Liverpool2
Liverpool2 | |
---|---|
Location | |
Location | Seaforth, Liverpool, United Kingdom |
Coordinates | 53°27′11″N 3°01′23″W / 53.453°N 3.023°W |
OS grid | SJ321956 |
Details | |
Owner | The Peel Group |
Operator | Mersey Docks and Harbour Company |
Opened | 4 November 2016[1] |
Type | Wharf |
Purpose | Cargo transfer |
Minimum depth | 16.5 m (54 ft)[2] |
Quay length | 850 m (2,790 ft)[2] |
Cranes |
|
Cargo type | |
Transport links |
|
Liverpool2 is a container terminal extension adjoining the River Mersey in Seaforth, Merseyside. The extension, built by Peel Ports, officially opened on 4 November 2016[1] and is an expansion of the Seaforth Dock container terminal.
Development
The groundbreaking ceremony was held on 6 June 2013, with Sir Bobby Charlton and Kenny Dalglish present at the event.[3] The emplacement of steel pilings commenced from October 2013 utilising 329 piles, weighing 47 tonnes each.[4] In total, 19,000 tonnes of metalwork was used to form a 30 m (98 ft)-high, and 854 m (2,802 ft)-long, quay wall.[4]
By July 2014, dredging of a 27 km2 (10 sq mi) area of the River Mersey approach channel had been commenced by Van Oord.[5] The extension was built on reclaimed land using the material dredged from the River Mersey,[6] with the deepened approach channel providing the necessary clearance for visiting ships.[7] Construction was delayed by 60 days during winter storms in 2014.[8] 5.5m tonnes of material was dredged, involving a workforce of 440 specialists.[9]
The first five ZPMC-built Megamax ship-to-shore cranes were all on the quayside by November 2015, having been delivered from Shanghai, with eight of these cranes ultimately planned for the site.[10][11][12] The first five cranes were delivered by the ship Zhen Hua 23 .[13] The intended opening date of December 2015 was missed, being moved to the summer of 2016,[8] and ultimately rescheduled for the autumn.[14] A first batch of six ZPMC-built cantilever rail-mounted gantry cranes were delivered to the site in May 2016,[15] arriving from Nantong aboard the ship Zhen Hua 25.[16] Berthing trials began in June 2016, with MSC vessels participating in the procedures throughout the following months.[17] A further six gantry cranes were added in October 2016; these being delivered by the ship Zhen Hua 8, also from Nantong.[11][18] The extension was built at a cost of £400m and ultimately opened on 4 November 2016 by Liam Fox, the Secretary of State for International Trade.[6][19]
Operation
The terminal extension is able to accommodate two 13,500 TEU post-Panamax vessels simultaneously,[20][21][22] As of 2016, the site is served by five Megamax cranes and twelve cantilever rail-mounted gantry cranes, completing phase one of the development.[23] The gantry cranes are remotely operated, from a logistics building 2 km (1.2 mi) away.[14] The terminal has also gained the most advanced quayside to HGV automated transfer technology in Europe.[24]
Future
Phase two of the development will include three more ship-to-shore cranes and an additional ten gantry cranes.[23] When fully completed, the site will be served by 8 Megamax cranes and 22 cantilever rail-mounted gantry (CRMG) cranes.[25] This will allow an eventual capacity of 1m TEU for the site.[14][23] Peel Ports announced in July 2017 that it was proceeding with the expansion and that planning work had started to bring the remaining three Megamax and ten CRMG cranes to the port. The work also involves the installation of additional reefer points to allow the port to handle a greater quantity of refrigerated containers. The expansion is estimated to be completed in 2019.[26]
An upgrade to the Canada Dock Branch was announced in May 2016 that would allow up to forty eight trains a day to visit the port. Upgrade of the line is expected to be complete by 2019.[27] Consideration is also being given for improved road access to the terminal, from the M57 motorway junction at Switch Island, in order to ease the expected HGV congestion.[28]
See also
References
- ^ a b Houghton, Alistair (3 November 2016). "Look at these stunning views from Port of Liverpool's massive new cranes". Liverpool Echo. Retrieved 3 November 2016.
