Jump to content

Greenwich line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Hammersfan (talk | contribs) at 14:37, 24 June 2015 (History). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Greenwich Line
A 1908 Railway Clearing House map of lines around the approaches to London Bridge, including the western end of the Greenwich Line.
Overview
StatusOperational
OwnerNetwork Rail
LocaleGreater London
Termini
Stations4
Service
TypeCommuter rail, Suburban rail
SystemNational Rail
Operator(s)Southeastern
Depot(s)Slade Green
Grove Park
Rolling stockBritish Rail Class 376
British Rail Class 465
British Rail Class 466
History
Opened8 February 1836
Technical
Line length3.08 miles (4.95 km)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed60 mph (96.5 km/h)
Greenwich line
1-69
London Bridge London Underground London River Services
Spa Road
Southwark Park
or New Cross
 
Surrey Canal Junction
4-25
North Kent East Junction
4-76
Deptford
5-36
Greenwich Docklands Light Railway
Greenwich Park
Greenwich College Tunnel
450 yd
411 m
6-27
Maze Hill
6-76
Westcombe Park
A102
Blackwall Tunnel
Southern Approach
Angerstein Wharf aggregates
7-44
Charlton

The Greenwich Line is a short railway line in South London that follows part of the route of the London and Greenwich Railway, which was the first railway line in London.

The line diverges from the South Eastern Main Line at North Kent East junction[1] and runs as far as Charlton junction[2] where it connects with the North Kent Line.

Stations

History

The line was electrified with the other SECR local routes to Dartford on 6 June 1926 by Southern Railway.

From 12 January 2015, services using the Greenwich Line were no longer able to serve London Charing Cross. This is due to the Thameslink Programme work, which removed the flat crossing at Spa Road Junction, located between London Bridge and Deptford. As a consequence of this, trains serving the Greenwich Line are no longer able to reach the line running into Charing Cross.[3] To compensate for the loss of this, London Cannon Street was given revised service times, with it being open seven days a week and until the end of service.[4]

Service patterns

Passenger services on the line are operated by Southeastern using Class 376, 465 & 466 trains.

The current service pattern (as of January 2015) is as follows:

Off-peak & Saturday:

Sunday:

References

  1. ^ Quail Map 5 - England South [page 3] Sept 2002 (Retrieved 2011-12-17)
  2. ^ Network Rail (August 2001). Southern Zone Route Sectional Appendix. Vol. Module SA. p. 1/123 SO290. SO/SA/001A.
  3. ^ "First major changes for passengers as London Bridge redevelopment gathers pace". 2013-05-16. Retrieved 20 June 2013.
  4. ^ "Southeastern consults on changes to timetable in December 2014". 2013-12-17. Retrieved 21 December 2013.