A2 autostrada (Poland)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2.220.208.227 (talk) at 14:48, 23 August 2013 (→‎Exit list). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Autostrada A2 shield}}
Autostrada A2
Route information
Part of E30
Length475 km (295 mi)
610 km (379 mi) planned
Major junctions
From - border with Germany at Świecko
Major intersections near Świebodzin

west of Poznań
near Poznań
east of Poznań
near Łódź (partially open)
near Warsaw

near Międzyrzec Podlaski (planned)
ToFile:M1 Belarus.png - border with Belarus at Kukuryki, near Terespol/Brest (planned)
Location
CountryPoland
Major citiesPoznań, Łódź, Warsaw
Highway system

The autostrada A2 in Poland is a motorway which runs from west to east through central Poland, from the Polish-German border in Świecko/Frankfurt (Oder), where it connects to the German A12 autobahn, through Poznań and Łódź to Warsaw. The motorway is a part of the European route E30 connecting Berlin and Moscow.

According to current plans A2 will be gradually extended eastwards from Warsaw, all the way to the Polish-Belarusian border in Terespol/Brest, where it will connect to the M1 highway. This part of the motorway may be completed around 2020 [1] depending on the availability of government funding. Its first 21 km segment serving as the bypass of Mińsk Mazowiecki opened in August 2012.

History of construction

Tarnawa toll plaza
A2 near Poznań, opened in 2003
A2 near Poznań Komorniki interchange
A2 near Kleszczewo (east of Poznań), opened in 2003
Ticket machine at Gołuski toll plaza
Toll price list (section Gołuski-Tarnawa)

The first highway planned along part of this route was a Reichsautobahn initiated by Nazi Germany to connect Berlin with Poznań (Posen). The construction of this highway, accelerated after Poznań was incorporated into Germany following the Invasion of Poland in 1939, was interrupted by the war and never finished, but traces of its earthworks were clearly visible on satellite photographs for decades afterwards, especially between the border with Germany and Nowy Tomyśl. Most of these traces have now disappeared as the modern motorway was built largely following the same route. A short stretch of the uncompleted highway between the border and Rzepin was finished as a dual carriageway road after 1945, in effect forming an extension of the German A 12 highway (opened as a Reichsautobahn in the 1930s). Except for this stretch, the construction work was not continued in the decades after the war.

New plans to build the A2 motorway were seriously formulated in communist Poland in the 1970s, possibly with the goal of completing it in time for the Moscow Olympics in 1980. Because of the economic crisis which hit the country in the late 1970s and continued throughout the 1980s, only a 50 km (31 mi) section from Września to Konin was opened in the 1980s. Construction of another stretch (between Łódź and Warsaw) was started and then abandoned, leaving an interesting ruin informally named Olimpijka, which was in turn demolished around 2010 when building of the motorway resumed.

Intensive construction of the motorway started only in 2001 after the fall of communism in Poland in 1989. Out of the planned total length of 610 km (380 mi), 359 km (223 mi) have been completed. A section of about 150 km (93 mi) (Nowy Tomyśl - Poznań - Września - Konin) has been fully open since 2004. This section is a toll road, with the exception of a short stretch through Poznań which serves as that city's bypass (between the interchanges at Głuchowo and Kleszczewo). An additional 100 km (62 mi) section from Konin to Stryków near Łódź was opened on 26 July 2006. A short 4.8 km (3.0 mi) bypass of Stryków, consisting of a 2 km extension of the A2 and a provisional single carriageway section of future motorway A1, was opened in December 2008, to ease the heavy traffic in that town generated when the motorway reached it.

As of winter 2009/2010, the plan was to finish the whole section between the border with Germany and Warsaw by the Spring of 2012, giving the Polish capital its first motorway connection to the European motorway network in time for the Euro 2012 football championships. That ambitious goal was jeopardised due to various difficulties encountered in finalizing the construction contracts and the delays that resulted. The 90 km (56 mi) section from Stryków to Warsaw was to be built in a public-private partnership, but the negotiations between the government and private companies interested in participating collapsed in February 2009 due to disputes over financing terms.[2] It was then decided that this section of the motorway would be built using public funds alone. The new bidding process was started on 27 March,[citation needed] and the contracts for design and construction of the road were signed on 28 September.[3] The section had been divided into 5 parts and so construction work began in 2010. The contractors were required to have the motorway open to traffic in time for Euro 2012. This goal was an ambitious one and ultimately proved challenging, given the possibility of unexpected delays during construction[4] and the fact that the Chinese consortium abandoned the project less than a year later,[5] so that new contractors had to be selected to replace it. The goal was to have this motorway stretch provisionally opened to traffic in time for Euro 2012, even if it's not fully completed, with various restrictions such as a lower speed limit to ensure safety. For a while it was not clear whether even this limited goal would be reached, but the motorway opened to traffic in June 2012 after very intensive construction work in the final few months.

