Jump to content

Line 1 (Shenyang Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Garuda3 (talk | contribs) at 11:06, 3 February 2021 (added Category:Rapid transit lines in China using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
 1 
Shenyangzhan station
Overview
StatusOperational
OwnerShenyang
LocaleShenyang, Liaoning, China
Termini
Stations22
Service
TypeRapid transit
SystemShenyang Metro
Services1
Operator(s)Shenyang Metro Corporation
History
Opened27 September 2010
Technical
Line length27.80 km (17.27 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Shisanhaojie Depot
Shisanhaojie
Zhongyangdajie
Qihaojie
Sihaojie
Chuangmou River
Zhangshi
Freight Railway
Kaifadadao
Yuhongguangchang
Yingbinlu
Shenshan Railway
Zhonggongjie
Qigongjie
Weigong canal
Baogongjie
Tiexiguangchang Line 9
Yunfengbeijie
Shenyang railway station
Shenyangzhan
Taiyuanjie
Line 4
Nanshichang
Lines 1 and 2 connection
Qingniandajie
Huaiyuanmen
Zhongjie
Dongzhongjie
Pangjiangjie
Limingguangchang

Line 1 of the Shenyang Metro (Chinese: 沈阳地铁一号线; pinyin: Shěnyáng Dìtiě Yī Hào Xiàn) is a rapid transit line running from west to east Shenyang. It was opened on 27 September 2010. This line is 27.80 km long with 22 stations.[1]

Opening timeline

Segment Commencement Length Station(s) Name
Shisanhaojie — Limingguangchang 27 September 2010 27.8 km (17.27 mi) 22 Phase 1

Stations (west to east)

station name Transfer Distance
km
Location
Pinyin Chinese
Template:SYM stations 十三号街 0.00 0.00 Tiexi
Template:SYM stations 中央大街 1.00 1.00
Template:SYM stations 七号街 1.40 2.40
Template:SYM stations 四号街 1.50 3.90
Template:SYM stations 张士 1.55 5.45
Template:SYM stations 开发大道 1.40 6.85
Template:SYM stations 于洪广场 1.50 8.35 Yuhong
Template:SYM stations 迎宾路 1.00 9.35
Template:SYM stations 重工街 1.95 11.30 Tiexi
Template:SYM stations 启工街 1.05 12.35
Template:SYM stations 保工街 1.00 13.35
Template:SYM stations 铁西广场  9  1.40 14.75
Template:SYM stations 云峰北街 1.15 15.90
Template:SYM stations 沈阳站 Shenyang railway station SYT 1.60 17.50 Heping
Template:SYM stations 太原街 0.95 18.45
Template:SYM stations 南市场 1.20 19.65
Template:SYM stations 青年大街  2  1.10 20.75 Shenhe
Template:SYM stations 怀远门 1.30 22.05
Template:SYM stations 中街 1.35 23.40
Template:SYM stations 东中街 0.75 24.15 Dadong
Template:SYM stations 滂江街  10  1.65 25.80
Template:SYM stations 黎明广场 1.30 27.10

Rolling stock

Type Time of manufacturing Series Sets Assembly Notes
Type B 2008 - 2010 DKZ17 23 Tc+Mp+M+T+Mp+Tc Manufactured by Changchun Railway Vehicles[2]

Future

An eastern extension is planned with ten stations and a length of 16.15 kilometres (10.04 mi). Construction started on 26 December 2020.[3]

References

  1. ^ "沈阳地铁1号线车站站名"出炉"" (in Chinese). 沈阳地铁官方网站. Archived from the original on 28 February 2014. Retrieved 4 October 2012.
  2. ^ "系统异常". chinacnr.com (in Chinese). Archived from the original on 13 December 2014. Retrieved 30 April 2015.
  3. ^ "『沈阳』地铁6号线、1号线东延线开工". www.rail-transit.com. Retrieved 2021-01-10.