Line 1 (Shaoxing Metro)
Line 1 | |
---|---|
1 | |
Overview | |
Status | Under construction |
Locale | Shaoxing, Zhejiang Province |
Service | |
Type | Rapid transit |
System | Shaoxing Metro |
History | |
Planned opening | 2021 |
Technical | |
Line length | 26.8 km[1] (main line) 7.3 km[1] (Branch) |
Character | Underground and overground |
Line 1 of Shaoxing Metro (Chinese: 绍兴轨道交通一号线; pinyin: Shàoxīng Guǐdào Jiāotōng Yīhào Xiàn) is a metro line under construction.
The mainline will be 26.8 km (16.7 mi)[1] long and will run between Jianhu Town station in Yuecheng District and Diyang Road station in Keqiao District, passing through the city center of Shaoxing with 19 stations. Trains on the mainline will continue west beyond Diyang Road Station into Hangzhou via the Hangshao line.
The branch line will branch off at Zhanqian Avenue and head north for 7.3 km[1] to Keqiao Coach Terminal stopping at six stations.[2]
Phase 1 of the line is expected to be operational by 2021.[3]
Stations
Service routes | Station name | Connections | |||
---|---|---|---|---|---|
English | Chinese | ||||
● | ● | Jianhu Town | 鉴湖镇 | ||
● | ● | Yanghe Road | 阳和路 | ||
● | ● | Yushan Road | 玉山路 | ||
● | ● | Fenghuang Road | 凤凰路 | ||
● | ● | Chengnan Avenue | 城南大道 | ||
● | ● | Toulaohe Road | 投醪河路 | ||
● | ● | Tashan | 塔山 | ||
● | ● | City Square | 城市广场 | ||
● | ● | Template:ShaoxingM stations | 火车站 | ||
● | ● | North 2nd Ring Road | 二环北路 | ||
● | ● | Fenglin Road | 凤林路 | ||
● | ● | Jinghu | 镜湖 | 2 | |
● | ● | Olympic Center | 奥体中心 | ||
● | ● | Lüyun Road | 绿云路 | ||
● | ● | Zhanqian Avenue | 站前大道 | ||
● | | | Jingshui Road | 镜水路 | ||
● | | | Guazhuhu | 瓜渚湖 | ||
● | | | Jinkeqiao Avenue | 金柯桥大道 | ||
● | | | Diyang Road | 笛扬路 | Keqiao | |
● | Qunxian Road | 群贤路 | |||
● | Higher Education City | 高教园区 | |||
● | Daqing Temple | 大庆寺 | |||
● | Template:ShaoxingM stations | 绍兴北站 | |||
● | Keqiao Coach Terminal | 柯桥客运站 | |||
Through operation to Hangshao line
An extension of Line 1 into Hangzhou, called the Hangshao intercity railway or Hangshao line, also known as Keqiao line, is also under construction.[4] The extension will add 20.2 km and 9 stations to Line 1.[5]
Station Name | Connections | Distance km | ||
---|---|---|---|---|
English | Chinese | |||
Guniangqiao | 姑娘桥 | 5 (Hangzhou Metro) | ||
Yaqian | 衙前 | |||
Yangxunqiao | 杨汛桥 | |||
Qianqing | 钱清 | |||
Keqiao West | 柯桥西 | Shaoxing Tourism New Transit railway (via Qianqing railway station) |
||
Xisha Road | 西沙路 | |||
Hu'an Road | 湖安路 | |||
Jishan Road | 稽山路 | |||
Kehua Road | 柯华路 | |||
Diyang Road | 笛扬路 | 1 (Shaoxing Metro) |
References
- ^ a b c d "绍兴地铁1号线初步设计获批复!24个站分别位于这里". 2018-10-11.
- ^ "省发展改革委关于绍兴市城市轨道交通1号线工程初步设计的批复". www.zjdpc.gov.cn. Retrieved 2019-02-07.
- ^ "绍兴市城市轨道交通1号线工程环境影响报告书全本" (PDF).
- ^ "杭绍城际轨道工程进展如何?速来看各站点的效果图-住在杭州". zzhz.zjol.com.cn. Retrieved 2019-02-07.
- ^ "杭州至绍兴城际铁路工程环评第一次公示·柯桥日报". epaper.zgkqw.com. Retrieved 2019-02-07.