Jump to content

Dazhou station (Guangzhou Metro)

Coordinates: 23°09′59″N 113°13′47″E / 23.166369°N 113.229667°E / 23.166369; 113.229667
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GMB205 (talk | contribs) at 06:19, 29 December 2023 (Station information). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Dazhou

大洲
Guangzhou Metro
Platform
Chinese name
Simplified Chinese大洲站
Traditional Chinese大洲站
Transcriptions
Standard Mandarin
Hanyu PinyinDàzhōu Zhàn
Yue: Cantonese
Jyutpingdaai6zau1 zaam6
General information
Other namesWeichong (韦涌) (planning name)
LocationDazhou Road (大洲路) within Dazhou Village (大洲村), Shibi Subdistrict, Panyu District, Guangzhou, Guangdong
China
Coordinates23°09′59″N 113°13′47″E / 23.166369°N 113.229667°E / 23.166369; 113.229667
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code7 01-1
History
Opened1 May 2022
Services
Preceding station Guangzhou Metro Following station
Chencunbei
towards Meidi Dadao
Line 7 Guangzhou South Railway Station
towards Yanshan

Dazhou Station (Chinese: 大洲站; pinyin: Dàzhōu Zhàn; Jyutping: daai6zau1 zaam6) is a station of Guangzhou Metro Line 7, located underground within Dazhou Village on Dazhou Road, Shibi Subdistrict, Panyu District, Guangzhou, Guangdong Province, China.[1] The station was opened on 1 May 2022, with the opening of the western extension of Line 7.[2][3][4] This is the last station on the line westbound before it enters Foshan's Shunde District.

History

The station was handed over to the '3 Powers' on 21 October 2021, making it the first station on the western extension of Line 7 to do so.[5]

Station information

G Street level Exits B, D
L1
Concourse
Lobby Customer Service, Vending Machines, ATMs
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Chencunbei)
Island platform, doors will open on the left
Platform 1  7  towards Yanshan (Guangzhou South Railway Station) arrow for R
Exit number Exit location
Exit B Dazhou Industrial Road
Exit D Weida Road

[1]

References

  1. ^ a b "大洲". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
  2. ^ "广州地铁七号线西延段将于5月1日14时正式开通". 新快报 (in Simplified Chinese). 2022-04-30. Retrieved 2023-05-13.
  3. ^ "Straight ahead! Guangzhou Line 7 Shunde section preemptive trial ride! There is a "third toilet" in the station". LaiTimes. 2022-01-28. Retrieved 2023-05-14.
  4. ^ "Guangzhou Metro Line 7 extension opens on May 1". GD Today. 2022-05-02. Retrieved 2023-05-14.
  5. ^ "离开通又近了!广州7号线西延顺德段首批车站"三权"移交". 南方日报 (in Simplified Chinese). 2021-10-22. Retrieved 2023-05-13.