Jump to content

Wachusett Dam

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Hmains (talk | contribs) at 03:55, 31 October 2015 (copyedit, already indirectly in category, refine cat, and AWB general fixes using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Wachusett Dam
Wachusett Dam at Clinton
Official nameWachusett Reservoir Dam
LocationClinton, Massachusetts, USA
Construction began1897
Opening date1905
Operator(s)MWRA
Dam and spillways
ImpoundsNashua River
Height205 ft
Length965 ft
Reservoir
CreatesWachusett Reservoir
Wachusett Dam Historic District
Wachusett Dam is located in Massachusetts
Wachusett Dam
LocationClinton, Massachusetts
ArchitectShepley, Rutan and Coolidge; Olmsted Brothers
Architectural styleNo Style Listed
MPSWater Supply System of Metropolitan Boston MPS
NRHP reference No.89002269 [1]
Added to NRHPJanuary 18, 1990

The Wachusett Dam in Clinton, Massachusetts impounds the Nashua River creating the Wachusett Reservoir. Construction started in 1897[2] and was completed in 1905. It is part of the Nashua River Watershed.

This dam is part of greater Boston's water system, maintained and controlled by the Massachusetts Water Resources Authority (MWRA). Its discharge is into the Nashua River. When it was completed in 1905, the Wachusett Reservoir was the largest public water supply reservoir in the world.[2] At that time, the Wachusett Reservoir Dam was the largest gravity dam in the world as well.

Construction

The Metropolitan Water Board selected the south branch of the Nashua River in Clinton as the best site for Boston's new water supply over New Hampshire's Lake Winnipesaukee, Maine's Sebago Lake, and the Merrimack River.[2]

Churches, factories, homes, and schools within the valley had to be knocked down or moved. Roads and rail lines had to be relocated; a railroad tunnel and trestle had to be built in order to relocate the Central Massachusetts Railroad, and over four thousand bodies had to be dug up and moved in the local Catholic cemetery.[citation needed] The project brought thousands of immigrants to the area for work.

The dam created the world's largest water supply reservoir at the time.[2] It is still considered the largest "hand dug" dam in the world today.[citation needed]

Early problems

A static liquefaction flow failure occurred in the upstream slope of the North Dike of Wachusett Dam near Clinton, Massachusetts on April 11, 1907 during the first reservoir filling. The fine sands of the upstream dike shell liquefied and flowed approximately 100 meters horizontally into the reservoir. This caused many Clinton residents considerable concern. However, the project’s Chief Engineer, Frank E. Winsor, assured the townsfolk that everything was okay. This event remains controversial. At least one engineering study claims that the initial failure is a precursor to the dam’s future failure.[citation needed] However, it has now stood for over one hundred years.