Bongaigaon Thermal Power Station

Coordinates: 26°26′N 90°22′E / 26.44°N 90.36°E / 26.44; 90.36
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Whpq (talk | contribs) at 19:22, 14 January 2016 (change lede to reflect name). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bongaigaon Thermal Power Station
Map
Official nameBongaigaon Thermal Powet Station
CountryIndia
LocationSalakati, Bongaigaon, Kokrajhar district, Assam
Coordinates26°26′N 90°22′E / 26.44°N 90.36°E / 26.44; 90.36
StatusOperational
Commission date
  • 2015
OperatorNTPC
Thermal power station
Primary fuelCoal-fired
Power generation
Nameplate capacity750 MW

www.ntpc.co.in

Bongaigaon Thermal Power Station is under construction power project located at Salakati near Bongaigaon in Kokrajhar district in Indian state of Assam. The power plant is one of the coal based power plants of NTPC.

The coal for the plant will be derived from Makum coal mines at Margherita, Assam and also from Eastern Coalfields Limited (ECL).[1]

History

Bongaigaon Thermal Power Station was the biggest plant situated at Salakati in the district of Kokrajhar in Assam. It consisted of four coal-fired units of 60 MW each. These units came into operation during the year 1981 to 1986 in two stages. In the first stage, two units (Unit I & II) were commissioned in 1981 and 1982 respectively. In the second stage, two units (Unit-III & IV) were commissioned in 1985 and 1986 respectively.

Major equipment like boiler, turbine, auxiliaries like BFP, CEP, PA fans, bowl mills etc. were supplied by BHEL. In coal handling plant, major equipment like primary and secondary crusher were supplied by TRF and wagon trippler was supplied by Heavy Engineering Corporation (HEC). Since commissioning none of the unit could deliver the desired level of generation for various reasons. Some of the main reasons were problem in the boiler, turbine, mill and other unit auxiliaries and also in the coal handling plant. During July 2002, the plant was running at a very low PLF of 4.6%, very high auxiliary power consumption of 22.68% very high specific oil consumption of 59.12 ml/kwhr and height specific coal consumption of 0.85 kg/kwhr with a coal of GCV 3500 Kcal/kg. None of the units could deliver the required level of generation and the maximum PLF of the plant in the last twenty years of operation has been only 24.23%. As a result, the station had to be shut down. It had been found that although it was technically feasible to renovate the existing units of BTPS, it would not have been economically viable as the tariff works out to about Rs 3.16 per unit after carrying out R&M at an estimated cost of about Rs 7 billion. Hence, capital grant/viability gap funding of Rs 3.5 billion would have to be provided to bring down the tariff to an acceptable level of Rs 2.50 per unit. The alternative is NTPC's proposal to set up a new 750 MW (3 X 250 MW) Thermal Power Station at the same location, at a total project cost of approximately Rs Rs 44.9624 billion based on third quarter 2006 price level. The power station would be based on Fuel Gas Desulphurization (FGD) technology due to high sulphur content of Assam coal, involving additional cost of Rs 0.5 crores/MW approximately.

Capacity

Its planned capacity of 750 MW (3x250 MW).

Unit Number Capacity (MW) Date of Commissioning Status
1 250 2015 June commissioned.[2]
2 250 Expected commissioning to be completed by end of 2016.
3 250 Expected commissioning to be completed by June 2017.[1]
TOTAL 750

References

  1. ^ a b "NTPC success". Telegraphindia.com. 2014-02-06. Retrieved 2015-03-30.
  2. ^ http://www.business-standard.com/article/pti-stories/bhel-commissions-250-mw-unit-of-ntpc-s-bongaigaon-power-plant-115062300449_1.html