Line 1 (Lanzhou Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 03:27, 12 August 2018 (→‎Stations). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
 1 
Dongfanghong Square under construction in October 2017
Overview
LocaleLanzhou, Gansu, China
Termini
Stations20
Service
TypeRapid transit
SystemLanzhou Metro
Operator(s)Lanzhou Railway Company
History
Opened2nd half of 2018
Technical
Line length25.44 km (15.81 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed120 km/h
Line 1
Simplified Chinese兰州地铁1号线
Traditional Chinese蘭州地鐵1號線

Line 1 of the Lanzhou Metro is a subway line in Lanzhou running from Template:LanzhouM stations to Template:LanzhouM stations, has 20 stations and is 25.44 kilometres (15.81 mi) long. It was to begin operations in second half of 2018 after debugging and trial runs.

History

Line 1 started construction on July 9, 2012. Line 1 is 25.44 kilometers (15.8 mi) with 20 stations.[1][2] The line is completely underground with a completion deadline of 2017.[3] The first two lines will cost about 23 billion yuan ($3.6 billion) and be completed by 2020.[4] The opening date for Line 1 was pushed to 2018.[5] The operating speed will be 80 kilometres per hour (50 mph).[6] At least some of the stations are fitted with full glass platform screen doors.[7]

On 22 October 2015, a fire broke out at the construction site of Donggang station. No casualties were reported by authorities.[8]

Rolling stock

In October 2016, the first two metro trains were delivered, but services have not started yet. The line will be served by a fleet of 26 high capacity type A EMUs with a capacity of 2460 passengers per trainset.[9] Each set is 139.98 metres (459.3 ft) long, 3.09 metres (10.1 ft) wide and 3.8 metres (12 ft) high. The rolling stock is manufactured in Changchun by China's CRRC.[6][10] The train sets are developed to be able to withstand sand storms, and feature aluminium bodywork with sand resistant paint, sand resistant glass, and the ventilation system is designed to handle large amounts of dust in the air.[11][12]

Opening timeline

Segment Commencement Length Station(s) Name
Donggang — Chenguanying 2018 25.44 km (15.81 mi) 20 Phase 1

Stations

station name Transfer Distance
km
Location
English Chinese
Template:LanzhouM stations 陈官营 0.00 0.00 Xigu
Template:LanzhouM stations 深安大桥南 1.40 1.40 Qilihe
Template:LanzhouM stations 兰州城市学院(省科技馆) 2.49 3.89 Anning
Template:LanzhouM stations 兰州海关 0.88 4.77
Template:LanzhouM stations 马滩 2.14 6.91 Qilihe
Template:LanzhouM stations 土门墩 1.52 8.43
Template:LanzhouM stations 兰州西站北广场  LZ  1.09 9.52
Template:LanzhouM stations 西站什字 1.72 11.24
Template:LanzhouM stations 七里河 0.96 12.20
Template:LanzhouM stations 小西湖 1.43 13.63
Template:LanzhouM stations 文化宫 0.85 14.48
Template:LanzhouM stations 西关 1.02 15.50 Chengguan
Template:LanzhouM stations 省政府 1.06 16.56
Template:LanzhouM stations 东方红广场 1.22 17.78
Template:LanzhouM stations 兰州大学 1.59 19.37
Template:LanzhouM stations 五里铺 1.30 20.67
Template:LanzhouM stations 省气象局 1.28 21.95
Template:LanzhouM stations 拱星墩 1.17 23.12
Template:LanzhouM stations 焦家湾 1.07 24.19
Template:LanzhouM stations 东岗 1.25 25.44

References

  1. ^ "兰州城市轨道交通工程开工奠基 刘伟平冯健身赵广发欧阳坚出席奠基仪式". gansudaily.com.cn. Retrieved 30 April 2015.
  2. ^ UK, DVV Media. "Lanzhou metro construction begins".
  3. ^ "兰州城市轨道交通工程昨开工-今日兰州". xinhuanet.com. Retrieved 30 April 2015.
  4. ^ "N.W. China city to usher in subways". China Daily. Xinhua. 27 June 2012. Retrieved 23 July 2015.
  5. ^ "甘肃省长唐仁健:兰州城市轨交一号线一期工程今年将建成运营". www.sohu.com. 2018-01-26. Retrieved 2018-01-27.
  6. ^ a b "兰州,你的地铁已到货!注意签收". 25 October 2016.
  7. ^ "兰州地铁1号线隧道实现"洞通" 四穿黄河(图)". 17 November 2017.
  8. ^ "兰州地铁东岗工地发生火灾(组图)". 22 October 2015. Retrieved 24 March 2016.
  9. ^ http://www.weibo.com/1791298665/E0PnkmV0s?from=page_1002061791298665_profile&wvr=6&mod=weibotime. 兰州轨道交通1号线一期工程首列电动客车于3月份在吉林长春开始生产制造,今年10月下线运抵兰州。据悉,1号线一期工程建成运营后,将配备26列电动客车,每列客车最大载客量达2460人。 {{cite web}}: Missing or empty |title= (help)
  10. ^ "兰州轨道交通".
  11. ^ "中国北车将为兰州研制抗风沙地铁车". 16 February 2016.
  12. ^ "我国首列抗风沙地铁在长春下线". 2 August 2016.