LAX/Metro Transit Center station
General information | |||||
---|---|---|---|---|---|
Coordinates | 33°56′59.5″N 118°22′43.3″W / 33.949861°N 118.378694°W | ||||
Owned by | Metro and LAWA (Los Angeles World Airports) | ||||
Line(s) | |||||
Platforms | 1 island platform (Metro) 1 island platform (APM) | ||||
Tracks | 4 (2 Metro) 2 APM | ||||
Connections | LAX Automated People Mover[1] | ||||
Construction | |||||
Bicycle facilities | TBD | ||||
Accessible | Yes | ||||
Other information | |||||
Status | Under construction[2] | ||||
History | |||||
Opening | 2023 | ||||
Future services | |||||
Lua error in Module:Adjacent_stations at line 237: Unknown line "LAX APM". | |||||
|
LAX/Metro Transit Center is an under-construction infill light rail transport hub in the Los Angeles County Metro Rail system, located near the intersection of Aviation and 96th Street in the Westchester district of Los Angeles. The station was designed as a station for the Crenshaw/LAX Line[3] and the new terminal station of the C Line.[4] In 2014, LAWA and the LA Metro committee approved a plan for a people mover to the LAX airport terminals, which will connect to Metro at this station.
Plans for both the new airport station and the Aviation/Century station continue. The Century railroad bridge was demolished on July 25, 2014. The LAX/Metro Transit Center station is currently under construction and slated to open in 2023.
Station layout
L4 LAX People Mover platforms |
Westbound | ← LAX People Mover (under construction) toward Terminals 3/4/TBIT (ITF West) |
Island platform, doors will open on the left | ||
Eastbound | → LAX People Mover (under construction) toward CONRAC Terminus → | |
L3 Metro Rail platforms |
Northbound | ← K Line(under construction) toward Expo/Crenshaw (Westchester/Veterans) |
Island platform, doors will open on the left and right | ||
Southbound | → K Line(under construction) toward Aviation/Century (Terminus) | |
L2 | Mezzanine | Faregates, Ticket machines |
G | Street level | Exit/entrance, ITF East, Metro Bus Plaza, Metro Bike Hub |
Future rail transfers
Metro has proposed to make this station the terminus for the rapid transit Sepulveda Pass Corridor. Metro in the route planning stage for phase one as of 2019[update]. The station is expected to be the terminus of the second phase of construction with completion planned for around 2040.
References
- ^ "Metro Board approves new station at Aviation/96th as best option to connect to LAX automated people mover". The Source. Metro (LACMTA). June 26, 2014. Retrieved 2014-06-26.
Should LAWA move the people mover alignment back to 98th Street — as was previously studied — Metro would seek to make the Aviation/Century station as the primary connection point to the people mover.
- ^ "LAX people mover breaks ground". masstransitmag.com. March 25, 2019. Retrieved October 5, 2019.
- ^ Hymon, Steve (August 18, 2016). "Subway turnback, Airport Connector receive state cap-and-trade funds". The Source.
- ^ England-Nelson, Jordan (June 26, 2014). "New Metro station approved that will link LAX with metro rail system". DailyBreeze.com.