Jump to content

Aylesbury Vale Parkway railway station

Coordinates: 51°49′55″N 0°51′40″W / 51.8319°N 0.8612°W / 51.8319; -0.8612
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Redrose64 (talk | contribs) at 09:41, 21 July 2018 (Undid revision 851226733 by 2A00:23C4:8C8C:7800:3535:68A3:D8AC:5EEC (talk) WP:CRYSTAL). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Aylesbury Vale Parkway
General information
LocationDistrict of Aylesbury Vale
Coordinates51°49′55″N 0°51′40″W / 51.8319°N 0.8612°W / 51.8319; -0.8612
Managed byChiltern Railways
Platforms1
Other information
Station codeAVP
Key dates
14 December 2008Opened

Aylesbury Vale Parkway railway station is a railway station serving villages northwest of Aylesbury, England. It also serves the Berryfields and Weedon Hill housing developments north of the town. The station and all trains serving it are operated by Chiltern Railways.

Background

Aylesbury Vale Parkway is on the former Metropolitan and Great Central Joint Railway, which formed part of the Great Central Main Line route linking London and Aylesbury with the East Midlands and North. The Office of the Deputy Prime Minister announced in April 2006 that it would provide £8.17 million for track and signalling improvements to the existing line, which then was only used to carry freight. A further £2.8 million was invested by Chiltern Railways' owners Laing Rail and £1 million by Buckinghamshire County Council.[1]

Construction began in October 2007[2] and the rail works were completed by Carillion Rail.[3]

The station was originally not due to be completed until 2010[1] but actually opened on 14 December 2008 although the station building did not open until 1 June 2009.[4] In the interim while the station buildings were being completed, tickets and facilities were provided from Portakabins.[5]

Services and facilities

Aylesbury Vale Parkway has links to existing public transport bus services along the A41 corridor. A bus service from the station to several villages north of Aylesbury began on 15 December 2008. Other bus journeys include the Green Route 4 of the Rainbow Routes served by Redline Buses and very infrequent services to and from Bicester on the route 18 run by Langston & Tasker. The station has a taxi rank, car park, a charging point for electric vehicles and parking bays for motorcycles and pedal cycles.

The off-peak train service is one departure per hour to Marylebone via Amersham. In peak periods there are up to three trains per hour to Marylebone.[6] The journey time to Aylesbury is about four minutes.

Preceding station National Rail National Rail Following station
Terminus   Chiltern Railways
London–Aylesbury line
  Aylesbury
  Future services  
Winslow   East West Rail
London Marylebone-Milton Keynes Central
  Aylesbury

Plans

Bus stop and shelter for Arriva route 16
Motorcycle parking bay (left) and electric vehicle charging bay (right)
Cycle shelter

East West Rail plans to extend passenger services northwards to Bletchley and Milton Keynes by 2025 using parts of the former Varsity Line.[7][8][9] At present trains (currently run only as specials on Bank Holidays) between Aylesbury and Quainton Road cannot serve Aylesbury Vale as there is no platform on the through route. In the East West Rail consultation it is proposed that the station would have two new through platforms and a terminating platform for terminating services to and for trains to Marylebone.[10]

The track between Aylesbury and the new station was upgraded to continuous welded rail with a maximum line speed for DMU passenger trains of 60 mph (97 km/h). It is proposed that when services are extended to the north, trains to Marylebone will run via High Wycombe and not Amersham.[7]

See also

References

  1. ^ a b "New Aylesbury Vale Parkway station to open in 2010". Chiltern Railways. 11 April 2006. Archived from the original on 21 June 2008. Retrieved 2008-06-04. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  2. ^ "The next stop will be Aylesbury Vale Parkway". Buckinghamshire County Council. Retrieved 4 June 2008. [dead link]
  3. ^ "Access to Aylesbury Vale Parkway". Buckinghamshire County Council. 19 October 2008. Retrieved 30 December 2008. [dead link]
  4. ^ "Aylesbury Vale Parkway fully open on Monday, 1 June". Archived from the original on 31 May 2009. Retrieved 1 June 2009. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  5. ^ "Aylesbury Engineering Works: 18 – 20 November". Chiltern Railways. 30 October 2008. Archived from the original on 20 April 2013. Retrieved 18 November 2008. {{cite news}}: Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  6. ^ "Aylesbury Vale Parkway". Chiltern Railways. Archived from the original (Microsoft Word) on 27 September 2007. Retrieved 15 April 2008. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  7. ^ a b "Prospectus" (PDF). East West Rail Consortium. Archived from the original (PDF) on 3 March 2012. Retrieved 14 December 2011. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  8. ^ "RAIL" (685). 14–28 December 2011: 10–11. {{cite journal}}: Cite journal requires |journal= (help)
  9. ^ Bucks Herald (31 March 2014). "Disappointment as East West Rail Delayed by two Years". Bucks Herald. Retrieved 28 April 2014.
  10. ^ EWR Alliance