Jump to content

Highland Main Line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2a02:c7f:9c0b:9a00:d8d4:e5c3:683f:eee5 (talk) at 05:15, 28 July 2016 (Stations and services). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:Distinguish2

Highland Main Line
The Highland Main Line viaduct over
the River Findhorn at Tomatin
Overview
StatusOperational
OwnerNetwork Rail
LocalePerth and Kinross
Highland
Scotland
Termini
Stations10
Service
TypeHeavy rail
SystemNational Rail
Operator(s)Abellio ScotRail
Virgin Trains East Coast
Caledonian Sleeper
Rolling stockClass 43 "HST"
Class 158 "Express Sprinter"
Class 170 "Turbostar"
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Highland Main Line
Inverness
Culloden Moor
Daviot
Moy
Tomatin
Carrbridge
Aviemore Strathspey Railway (preserved)
Kincraig
Kingussie
Newtonmore
Dalwhinnie
Dalnaspidal
Struan
Black Island Platform
Blair Atholl
Killiecrankie
Pitlochry
Ballinluig
Guay
Dalguise
Dunkeld & Birnam
Rohallion
Murthly
Stanley Junction
Stanley
Strathord
Luncarty
Perth New Yard
Muirton
Perth

The Highland Main Line is a railway line in Scotland. It is 118 mi (190 km) long and runs through the Scottish Highlands linking a series of small towns and villages with Perth at one end and Inverness at the other. Today, services between Inverness and Edinburgh, Glasgow and London use the line. At Inverness the line connects with the Far North Line, the Aberdeen-Inverness Line and services on the Kyle of Lochalsh Line. All trains are diesel-powered, since the line is not electrified.

Much of the Highland Main Line is single track, and trains coming in opposite directions are often timed to arrive at stations at the same time, where crossing loops permit them to pass. Journey times between Inverness and Edinburgh or Glasgow are approximately three and a half hours.[1]

History

Highland Main Line and A9 highway next to each other in Perthshire, September 2000

The vast majority of the line was built and operated by the Highland Railway with a small section of the line between Perth and Stanley built by the Scottish Midland Junction Railway, amalgamated with the Aberdeen Railway to become the Scottish North Eastern Railway in 1856, and then absorbed by the Caledonian Railway in 1866. Originally, the line between Inverness and Perth went via Forres, but the Inverness and Aviemore Direct Railway was opened in 1898 to allow for a more direct routeing.

There are two significant summits on the line; Drumochter Summit between Blair Atholl and Dalwhinnie, and Slochd Summit between Carrbridge and Inverness. Other distinct features on the route include the viaducts at Culloden and Tomatin, the spectacular mountain pass at Drumochter and the severe gradients encountered in both directions, particularly the extended climb from Inverness to the Slochd summit which averages around 1 in 60 the whole way.

Stations and services

As of 2004, there are stations on the line as follows:

Places served Ordnance Survey grid references
and other notes
Perth NO112230
Dunkeld and Birnam NO030417
Shared station
Pitlochry NN937580
Blair Atholl NN870653
Dalwhinnie NN634848
Newtonmore NN715984
Kingussie NH756003
Aviemore NH895123
Connection with Strathspey Railway
Carrbridge NH899224
Inverness NH667454

Services on the line are provided by Abellio ScotRail and Virgin Trains East Coast. A roughly two-hourly Abellio ScotRail service operates between Perth and Inverness throughout the day, with all services running from either Glasgow Queen Street (via Stirling) or Edinburgh Waverley (via Kirkcaldy). The Virgin Trains East Coast service is titled 'The Highland Chieftain'. Formed of a HST unit, it departs Inverness at around 8am and runs to London Kings Cross, via Perth, Stirling, Falkirk, Edinburgh and the East Coast Main Line, arriving in London at about 4pm. The return working leaves London at midday and reaches Inverness in the late evening.

There is also the Caledonian Sleeper operated sleeping car service that travels overnight between Inverness and London Euston via Perth, Stirling, Edinburgh Waverley and the West Coast Main Line. This joins portions from Aberdeen and Fort William at Edinburgh Waverley and south of there becomes the longest locomotive-hauled passenger train in the UK - regularly loading to 16 Mark 2/3 coaches.

All trains between Perth and Inverness call at Pitlochry, Kingussie and Aviemore. Most ScotRail services call at Dunkeld and Birnam and at Blair Atholl, with the stations at Dalwhinnie, Newtonmore and Carrbridge being served less often. On Sundays, a couple of services continue through to Elgin, calling at Nairn and Forres. [2]

Panoramic view of the Highland Line Culloden Viaduct with a First ScotRail train on it

Usage

Station usage at some stations remain stable. Overall usage on the line comparing April 2003 to April 2010 has increased 154%.

Station usage
Station name 2002–03 2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19 2019–20 2020–21 2021–22 2022–23
Perth 641,822 694,527 700,509 763,415 886,748 888,586 929,282 959,310 975,364 988,795 1,077,598 1,077,598
Dunkeld and Birnam 15,406 18,810 19,339 21,897 20,856 26,010 25,436 26,178 26,506 27,862 29,924 31,050
Pitlochry 66,890 84,555 88,638 78,193 78,776 97,302 87,210 87,684 90,618 98,340 101,902 112,496
Blair Atholl 8,313 11,708 11,896 10,491 10,443 11,716 11,572 13,948 12,608 14,280 14,084 16,062
Dalwhinnie 2,066 1,619 2,013 1,774 1,975 2,644 2,208 1,894 1,984 2,172 2,472 2,460
Newtonmore 4,184 5,396 6,815 6,631 7,060 8,358 7,972 9,484 9,406 8,958 8,326 8,636
Kingussie 23,815 27,725 30,045 32,135 33,416 42,618 35,838 38,544 40,298 40,954 41,408 42,522
Aviemore 70,272 80,977 91,456 101,294 115,431 152,528 124,972 132,336 132,052 136,456 141,311 150,724
Carrbridge 1,531 1,910 2,987 3,954 5,438 4,232 4,500 5,118 5,636 4,454 5,540 6,256
Inverness 721,358 822,928 873,011 915,840 975,569 1,407,600 1,070,924 1,127,718 1,180,160 1,213,382 1,282,445 1,303,662
The annual passenger usage is based on sales of tickets in stated financial years from Office of Rail and Road estimates of station usage. The statistics are for passengers arriving and departing from each station and cover twelve-month periods that start in April. Methodology may vary year on year. Usage from the periods 2019-20 and especially 2020-21 onwards have been affected by the Covid-19 pandemic

References