Line 10 (Chongqing Rail Transit)
Appearance
Line 10 | |||
---|---|---|---|
Add→{{rail-interchange}} | |||
Overview | |||
Native name | 重庆轨道交通10号线 | ||
Status | Under construction | ||
Line number | 10 | ||
Locale | Chongqing, China | ||
Termini | |||
Stations | 19 | ||
Service | |||
Type | Rapid transit | ||
System | Chongqing Rail Transit | ||
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. | ||
History | |||
Planned opening | December 2017 | ||
Technical | |||
Line length | 32.2 km (20.0 miles) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | 1500 V DC Overhead line | ||
Operating speed | 120 km/h (75 mph) (Peak) | ||
|
Line 10 of CRT is a rapid transit line which is expected to be opened in December 2017.[1]
Planned Stations
Phase I
Service routes |
Station № |
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
10/01 | Wangjiazhuang | 王家庄 | Add→{{rail-interchange}} | — | — | Yubei | |||
10/02 | Yuelai | 悦来 | Add→{{rail-interchange}} | ||||||
10/03 | Central Park West | 中央公园西 | Add→{{rail-interchange}} | ||||||
10/04 | Central Park | 中央公园 | |||||||
10/05 | Central Park East | 中央公园东 | Add→{{rail-interchange}} | ||||||
10/06 | Lushan | 鹿山 | |||||||
10/07 | Yubei Square | 渝北广场 | |||||||
10/08 | Terminal 2 | T2航站楼 | Add→{{rail-interchange}} | ||||||
10/09 | Terminal 3 | T3航站楼 | |||||||
10/10 | Changhe | 长河 | |||||||
10/11 | Huanshan Park | 环山公园 | |||||||
10/12 | Shangwanlu | 上湾路 | Add→{{rail-interchange}} | ||||||
10/13 | Sanyawan | 三亚湾 | |||||||
10/14 | Minxinjiayuan | 民心佳园 | |||||||
10/15 | North Square of Chongqingbei Railway Station | 重庆北站北广场 | Add→{{rail-interchange}} | ||||||
10/16 | South Square of Chongqingbei Railway Station | 重庆北站南广场 | Add→{{rail-interchange}} Add→{{rail-interchange}} | ||||||
10/17 | Longtousi Park | 龙头寺公园 | |||||||
10/18 | Hongtudi | 红土地 | Add→{{rail-interchange}} | Jiangbei | |||||
10/19 | Liyuchi | 鲤鱼池 | Add→{{rail-interchange}} |
Phase II
Service routes |
Station № |
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||
10/20 | Zengjiayan | 曾家岩 | Add→{{rail-interchange}} | Yuzhong | |||||
10/21 | Renmin Square | 人民广场 | |||||||
10/22 | Qixinggang | 七星岗 | Add→{{rail-interchange}} | ||||||
10/23 | Nanbinlu | 南滨路 | Nanan | ||||||
10/24 | Nanping | 南坪 | Add→{{rail-interchange}} | ||||||
10/25 | Wanshoulu | 万寿路 | |||||||
10/26 | Nanhu | 南湖 | Add→{{rail-interchange}} | ||||||
10/27 | Lanhualu | 兰花路 |
References
- ^ "重庆市主城形成多层次立体交通体系". May 16, 2017.
{{cite web}}
: Cite has empty unknown parameter:|dead-url=
(help)