Jump to content

Yekaterinburg Metro

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jonesey95 (talk | contribs) at 15:35, 4 October 2016 (Fix unsupported parameters in infobox). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Yekaterinburg Metro
A train at Prospekt Kosmonavtov station
A train at Prospekt Kosmonavtov station
Overview
Native nameЕкатеринбургский метрополитен
Ekaterinburgskiy metropoliten
LocaleYekaterinburg, Russia
Transit typeRapid transit
Number of lines1
Number of stations9
Daily ridership130,000 (daily average, 2012)[1]
Operation
Began operation1991
Technical
System length12.7 km (7.9 mi) [1]
Track gauge1,524 mm (5 ft) (?)

The Yekaterinburg Metro (Russian: Екатеринбу́ргский Метрополите́н) is a rapid transit system that serves the city of Yekaterinburg, Russia. The Metro opened on 26 April 1991, and is 12.7 kilometres (7.9 mi) long[1] and serves 9 stations.[1] The Yekaterinburg Metro was the 13th and last metro to open in the USSR.

History

People gather on the platform at Dinamo, one of the stations in the Yekaterinburg Metro system

Yekaterinburg, formerly called Sverdlovsk, was always known as the informal capital of the Urals, a natural divide between Europe and Asia, between European Russia and Siberia. The city grew very rapidly because it was an important industrial centre and a transport hub. Plans for a rapid-transit system began in the late 1970s, and in 1980 construction began.

The city's uneven landscape, as well as its layout with a very dense city centre, prompted to combine deep and shallow stations. On 26 April 1991, the sixth Metro of Russia and the thirteenth and last Metro of the Soviet Union, which ceased to exist only a few months later, was finally opened to the public. The economic crisis of the early 1990s rocked the Metro very hard and the first stage encompassed only three stations. However, then Russian president Boris Yeltsin diverted state funds to complete its construction and by 1995 the Metro was doubled in length. Since then, only two extensions have been built.

Timeline

Prospekt Kosmonavtov
Uralmash
Mashinostroiteley
Uralskaya
Dinamo
Ploshchad 1905 Goda
Geologicheskaya
Bazhovskaya
Chkalovskaya
Botanicheskaya
Segment Date opened
Prospekt KosmonavtovMashinostroiteley April 26, 1991
MashinostroiteleyUralskaya December 22, 1992
UralskayaPloshchad 1905 Goda December 22, 1994
Ploshchad 1905 GodaGeologicheskaya December 30, 2002
GeologicheskayaBotanicheskaya November 28, 2011
Chkalovskaya July 28, 2012

Operation

The Metro is a typical Soviet design, which when completed will form a triangle from three lines intersecting in the city centre. The eight stations comprise 12.7 kilometres (7.9 mi) of length and are split between deep and shallow. Of the latter, four are pillar-trispans and one is a single vault (built to Kharkov technology). The deep-level stations include one pylon, one column and two Leningrad-technology single vaults, although one was built to a design making it appear as a single deck. Like all ex-Soviet Metros, the stations are elaborately decorated, although economic hardships prevented the full original designs from being implemented.

The Metro is served by one depot, Kalinovskoye, and 62 cars are assigned to it.

Ridership has improved in recent years. In 2011, the average daily ridership on the Metro was 105,000.[2] By 2012, the average daily ridership had increased to 130,000.[1] This corresponds to an annual ridership in 2012 of approximately 47.45 million people.

Plan of the Yekaterinburg Metro

Plans

The construction of the Bazhovskaya station which should be between the "Geologicheskaya" and "Chkalovskaya" has been postponed indefinitely.

The first section of the second line with length of 4.5 km should have four stations: "Metallurgicheskaya", "Tatishchyevskaya", "Ploshchad Kommunarov" and "Ploshchad 1905 Goda". Station "Tatishchyevskaya" and "Ploshchad Kommunarov" will be near Central Stadium, which will host the FIFA World Cup 2018 matches. The opening was originally planned in 2018. However, as of May 2013 was completed only pre-development, competition for the design itself was not yet declared, and therefore, the construction time again shifted, and by 2018 the opening is not realistic.[3]

See also

References

  1. ^ a b c d e МЕТРОПОЛИТЕНЫ РОССИИ за 2012 год. Новосибирский метрополитен (in Russian). Novosibirsk metro. 2012. Retrieved 2013-09-03. {{cite web}}: Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  2. ^ Перевозка пассажиров
  3. ^ E1.RU - Вторую ветку метро к ЧМ-2018 построить не успеют