In November 2011 construction of the stretch to the German border from Nowy Tomyśl had been completed. The road was opened to public traffic on 1 December. Toll plazas on this stretch of the highway wasn't open until May 2012 so use of the western section of the A2 was free of charge until then.[6]

It is the A and C stretches of Łódź - Warsaw section which are not yet fully finished. While the road is open to traffic, one interchange (with road 50) is not yet open, and some overpasses for local roads are still not completed. The plan was to complete them all by the Fall of 2012. At the terminus of the motorway in Warsaw it forks into two express roads, S2 and S8, but only S8 is currently open while S2 should be completed in 2013.

In May 2013 Interchange with S3 (Jordanowo) was opened to traffic.[7] First stretch is between the interchange with the A2 motorway and the "Świebodzin North" interchange. In June 2013 S3 was extended further and opened to traffic to reach from the "Świebodzin South" interchange to the existing stretch of the S3 expressway at Sulechów. In July 2013 the elevated bypass of Świebodzin between the interchanges "Świebodzin North" and "Świebodzin South" fully opened to traffic thus fully extending the S3 from the A2 motorway to Sulechów.[8]

Motorway section Length Constructed Note
Świecko - Nowy Tomyśl 105.9 km (65.8 mi) 2009 - 2011 opened 1 December 2011; toll motorway
Nowy Tomyśl - Poznań Komorniki 50.4 km (31.3 mi) 2001 - 2004 opened 27 October 2004; toll motorway
Poznań Komorniki - Poznań Krzesiny 13.3 km (8.3 mi) 2001 - 2003 opened 13 September 2003
Poznań Krzesiny - Września 37.5 km (23.3 mi) 2001 - 2003 opened 27 November 2003; toll motorway
Września - Golina 34.2 km (21.3 mi) 1977 - 1985 opened 9 October 1985; toll motorway since 20 December 2002
Golina - Konin Zachód 13.8 km (8.6 mi) 1986 - 1988 opened 10 November 1988
Konin Zachód - Stryków 103 km (64 mi) 2004 - 2006 opened 26 July 2006; toll motorway since 1 July 2011
Stryków - Łódź Północ 1.7 km (1.1 mi) 2008 opened 22 December 2008
Łódź Północ - Skierniewice 32 km (20 mi) 2010 - 2012 opened to traffic on 3 June 2012, fully completed in fall of 2012[9]
Skierniewice - Grodzisk Mazowiecki 41.4 km (25.7 mi) 2010 - 2012 opened to traffic on 6 June 2012, fully completed in fall of 2012[10]
Grodzisk Mazowiecki - Pruszków 12.6 km (7.8 mi) 2010 - 2012 opened on 27 May 2012[11]
Pruszków - Konotopa 4.8 km (3.0 mi) 2010 - 2012 opened on 22 May 2012 [12]
Choszczówka Stojecka - Kałuszyn 20.8 km (12.9 mi) 2009 - 2012 opened 29 August 2012

Plans

The eastern section from Warsaw to the border crossing with Belarus at Kukuryki near Brest (connecting with M1), about 170 km (110 mi) in length, is still in planning stages. The decision finalizing the route of this section was announced in December 2011[13] but actual construction will not begin in the near future, and the schedule depends on the availability of government funding. The exception is a short (21 km (13 mi) long) section of A2 forming the bypass of Mińsk Mazowiecki which has been under construction since August 2009. It opened to traffic in August 2012.[14] The construction of the section between Warsaw and Siedlce should start first because of higher traffic density. The construction of the remaining section to the border with Belarus may begin considerably later, since the traffic density along this route is low and there is no urgent need for a high capacity road.

It is worth noting that the A2 motorway doesn't actually run through Warsaw, as the inhabitants of the districts through which it was to pass have successfully blocked its construction. This outcome was somewhat unusual, since the corridor for the motorway has been reserved by the city planners since the 1970s and kept free of construction. Instead, the traffic will be rerouted through two express roads (S2 and S8), of lower standard than the originally planned motorway. Paradoxically, one of these roads (S2) will run along the originally planned motorway corridor, so the residents who protested the construction will still end up with a busy road running through their districts, possibly even more inconvenient than the original road would have been. In the most affected area, the district of Ursynów, the express road will run in a tunnel, which will be built at considerable expense.

Exit list

A 12 E30 Frankfurt (Oder), Berlin

(0) Frankfurt (Oder)/Świecko border crossing
(1) Świecko DK 29 (signed as DK 2)
Services Gliniec (dir. Świecko)
Services Sosna(dir. Warszawa)
(2) Rzepin DK 92
() Road toll Tarnawa
(3) Torzym DW 138
Services Walewice (dir. Świecko)
Services Koryta (dir. Warszawa)
(4) Interchange Jordanowo S 3
(5) Trzciel
(6) Nowy Tomyśl DW 305
Wytomyśl (dir. Świecko) parking area
Kozielaski (dir. Warszawa) parking area
Services Sędzinko (dir. Świecko)
Services Zalesie (dir. Warszawa)
(7) Buk DW 307
Dopiewiec (dir. Świecko) parking area
Konarzewo (dir. Warszawa) parking area
() Road toll Gołuski

