Line 2 (Shijiazhuang Metro)
Appearance
Line 2 | |
---|---|
2 | |
Overview | |
Status | Under construction |
Owner | Shijiazhuang |
Locale | Shijiazhuang, Hebei, China |
Termini | |
Stations | 15 |
Service | |
Type | Rapid transit |
System | Shijiazhuang Metro |
Services | 1 |
Operator(s) | Shijiazhuang Metro Corporation |
History | |
Opened | August 2020 (Planned)[1] |
Technical | |
Line length | 15.5 km (9.6 mi)[1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 2 of the Shijiazhuang Metro (Chinese: 石家庄地铁二号线; pinyin: Shíjiāzhuāng Dìtiě Èr Hào Xiàn) is an under construction rapid transit line in Shijiazhuang. The line will be 15.5 km (9.6 mi)[1] long with 15 stations. It will open in August 2020.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Xigucheng — Jiahua | August 2020 (Planned)[1] | 15.5 km (9.6 mi)[1] | 15 | Phase 1 |
Stations
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Template:ShijiazhuangM stations | 西古城 | ||||||
Template:ShijiazhuangM stations | 铁道大学 | ||||||
Template:ShijiazhuangM stations | 运河桥 | ||||||
Template:ShijiazhuangM stations | 建和桥北 | ||||||
Template:ShijiazhuangM stations | 长安公园 | ||||||
Template:ShijiazhuangM stations | 北国商城 | 1 | |||||
Template:ShijiazhuangM stations | 大戏院 | ||||||
Template:ShijiazhuangM stations | 新世隆 | ||||||
Template:ShijiazhuangM stations | 东岗头 | ||||||
Template:ShijiazhuangM stations | 东三教 | ||||||
Shijiazhuangzhan | 石家庄站 | 3 SJP | |||||
Template:ShijiazhuangM stations | 塔谈 | ||||||
Template:ShijiazhuangM stations | 桥西留村 | ||||||
Template:ShijiazhuangM stations | 南位 | ||||||
Template:ShijiazhuangM stations | 嘉华 | ||||||