- ^ a b "Liverpool2 News" (PDF). Peel Ports Group. 2014. Retrieved 4 November 2016.
{{cite web}}
: Cite has empty unknown parameter:|1=
(help) - ^ "Peel Ports kick-off Liverpool2 project". Port Technology. 6 June 2013. Retrieved 5 November 2016.
- ^ a b "Liverpool2 construction enters key steel piling phase". Port Technology. 15 October 2013. Retrieved 5 November 2016.
- ^ "Dredging commences at Liverpool2". Port Technology. 16 July 2014. Retrieved 5 November 2016.
- ^ a b Modeva, Svetlana (4 November 2016). "Official Opening Of Peel Ports £400 Mln Liverpool Container Terminal (Video)". Vessel Finder. Retrieved 5 November 2016.
- ^ Siddle, John (28 May 2013). "£35m boost for Liverpool2 superport docks dredging programme". Liverpool Echo. Retrieved 5 November 2016.
- ^ a b Hodgson, Neil (31 March 2016). "Liverpool2 gearing up for summer opening amid 'significant' industry interest". Liverpool Echo. Retrieved 4 November 2016.
- ^ Hodgson, Neil (23 July 2015). "Liverpool2 on schedule as it prepares for the return of the world's biggest ships to the Mersey". Liverpool Echo. Retrieved 4 November 2016.
- ^ Hodgson, Neil (23 November 2015). "Peel Ports offloads fifth and final Megamax crane at Liverpool2". Liverpool Echo. Retrieved 4 November 2016.
- ^ a b "Mersey Liverpool2 Development Get CRMGs". Port Technology. 11 October 2016. Retrieved 4 November 2016.
- ^ "Liverpool2 Receives 'MegaMax' Cranes". Port Technology. 4 November 2015. Retrieved 4 November 2016.
- ^ "New cranes arrive in Liverpool". World Cargo News. 4 November 2015. Retrieved 5 November 2016.
- ^ a b c "Liverpool2 gears up for autumn opening". Port Strategy. 19 May 2016. Retrieved 4 November 2016.
- ^ "Peel Ports Receives Huge Liverpool2 Crane Order". Port Technology. 3 May 2016. Retrieved 4 November 2016.
- ^ "CRMG cranes arrive in Mersey for Liverpool2 development". Liverpool & Sefton Chambers of Commerce. 3 May 2016. Retrieved 5 November 2016.
- ^ "Liverpool2 undergoes trials ahead of full opening". Insider Media Limited. 29 June 2016. Retrieved 4 November 2016.
- ^ "Six giant cranes arrive for Liverpool2". Insider Media Limited. 12 October 2016. Retrieved 4 November 2016.
- ^ "Liverpool's new £400m container terminal opens". BBC News. 4 November 2016. Retrieved 4 November 2016.
- ^ "A New Deep Water Container Terminal". Peel Ports. Retrieved 1 August 2014.
- ^ "Liverpool 2 - Fast Facts". Peel Ports. Retrieved 3 August 2014.
- ^ "Peel Ports plans lavish official opening party for Liverpool2". Lloyd's List. 22 September 2016. Retrieved 4 November 2016.
- ^ a b c "30 ZPMC cranes for Liverpool2". Container Management. 23 April 2014. Retrieved 5 November 2016.
- ^ Hodgson, Neil (18 February 2016). "Peel Ports' £20m autogate investment will increase capacity at Liverpool2". Liverpool Echo. Retrieved 4 November 2016.
- ^ "Liverpool2 to feature Chinese Megamax cranes". World Maritime News. Retrieved 4 November 2016.
- ^ "Peel Ports starts second phase of Liverpool2 expansion". Business Cloud. Retrieved 18 July 2017.
- ^ "Rail upgrades promised as part of Port of Liverpool developments". Rail Technology Magazine. 16 May 2016. Retrieved 27 June 2016.
- ^ Traynor, Luke (22 July 2016). "Calls for tunnel link from Liverpool2 terminal to Switch Island to ease lorry congestion". Liverpool Echo. Retrieved 4 November 2016.
External links
- "Liverpool 2". Peel Ports. Retrieved 3 August 2014.