This is an old revision of this page, as edited by Yobot (talk | contribs) at 08:58, 24 April 2016 (top: Removed invisible unicode characters + other fixes, replaced: → (2) using AWB (12004)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
Line 1
一号线
File:CRT1 Logo.png
Overview
Termini
Stations24
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corp., Ltd
History
Opened28 July 2011
Technical
Line length38.9 km (24.2 mi)
Operating speed100 km/h (62 mph)
Route map

Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.[2]

Line 1 runs 16.4 km (10.2 mi) from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of 22.4 km (13.9 mi). It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.

In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues.[citation needed] Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28.[3] An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012.

Line 1 has 14 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, and Shapingba stations. Lieshimu, Ciqikou, Shijingpo, Shuangbei, Laijiaqiao, Weidianyuan, Chenjiaqiao, Daxuecheng (University Town), and Jiandingpo stations are scheduled to open in 2013 once the Phase 2 extension of Line 1 is complete.[needs update]

Line 1 has transfer interchange stations with Line 6 at Xiaoshizi and Line 2 at Jiaochangkou in Jeifangbei CBD and at Daping. Line 1 will have transfer station when Line 3 opens later in 2011 at Lianglukou, near the Chongqing Railway Station in the Caiyuanba section of central Yuzhong.

Service routes

Current stations

Service
routes
Station code
Station name
English
Station name
Chinese
Platform types
Transfer
Location
1/01 Chaotianmen
under construction
朝天门 island (und) Yuzhong
1/02 Xiaoshizi 小什字 island (und) Template:China line
1/03 Jiaochangkou 较场口 island (und) Template:China line
1/04 Qixinggang 七星岗 island (und)
1/05 Lianglukou 两路口 island (und) Template:China line
1/06 Eling 鹅岭 island (und)
1/07 Daping 大坪 island (und) Template:China line
1/08 Shiyoulu 石油路 island (und)
1/09 Xietaizi 歇台子 island (und)
1/10 Shiqiaopu 石桥铺 island (und) Jiulongpo
1/11 Gaomiaocun 高庙村 island (und)
1/12 Majiayan 马家岩 island (und) Shapingba
1/13 Xiaolongkan 小龙坎 island (und)
1/14 Shapingba 沙坪坝 island (und)
1/15 Yanggongqiao 杨公桥 island (und)
1/16 Lieshimu 烈士墓 island (und)
1/17 Ciqikou 磁器口 side (elev)
1/18 Shijingpo 石井坡 side (elev)
1/19 Shuangbei 双碑 island (elev)
1/20 Laijiaqiao 赖家桥 island (elev)
1/21 Weidianyuan 微电园 side (elev)
1/22 Chenjiaqiao 陈家桥 side (elev)
1/23 Daxuecheng 大学城 side (elev)
1/24 Jiandingpo 尖顶坡 side (elev)

Planned

Station code
Station name
English
Station name
Chinese
Platform types
Transfer
Location
1/25 Tuanshanbao 团山堡 (elev) Bishan
1/26 Xiuhu Park 秀湖公园 (elev)
1/27 Bishan Chengbei 璧山城北 (elev)
1/28 Bishan Qinggang 璧山青杠 (elev)

References

  1. ^ "5.1节线网客流量再创新高".
  2. ^ Chongqing Metro Line 1 into trial operation
  3. ^ http://www.echinacities.com/chongqing/city-in-pulse/chongqing-s-metro-line-1-now-open.html Template:Zh icon