017 (References). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Belgrade–Bar railway
Overview
OwnerSerbian Railways, ŽICG
Termini
Service
Operator(s)Serbian Railways, ŽPCG
History
Opened1976
Technical
Line length476 km (296 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV, 50 Hz AC
Operating speed~ 70 km/h (43 mph) design speed 75(80)–120 km/h
Belgrade–Bar Railway
Template:BS-map

The Belgrade–Bar railway (Serbian: Пруга Београд–Бар or Pruga Beograd–Bar) is a railway connecting the Serbian capital of Belgrade with the town of Bar, a major seaport in Montenegro.

Overview

Mala Rijeka Viaduct

The Belgrade–Bar railway is a standard gauge railway, 476 km (296 mi) long. Of this length, 301 km (187 mi) of the railway goes through Serbia, and 175 km (109 mi) through Montenegro. It is electrified along the entire corridor (25 kV, 50 Hz AC). It passes through 254 tunnels of total length of 114,435 m (375,443 ft) and over 435 bridges (total length 14,593 m (47,877 ft)). The longest tunnels are "Sozina" 6.17 km (4 mi) and "Zlatibor" 6.139 km (4 mi). The biggest and the best known bridge is Mala Rijeka viaduct, 498 m (1,634 ft) long and 198 m (650 ft) above ground level.

The highest point of the railway is at 1,032 m (3,386 ft) AMSL, at the town of Kolašin. The railway descends to 40m AMSL at Podgorica in a relatively short distance, thus the gradient of 25 on this section.

A small 9 km (6 mi) section of the railway actually passes through Bosnia and Herzegovina, near the town of Štrpci, but the trains do not stop there.

When built, it took a train approximately seven hours to complete the trip from Belgrade to Bar. Today it takes 11 hours, due to speed restrictions, as the railway cannot safely sustain the projected speeds without being thoroughly rebuilt.

History

The decision to build the railway connection between Belgrade and Bar was made in 1952, as a national project of the SFRY. However, the construction was passed to the constituent Republics, SR Serbia and SR Montenegro, to build on their own.

The sections of the railway were completed as follows:

The construction works were concluded on 27 November 1975, by joining the railway tracks south of Kolašin.The railway was opened on 28. May 1976. Electrification was completed at the end of 1977.

Maintenance of the Belgrade–Bar railway suffered from chronic underfunding during the 1990s, which has resulted in the railway deteriorating and becoming unsafe. This culminated in the Bioče derailment, when a passenger train derailed, causing the deaths of 47 passengers. As a result, efforts are being made to thoroughly reconstruct the railway.

The Serbian part of the railway was targeted several times by NATO during its bombing campaign in 1999, seriously damaging portions of the railway.[citation needed] Also the small section that passes through Bosnia and Herzegovina was blown up by SFOR ground forces.[citation needed] All of this damage was later repaired.[citation needed]

In 2016 Serbia commenced a thorough reconstruction of the entire section on its territory. The aim is to make the line able to support the maximum speed of 120 km/h as was in the original project. The first section, from Belgrade to Valjevo, which represents 27% of the Serbian part of the line is due for completion during the summer of 2017.[1][2]

See also

References

  1. ^ Modernization of railway line, Serbian Railways - Official Youtube channel
  2. ^ Serbian Railways, Official Youtube channel
Former JŽ class 461 passing through Virpazar on the Belgrade–Bar line.
KML is from Wikidata