Jump to content

Line 3 (Chengdu Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by LMX97 (talk | contribs) at 11:10, 4 November 2016 (→‎Stations). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 3
Overview
StatusOperational
OwnerChengdu
LocaleChengdu, China
Termini
Stations17
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
History
Opened31 July 2016
Technical
Line length20.33 km (12.63 mi)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 of the Chengdu Metro (Chinese: 成都地铁3号线; pinyin: Chéngdū Dìtiě Sān Hào Xiàn) runs in a northeast-southwest direction from Chengdu Junqu General Hospital to Taipingyuan. The total length is 20.33 km. Line 3's color is magenta. Phase 1 of this line began construction on 28 April 2012, and opened on 31 July 2016.[2]

Stations

Station name Transfer Location
English Hanzi
Chengdu Junqu General Hospital 军区总医院 Jinniu
Xiongmao Avenue 熊猫大道 Chenghua
Chengdu Zoo 动物园
Zhaojuesi Road South 昭觉寺南
Simaqiao 驷马桥 7 (under construction)
Lijiatuo 李家沱
Qianfeng Road 前锋路 6 (under construction)
Hongxing Bridge 红星桥 Jinjiang
2nd Chengdu People's Hospital 市二医院 4
Chunxi Road 春熙路 2
Xinnanmen 新南门
Moziqiao 磨子桥 Wuhou
Sichuan Gymnasium 省体育馆 1
Yiguanmiao 衣冠庙
Gaoshengqiao 高升桥 5 (under construction)
Hongpailou 红牌楼
Taipingyuan 太平园 10 (under construction)

See also

References

  1. ^ "9月30日成都地铁客流达238.11万乘次 创新高". 成都全搜索新闻网. Retrieved 2016-10-02.
  2. ^ "3号线来了 31日8时30分正式开通". Chengdu Economic Daily. 2016-07-28. Retrieved 2016-07-28.