{Poznań - Zachód S 5 E261, existing S 11


(9) Interchange Poznań - Komorniki DK 5 E261
Tunnel under railway line in Luboń 130 m
(10) Poznań - Luboń (formerly Dębina) DW 430
Lucjan Ballenstaedt's bridge over Warta river 306 m
Bridge over railway line in Poznań
(11) Interchange Poznań - Krzesiny DK 11 S 11

Services Tulce (dir. Świecko)
Services Krzyżowniki (dir. Warszawa)
(12) Interchange Poznań - Wschód S 5 E261
() Road toll Nagradowice
Chwałszyce (dir. Świecko) parking area
Targowa Górka (dir. Warszawa) parking area
(13) Września DK 92
Sołeczno (dir. Świecko) parking area
Gozdowo (dir. Warszawa) parking area
Skarboszewo (dir. Świecko) parking area
(15) Słupca DW 466
Lądek (dir. Warszawa) parking area
() Road toll Lądek
(16) Sługocin DW 467
Bridge over Warta river 250 m
Services Osiecza
(17) Interchange Konin - Zachód DK 25

(18) Konin - Wschód DK 72
() Road toll Żdżary
Kuny (dir. Świecko) parking area
Leonia (dir. Warszawa) parking area
(19) Koło DW 470
Police (dir. Świecko) parking area
Łęka (dir. Warszawa) parking area
Bridge over Warta river
Sobótka (dir. Świecko) parking area
Cichmiana (dir. Warszawa) parking area
(20) Dąbie DW 473
Kozanki (dir. Świecko) parking area
Zaborów (dir. Warszawa) parking area
(21) Wartkowice DW 703
Chrząstów parking area
(22) Interchange Emilia DK 1 E75
Ciosny parking area
(22) Piątek DW 702
(23) Stryków DK 14 DK 71
(24) Interchange Łódź-Północ (planned) A 1 E75
Rest area Nowostawy (dir. Świecko) (planned)
Rest area Niesułków (dir. Warszawa) (planned)
Toll point Road toll Rozdzielna (planned)
(25) Łowicz DW 704
Rest area Parma (dir. Świecko) (planned)
Rest area Polesie (dir. Warszawa) (planned)
(26) Skierniewice DK 70
Rest area Bolimów (dir. Świecko) (planned)
Rest area Mogiły (dir. Warszawa) (planned)
(27) Zyrardów DK 50
Rest area Baranów (dir. Świecko) (planned)
Rest area Baranów (dir. Warszawa) (planned)
(28) Grodzisk Mazowiecki DW 579
Rest area (dir. Świecko) (planned)
Rest area (dir. Warszawa) (planned)
Toll point Road toll (planned)
(29) Pruszków DW 719
(30) Interchange Konotopa S 8 E67

Road will continue as S 2 E30Southern Warsaw Bypass.
After bypassing Warsaw, road will continue as A 2


Autobahnkreuz Interchange Konik Nowy (planned) DK 2 E30
Parkplatz Parking lot (planned)
Parkplatz Parking lot (planned)
(32) Mińsk Mazowiecki - Arynów
(33) Mińsk Mazowiecki - Airport DK 50
AB-Rast.svg Under construction Rest area (under construction)
AB-Rast.svg Under construction Rest area (under construction)
(34) Ryczołek DK 2 E30
Parkplatz Parking lot (planned)
Parkplatz Parking lot (planned)
Kotuń (planned)
Siedlce - Swoboda (planned) DK 2 E30
Siedlce - Białki (planned) DK 63
Rest area (planned)
Rest area (planned)
Łukowisko (planned) DK 19
Rest area (planned)
Rest area (planned)
Biała Podlaska - Zachód (planned)
Biała Podlaska - Wschód (planned)
Parkplatz Parking lot (planned)
Parkplatz Parking lot (planned)
Kukuryki (planned) DK 68
(-) Border crossing Kukuryki - Kazlovichy
M 1 E30
Minsk, Moscow

See also

References

  1. ^ Official GDDKiA information page
  2. ^ Budowa autostrady A2 do stolicy znów się opóźniTemplate:Pl icon
  3. ^ www.newsweek.plTemplate:Pl icon
  4. ^ Rząd przejmuje budowę autostrady A2 Template:Pl icon
  5. ^ [1]
  6. ^ "Autostrada Wielkopolska - News Drivers". Autostrada Wielkopolska. Retrieved 2010-11-25.
  7. ^ "Węzeł Jordanowo od 27 maja otwarty".
  8. ^ "Obwodnica Świebodzina w ciągu S3 oddana do ruchu".
  9. ^ Łódzkie odcinki A-2 już otwarte !
  10. ^ A2 - czekały na nią pokolenia…
  11. ^ "Kolejny odcinek A2 otwarty w obu kierunkach". 27 May 2012.
  12. ^ "Autostrada do Pruszkowa". 22 May 2012.
  13. ^ Official announcement from GDDKiA webiste
  14. ^ Autostrada gotowa, więc jej nie otworzą. "Trudny grunt"

External links