Line 2 (Chengdu Metro)

From Wikipedia, the free encyclopedia
  (Redirected from Line 2, Chengdu Metro)
Jump to navigation Jump to search
Line 2
2
245 at Xipu (20180216082751).jpg
Train of Line 2 at Xipu railway station
Overview
Type Rapid transit
System Chengdu Metro
Status Operational
Locale Chengdu, China
Termini Xipu
Longquanyi
Stations 32
Services 1
Daily ridership 838,200 (2016 Peak)[1]
Operation
Owner Chengdu
Operator(s) Chengdu Metro Limited
Character Underground and Elevated
Technical
Line length 42.32 km (26.30 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Route map

English
犀浦
Xipu
Chengdu–Dujiangyan Intercity Railway
天河路
Tianhe Road
百草路
Baicao Road
金周路
Jinzhou Road
金科北路
Jinke Road North
迎宾大道
Yingbin Avenue
茶店子客运站
Chadianzi Bus Terminal
羊犀立交
Yangxi Flyover
一品天下
Yipin­tianxia
7 (not open)
蜀汉路东
Shuhan Road East
白果林
Baiguolin
中医大省医院
Chengdu University of TCM and
Sichuan Provincial People's Hospital
通惠门
Tonghuimen
人民公园
People's Park
天府广场
Tianfu Square
春熙路
Chunxi Road
东门大桥
Dongmen Bridge
牛王庙
Niuwangmiao
牛市口
Niushikou
东大路
Dongda Road
塔子山公园
Tazishan Park
火车东站
East Railway Station
China Railway High-speed 7 (not open)
成渝立交
Chengyu Flyover
惠王陵
Huiwangling
洪河
Honghe
成都行政学院
Chengdu Institute of
Public Administration
大面铺
Damianpu
连山坡
Lianshanpo
界牌
Jiepai
书房
Shufang
龙平路
Longping Road
龙泉驿
Longquanyi

Line 2 of the Chengdu Metro (Chinese: 成都地铁2号线; pinyin: Chéngdū Dìtiě Èr Hào Xiàn)is the second line on the metro network in Chengdu, Sichuan. Line 2 is a crosstown northwest-southeast trunk route. This line serves the Chengdu East railway station. Line 2 began operation on September 16, 2012.[2]

Opening timeline[edit]

Segment Commencement Length Station(s) Name
Chadianzi Bus Terminal — CIPA 16 September 2012 22.4 km (13.92 mi) 20 Phase 1
Xipu — Chadianzi Bus Terminal 8 June 2013 8.8 km (5.47 mi) 6 Phase 2 (eastern section)
CIPA — Longquanyi 26 October 2014 11.1 km (6.90 mi) 6 Phase 2 (western section)

Stations[edit]

Cross-platform interchanges between different train categories between different train categories in Xipu railway station, Chengdu. The double track of the urban railway (Line 2 of Chengdu Metro) is in the middle, while the double track of National rail transport system (Chengdu–Dujiangyan Intercity Railway) is on both sides, respectively. It is the first implementation of It is the first implementation of Cross-platform interchanges between different train categories in China.[3]
Service
routes
Station name Connections Distance
km
Location
English Chinese
Xipu 犀浦  6   CG  0.00 0.00 Pidu
Tianhe Road 天河路 1.85 1.85
Baicao Road 百草路 1.65 3.50
Jinzhou Road 金周路 2.20 5.70 Jinniu
Jinke Road North 金科北路 1.15 6.85
Yingbin Avenue 迎宾大道 1.05 7.90
Chadianzi Bus Terminal 茶店子客运站 0.90 8.80
Yangxi Flyover 羊犀立交 1.50 10.30
Yipin­tianxia 一品天下 7 0.85 11.15
Shuhan Road East 蜀汉路东 1.10 12.25
Baiguolin 白果林 1.25 13.50
CUTCM and Sichuan Provincial People's Hospital 中医大省医院 4  5  1.15 14.65 Qingyang
Tonghuimen 通惠门 0.85 15.50
People's Park 人民公园 0.85 16.35
Tianfu Square 天府广场 1 0.95 17.30
Chunxi Road 春熙路 3 1.40 18.70 Jinjiang
Dongmen Bridge 东门大桥 0.95 19.65
Niuwangmiao 牛王庙  6  0.80 20.45
Niushikou 牛市口 Chengdu BRT Chengdu BRT 1.60 22.05
Dongda Road 东大路 0.60 22.65
Tazishan Park 塔子山公园 1.15 23.80
East Railway Station 成都东客站 7 Chengdu East railway station ICW 1.65 25.45 Chenghua
Chengyu Flyover 成渝立交 0.80 26.25
Huiwangling 惠王陵 1.60 27.85 Longquanyi
Honghe 洪河 0.95 28.80
Chengdu Institute of Public Administration 成都行政学院 1.50 30.30
Damianpu 大面铺 3.20 33.50
Lianshanpo 连山坡 1.25 34.75
Jiepai 界牌 1.25 36.00
Shufang 书房 1.85 37.85
Longping Road 龙平路 1.90 39.75
Longquanyi 龙泉驿 1.70 41.45

Est. Completion[edit]

Est. Completion Phase # Starting station/Ending station Length(KM) stations
2012-9 Phase 1 Chadianzi Bus Terminal Chengdu Institute of Public Administration 22.47 20
2012-12 (opened on June 1, 2013) Phase 2 - West Extension Xipu Chadianzi Bus Terminal 8.738 6
2014-12 Phase 2 - East Extension Chengdu Institute of Public Administration Longquan East 11.1 6

References[edit]

  1. ^ "9月30日成都地铁客流达238.11万乘次 创新高". 成都全搜索新闻网. Retrieved 2016-10-02. 
  2. ^ 成都地铁2号线今日正式开通试运营. Archived from the original on December 19, 2012. Retrieved September 16, 2012. 
  3. ^ "成灌快铁犀浦站正式开建". 成都市官方网站. 2009-08-26. Archived from the original on 2014-04-24. Retrieved 2013-08-08.